Loading...
HomeMy WebLinkAboutBLD02-127 Walernun & Kah BuIINng 181 Qulnq Streel, Suau 301 Pat Townsend, WA 98368 Pbaw: 360-3793208 Fa: S68J85-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: $LDOZ-127 Issued: 06/28/02 Parcel Number: 956-500-005 Job Address: 31143rd Street Zoning: RR=II Type: VV=N Occupancy: R-3/U-1 Total Occupant Load: 3/2 Nature of Work: New Sinele-family Dwellin¢ with attached ¢ara¢e Owner: Bishou Lo¢¢ine dba Bishou Brothers Construction Contractor: Same as Owner BISHOBC093D6 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUH2ED: Electrical -Contact Labor & Industries @ 360-417-2702 NOTE: Any removal of significant trees 10 feet beyond the excavated footings area and driveway shall require submittal and review of a Tree Removal permit. RF.nTTTRF.T) TNSPF.C'TT(1N5 APPRnVED/DATE TEMP EROSION & SEDIMENT CONTROL See General Condition #2 Silt Fence as needed Drive Off Mat per attached details FOOTINGS Setbacks ~ ,I~~~~z_~ Footings / I Forms Reinforcement Interior Footings Porch Piers UFER FOUNDATION Stem Wall Fonns Reinforcement Anchor Bolts w/ 2" x 2" x 3/16" square washers Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 1 of 4 a~aa~og e~~ asi.no2-iz~ REOUIR~D INSPECTIONS APPROVED/DATE SLAB -Non-Structural R-IO Insulation PLUMBING: Rough-In (D-V-T & Clean Outs) J Water Supply ~~~ y Water Hammer Arrestor @ clothes & dishwasher Hose Bibs (backflow protection, requued} Pipe Insulation - R-3 Pressure Reduction Valve if> 80 psi Water Heater R-10 under Seismic Restraint - 2 places 18" A.F.F. Pressure relief valve drain to exterior MECHANICAL ` / Whole House Ventilation @ Master Bath ~ ~~(~ 8owce Specific Fans ` Environmental Air Exhaust ducting (with backdraft damper), insulation (R-4) and terminus (located 3' from opening) FRAMING Walls Roof -Engineered truss plan to be ornsite at ~ time of inspection ~ ~ Attic Venting gable end & eave Ceilings Posts, beams & headers Treated Wood to Concrete Windows -escape, Windows -safety gtazing Windows Ufactor - .40 or better NFRC window sticker must be on Windows & doors at inspection time Air Seal Doors Ufactor - .20 or better Truss Positive Connection Fire Blocking Weather Resistive Barrier Call 48 hours before you dig for utility line locates i-soaa2a-ssss Page 2 of 4 Building Permit NBLD02-127 RF.nITiREA iN5PECTIONS APPROVED/DATE • LJ INSULATION Slab( R-10 ) Wall (R-19 ) Ceiling (R-38 ) Baffles Vapor Barrier: paint DRY WALL NAII.ING ~ "~' ~4~ ~' Walls Ceiling C~ i ~ ' ~ L Garage/House Occupancy S aration -~ nterior race a anels -~ ~~ FINAL Public Works Sign-Off House Number - 5" mrmbers Plumbing Mechanical Insulation Certificate V. B. Paint Certificate Smoke Detectors / p)/ Final -Building ~ O ~ ~ ! G ~ GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept tree of dirt and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 Building Pmnit NBLD02-127 6. The Bu~7ding Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public W orks inspection call 3852294; s minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval rior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates ~` 1-800-4245555 Page 4 of 4