HomeMy WebLinkAboutBLD02-127
Walernun & Kah BuIINng
181 Qulnq Streel, Suau 301
Pat Townsend, WA 98368
Pbaw: 360-3793208 Fa: S68J85-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: $LDOZ-127 Issued: 06/28/02 Parcel Number: 956-500-005
Job Address: 31143rd Street Zoning: RR=II Type: VV=N Occupancy: R-3/U-1
Total Occupant Load: 3/2 Nature of Work: New Sinele-family Dwellin¢ with attached ¢ara¢e
Owner: Bishou Lo¢¢ine dba Bishou Brothers Construction Contractor: Same as Owner
BISHOBC093D6
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REOUH2ED:
Electrical -Contact Labor & Industries @ 360-417-2702
NOTE: Any removal of significant trees 10 feet beyond the excavated footings area and driveway shall require
submittal and review of a Tree Removal permit.
RF.nTTTRF.T) TNSPF.C'TT(1N5
APPRnVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition #2
Silt Fence as needed
Drive Off Mat per attached details
FOOTINGS
Setbacks ~
,I~~~~z_~
Footings / I
Forms
Reinforcement
Interior Footings
Porch Piers
UFER
FOUNDATION
Stem Wall
Fonns
Reinforcement
Anchor Bolts w/ 2" x 2" x 3/16" square washers
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 1 of 4
a~aa~og e~~ asi.no2-iz~
REOUIR~D INSPECTIONS APPROVED/DATE
SLAB -Non-Structural
R-IO Insulation
PLUMBING:
Rough-In (D-V-T & Clean Outs)
J
Water Supply ~~~
y
Water Hammer Arrestor @ clothes & dishwasher
Hose Bibs (backflow protection, requued}
Pipe Insulation - R-3
Pressure Reduction Valve if> 80 psi
Water Heater
R-10 under
Seismic Restraint - 2 places
18" A.F.F.
Pressure relief valve drain to exterior
MECHANICAL `
/
Whole House Ventilation @ Master Bath ~
~~(~
8owce Specific Fans `
Environmental Air Exhaust ducting (with backdraft
damper), insulation (R-4) and terminus (located 3' from
opening)
FRAMING
Walls
Roof -Engineered truss plan to be ornsite at
~
time of inspection ~
~
Attic Venting gable end & eave
Ceilings
Posts, beams & headers
Treated Wood to Concrete
Windows -escape,
Windows -safety gtazing
Windows Ufactor - .40 or better
NFRC window sticker must be on
Windows & doors at inspection time
Air Seal
Doors Ufactor - .20 or better
Truss Positive Connection
Fire Blocking
Weather Resistive Barrier
Call 48 hours before you dig for utility line locates
i-soaa2a-ssss
Page 2 of 4
Building Permit NBLD02-127
RF.nITiREA iN5PECTIONS APPROVED/DATE
•
LJ
INSULATION
Slab( R-10 )
Wall (R-19 )
Ceiling (R-38 )
Baffles
Vapor Barrier: paint
DRY WALL NAII.ING
~ "~' ~4~ ~'
Walls
Ceiling C~ i ~ ' ~ L
Garage/House Occupancy S aration
-~
nterior race a anels -~
~~
FINAL
Public Works Sign-Off
House Number - 5" mrmbers
Plumbing
Mechanical
Insulation Certificate
V. B. Paint Certificate
Smoke Detectors / p)/
Final -Building ~
O
~ ~ ! G ~
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of way shall be kept tree of dirt
and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
Building Pmnit NBLD02-127
6. The Bu~7ding Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public W orks inspection call 3852294; s
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require review and approval rior to making changes in the field. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates ~`
1-800-4245555
Page 4 of 4