Loading...
HomeMy WebLinkAboutBLD02-125 PJw7diog and community I)evelopmeM Watamm B: Katz FluOdiog 181 Qumry Stmt Suite 301 PoA Towmeod, WA 98368 Phone: (360) 379-3208 Fax: (360) 383-7675 CITY OF PORT TOWNSEND • • CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD02-125 Issued: 07/01/02 Parcel Number: 955 900 004 Owner/ContraMor: Hamikon Heiehts LLC Installer: Kozeliskv's Home Services WAINS0626 Job Address: Lot 4: 2412 Rainier Street Zoning: PUD Type: VV=N Occupancy: R-3/U-1 Total Occupant Load: 412 Nature of Work: Set Manutartured Home with attached site-built ¢ara¢e and deck. GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUIItED: Electrical -Contact Labor & Industries @ 360-417-2702 * * *Hours of Construction are limited to 7:30 a. m. to 6: 00 p. m. Monday through Friday and prohibited on weekends and national holidays*** REOiJIRED INSPECTIONS APPROVED/DATE TEMPORARY EROSION & SEDIIIZENT CONTROL See details attached to MIP and general condition #2 Silt Fence Drive Off Mat SLAB/CONCRETE ~_-- Setbacks ^-----~-~ - -- ~ , }br~4t~ S\r~r ~ Forms ~ ~ -'. S ~ ,- Monolithic Slab/Foundation (garage) ]teinforcemert ' flk'~~~ '~~~ ~ ~~ ~. Anchor Bolts Deck Piers Alternate Braced Wall Panel Holdown Hardware UFER~ ~ l Q Ca1148 hours before you dig fer utility line locates I-800.424-5555 Page 1 of 4 Pamil q BID02-125 REQUIRED INSPECTIONS APPRnVF,D/nATF. PLUMBING (prior to skirting) -- - --- -- ----- Water Supply -Mainshut-o,~'valve (port or ball valve) installed in water supply piping prior to cormectton to home, ~/~~~ min '/."diameter, same as supply pipe Pressure Reduction Valve >f > 80 psi Hose Bibs (backflow protection requved) Pipe Insulation -Outside & in crawl space Pressure Test -100 p.s.i. J6r IS mimttes Pressure relief valve drain - to exterior of skirting, exhaust dawmvard between 6"and 24"above ground Drainage Piping -sloped min. '/. "per foot MECHANICAL (prior to skirting) Ducts & Duct Insulation ~ ~0 Dryer Exhaust -vented to outside. Factension info crawl space / requires venting through skating with no dips; follow dryer mamrfachrrer's inshucttons; total. combined length of ductitrg not to exceed 14' w/ 2-90° elbows FLOOR FRAMING (prior to akirtiag) n Anchors , / Steel Support Piers - Load tamped and installed per ~~~ ~ Z ~ Gy' mamrfacturer's installation manual; clearmlce of l8"min from lowest point of I-beam and the ground or footing for min of 7540 of area under home w/ 12"min elsewhere unless installation mamral species; otherwise area around home graded to provide runoff away from home. FRAMING: Fargineered roof truss plan to be on-site at time of inspection ~ n~ Walls ~ Z?~®Z (~/ Alternate Braced Wall Panels Header Roof Garage/House Attachment DRY WALL NAILING Garage/House Occupancy Separation with 20 minute self-closing door / 7~v~o L 9 1 Ca1148 hours before you dig for utility line locates 1-500-424-5555 Page 2 of 4 Y Ye~mil # BLD02-125 FINAL Public Works Sign-Off Electrical (L & n Sign-Off House Number -minimum 5" numbers Plumbing Mechanical Deck Pressure-Treated Framing Positive Connections • Final -Building No holes or gaps greater than %."allowed in skirting. Skdrting to be rated for contact with earth if backfill is involved Crawl space ventilation per installation manual @ 1 sq. ft./I50 sq, ft. (13 req'd); located close to corners, on at least two opposing sides for cross ventilation. Crawl space access must provide access to all areas under home; minimum 18"x 24" unless specified otherwise; covered with vinyl, pressure-treated wood or metal. 9~Z f~` ~ GENERAL CONDTfIONS 1. Contractors working on this project are required to have s Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall 6e installed on-site and inspected prior to beginning construction; call 382294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, eta once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. Ca1148 hours before you dig for utility line locates I-800-424-SSSS Page 3 of 4 ;~ r~,aaatnozazs •=~ 6. The Building Department is unable to pass final inspection on your project until Public Worm requirements:have bem completed and inspected. For Public Works inspection call385-2294; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Bnilding Department's final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits e=pirc if no progress has been made within siz months, or if no inspections are done by the Building Depsrdnent within one year. Call for at least one inspection per year to keep your bu~7ding permit active. 9. Revisions require review and approval prior to malting changes in the field Contact the Building Department 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS. • Call 48 boon before you dig for utility line locates 1-800.424-5555 Page 4 of 4