CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION STTE
Call 385-2294 for Inspection
Permit Number: BLDOZ-123 Issued: 07/07/02 Parcel Number: 985201201
Job Address: 2206 Ebonv Street Zoning: Rl ll Type: V_N Occupancy: R-3
Total Occupant Load: 4 Nature of Work: Construct sinele-family residence
Owners: Robert Perrich Contractor: OED Builders LLC - OEDBUI*0431D1
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RE UIRED INSPECTIONS
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive OffMat to restrict sediment from leaving
the site
GROUNDWORK PLUMBING
Pressure Test
Pipe Joints Exposed J /~~
~// ~®Z / '//
`
Pipe Bedding "T
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
REQUIRED INSPECTIONS
APPROVED/DATE
r~aasrnoE.rxi'
•,!
w,
sLAs
Setbacks
Forms ~/ I~/~Z n„
d/J
/
I 1
Interior Footings (
mo
Reinforcement - #3 @ 30" o.c. each way @ slab
Insulation (R-S )
Engineered Holdowns
Anchor Bolts -per engineered shear wall schedule
LIFER y
~ ~
Porch/Deck Piers ~/i~ jQ7i
FLOORFRAMING -engineered BCI plan shall be on-site
at time of inspection
Joists
Engineered Holdow»s
Engineered Beams & Headers
Blocking
Shield under Posts
Positive Connections
Treated Wood to Concrete
PLUMBING:
Rough-In (D-V-T & Clean outs) ~ r I ~ /
~(
l~V ~/ W s Q
Z~Mj ~ f
Water Supply .
/
` ! v'~(t
q
/
Gas Supply -
f
Water Hammer Arrester @ clothes & dishwashers
Hose Bibs (backflow protection required)
Pipe Insulation (R-3)
Pressure Reduction Valve if > 80 psi
Water Heater
R-10 under if electric
Seismic Restraint -strap, tank @ 1/3 points
Pressure relief valve drain to exterior, terminate
6" -.24" above ground
ICAL
LPG Stove
use Fan @ F-2 bathroom
Kitchen/Bath/Laundry Fans
Environmental Air Exhaust ducting (w/ backdraft dampers),
~/~~~
insulation (R-4) and terminus (located 3' from openings)
`i
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Yage 2 of 4
j, .,
a' RE UIRED INSPECTIONS
Pmnit # BI.rJ02-123
APPROVED/DATE
FRAMING - SUDP shall be issued & on-site at time of
inspection
alts
Engineered Shear Walls
~~~
T~
Ceilings J
l.~Z
Posts, Beams & Headers
Roof
Blocking
Rafter Positive Connection
Roof Venting - eave and ridge verTts
Windows -escape
Windows -safety glazing
Windows Ufactor - .34 or better
NFRC window sticker must be on windows &
doors at inspection time
Fresh Air Intake (Window Ports)
DoorsU-Factor-various; see attached WATTSUN
Air Seal
Fire Blocking
Weather Resistive Barrier
INSULATION /
Slab (R=5) r~~/
~
l
Walls (R-19)
Ceiling (R-30 vault )
Vapor Barrier: paint
Baffles
DRY WALL NAILING _ /
r/
Walls /
/
U/
~/
Ceiling G
6
Enclosed Usable Space under Stairs
FINAL - No occupaxcy permitted prior to final plat
Approval for Phase I ,
(~~ ~s9.tJs~ g Pt~ ~/ Z ?~~v
Public Works Sign-OfI'
House Numbers - 5" minimum
Plumbing `
~Q/_ ~- - ID / ~ , //~
(% -_.I/~~/ `/1G.
MechanicallHeating
Vapor Barrier Paint Certificate ~ ~~
a c j
Insulation Certificate
Smoke Detectors
Final -Building
i Call 48 hours before you dig for utility line locates
1-500-424-5555
Page 3 of 4
i N.
Permit#BI.DO2.123.
p:
ENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor 8c Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspeMed prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept tree of dirt debris. Soils
eaposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior t2
scheduling the Building Denartment's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within sia months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4
.@7!0412002 22:28 97@5069060
fllof,~'
City of Port Townsend
Deparurretrt of Public Works
®~° Mr. Dave Petersen
Watertnaer atld Katz Building
PortTownsend,WA 98368
BOB PERRIQi / J_ PAGE 01
~i7 ~ l~~ U'y e~ h IZ~Ki ~ ~ i~ ~11"Y„ A11~'YXj C'~G
L
~~
"~
July 5, 2002
Subjeet: t?wttec Acknowledgement
Dear Mr, Petersen.
We acknowledge that the Certificate o£Occupancy for our new residence orlon Lot I,
Block 12, Pcttygroves tad Addition, in The City of Port Townsend, is contingenk upon
water, sewer ar«l acceptable surface access material for W and Ebony Streets, io and
through our property.
Verbal discussions today with Mr. Duke Rhoades indicate Public Works approval of
sewer, water and pavemem for the adjoining p%ject of Madrona LLC, to and through our
property, is anticipated in the time period before Deocmber 1, 2002. We are under
contract with QED Builders to construct our new residence within a time frame, stated as
a goal. This discussion is within our goal.
From the beginning of our ootitmunications and customer relationship with QED Builders
and representatives of Madrona LLC, the hallmark has been mutual trust and good faith.
Certainly while meeting your office's professional requvements, we appreciate the
support to issue our building permit as soon as possible.
Siztcerely,
Robert A. Perrich
2130 45t° Avenue Court
Greeley, CO 80634
970/~330-3412
Ken Nielse~~i~~j~~'L=fir
5729 Rotterdam Lane
San lase, CA 95tt8
408/723-1343
(Signed far K. Nielsen, with full advice, knowledge and consent, by R.A. Perrich}
CF: Mr. Duke Rhoades, QED Builders
_.
.:r