Loading...
HomeMy WebLinkAboutBLD02-122 Waterman & KatzBuildiDg 181 Quincy Street, Suite 301 Port TownSend. WA 98368 Ph"",,, (360) 379-3208 Pa>c (360) 385-7615 e CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Can 385-2294 for Inspection Permit Number:BLD02-122R-l Issued: 10/07/02 Parcel Number: 993 800 025 Job Address: 2599 Seaview Drive Zoning:.M Type: V-N Total Occupant Load: No chan!!e Occupancy: R-3 Nature of Work: Revision #1: make downstairs bedroom a den bv deletin!! the closet. and add a closet to the den to make a bedroom: add dry bar in livinl!' room: omit post and beam in I!'ara!!e and substitute 20" series 600 BCl's (iU 16" o.c.: increase deck from 8 to 10 feet on one side: add tub to powder room: omit hall closet and replace with half wall: cantilever entry and add two steDs inside: add Jandin!! and stairs to rear entry. Owner: Dobson Construction Inc. Contractor: Same as Owner - DBOSOCI012K7 GENERAL CONDmONS APPLY - SEE LAST PAGE -r 0~O. (<;${}e:lJ Sez f(L.-{J:. SEPARATE PERMITS REOUIRED: Electrical- Contact Labor & Industries@360-417-2702 -For other inspections. see ori2inaI permitBLD02-122. REOUffiED INSPECTIONS APPROVEDIDATE PLUMBING: See also original permit for inspection requirements , Rough-In (D-V-T & Clean outs) Water Supply Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi FRAMING: See also original permitfor inspection requirements DecklLanding Walls Headers & Beams Treated Wood to Concrete Windows - escape Windows U-factor - .75 or better NFRC window sticker must be on windows, skylights and doors at inspection time . Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 012 - - -- REOUIRED INSPECTIONS I ~~BUi1ding Perm8" BLD02-122R-1 APPROVEDIDATE I. ~AJ, C.ONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's rel!'istration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to be&inning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. AU elements of engineering including nailing, holdowns, sheathing, and alternate braced wall p8nels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass (mal inspection on your project until Public Works. requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is reauired. Public Works anDroval must be received Drior to schedulin!! the Buildin!! Denartment's final insnection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for atIeast one inspection per year to keep your building permit active. 9. Revisions require submittal and approval Drior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. . Can 48 houn before you dig for utility line locates 1-800-424-5555 Page 2 of2 -- -. - Waterman & KatzBuilding 181 Quincy Street,. Suite 301 Port Townsend. WA 98368 Phone: (360) 379.3208 Fax: (360) 385_7675 . CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD02-122 Issued: 07/05/02 Parcel Number: 993800025 Job Address: 2599 Seaview Drive Zoning: R-I Type: V-N Total Occupant Load: ~ Occupancy: R-3 Nature of Work: Construct Sinl!'le familv residence with I!8ral!e Owner: Dobson Construction Inc. Contractor: Same as Owner - DBOSOCI012K7 GENERAL CONDITIONS APPLY - SEE LAST PAGE SEPARATE PERMITS REOUIRED: Electrical- Contact Labor & Industries @ 360-417-2702 RE UIRED INSPECTIONS TEMP EROSION & SDM'T CONTROL See General Condition No. 2 Silt Fence as needed Drive OfT Mat to restrict sediment from leaving the site APPROVED/DATE GROUNDWORK PLUMBING Pressure Test Pipe Joints Exposed Pipe Bedding FOOTINGS Setbacks Footings Forms Reinforcement Interior Footings Porch Piers Dec Piers 7//2/<71-- f! {f! . Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 , Permit # BLD02-122 > RE UlRED INSPECTIONS FOUNDATION Stem Wall Forms Reinforcement Anchor Bolts & Washers Waterproofing APPROVEDIDATE 7/f-t/~ rp SLAB R-IO under Hydronic Tubing 7/3Dto FLOOR FRAMING Hydronic Heat Tubing Joists - BCI plan to be on-site at time of inspection Treated Wood to Concrete Positive Connections HY4~O IO!U!O 7.. ~ PLUMBING: Rough-In (D-V-T & Clean outs) Gas Supply Water Supply Water Hammer Arrestor @ clothes and dishwasher Hose Bibs (backflow protection required) Pi . -3) Pressure Reduction Water HeaterlBoiler Seismic Restraint - 2 places Pressure relief valve drain to ext .or, terminate 6" - 24" above ground 18" AF.F. [){))ufW~ Coj)fOtO! tructions shall be on-site at loft!j6 7/ CJ Call 48 hours before you dig for utility line locates 1-800.424-5555 Page 2 of 4 Pcnnit#BLD02.122 . RE UlRED INSPECTIONS MING: Street & Utility Development Permit on- site at time offraming inspection Walls Headers & Beams Treated Wood to Concrete Ceiling/Roof Truss Positive Connection - engineered truss plan on- site @ time of inspection Roof Venting - @ ridge & eave Windows - escape Windows U-factor - .75 or better NFRC window sticker must be on windows, skylights and doors at inspection time Skylights U-factor - .68 or better Air Seal Fresh Air Intake (Window Ports) Doors U-factor - .40 or better Fire Blocking Weather Resistive Barrier Ct(z 9(02-" - SULATION 'lab wi thermal break (R-IO) Floor (R- 19) Walls - (R-19) Ceiling - (R-30 ) Barnes Vapor Barrier: paint cJ~ ~ -/fA I c(?;{}p2-/!f (!~ / r1jo~ ()/ DRY WALL NAILING Walls Ceiling Interior Braced Wall Panels GarageIHouse Separation If1(Ob r!f . Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 . RE UIRED INSPECTIONS Permit"BLD02-122 APPROVED/DATE LPG 1;(2 7jDl.-- i . FINAL Public Works Sign-Off LPG House Numbers - 5"minimum Plumbing Mechanical/Heating Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors Final- Building /, Z-f/tJ3 GENERAl, C.ONDITIONS 1. Contractors workinl: on this project are required to have a Labor & Industries contractor's re!!istration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panelS. (ABWP) require-inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum oftwentv-four hours notice is reauired. Public Works aooroval must be received orior to schedulin!!' the Build;n!!' Deoartment's final insoection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval orior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4of4 .