Loading...
HomeMy WebLinkAboutBLD02-119 . . . w....... '" Klitz. BuUdInc J.J__........l PM T......... WA 98368 -'360-379-3208 _361-'85-'67. CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Can 385-2294 for Inspection Permit Number: BLD02-119 Parcel Number: 999 100 160 Issued: 07/02/02 Job Address: 2073 Elizabeth Place Zoning: R-II Type: V-N Occupancy: R-3 Total Occupant Load:~ Nature of Work: Set new manufactured home: add deck. Owners: Edward and Laurel Abel Contractor: Kozeliskv's Home Service W AINS#062 "'*"'*InstaJler: See Attached InstaJler Tal!"'*** GENERAL CONDITIONS APPLY - SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical- Contact Labor & Industries @ 360-417-2702 NOTE: Set-up manual shall be on-site at time of inspection. REOUIRED INSPECTIONS APPROVEDIDATE TEMP EROSION & SEDIMENT CONTROL See general condition #2 Silt Fence as needed Drive Off Mat to prevent sediment from leaving the site FOOTINGS/SLAB '7jtI/O~ f( Setbacks Forms Reinforcement Footings - minimum 4" per installation manual. FLOOR FRAMING (prior to skirting) 7jl/o/ OJ- Lit! Anchors Steel Support Piers - Load-stamped and installed per manufacturer's installation manual; clearance of 18" min. I from lowest point of 1-beam and the ground or footing for min. of 75% of area under home will" min. elsewhere unless installation manual specifies; otherwise area around home graded to provide runoff away from home. Can 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of3 RE RED INSPECfIONS PLUMBING: Water Supply - Main shut-oflvalve (port or ball valve) installed in water supply piping prior to COIJIttIdion to . home, min. %" diameter, same as supply pipe Pressure Reduction Valve if> 80 psi Hose Bibs (backflow protection required) Pipe Insulation - Outside & in crawl space Pressure Test -100 p.s.i.jor 15 minutes Pressure relief valve drain - to exterior of skirting, exhaust downward between 6" and 24" above ground ~~~p~-~~dmm~'~rfoot P_IIIILD02-I1' APPROVEDIDATE . 12JQ{Ol-Gp MECHANICAL (!fJ Ducts & Duct Insulation Dryer Exhaust - vented to outside. &tension into crawl 1/ V tt{ OU , .space requires venting through skirting with no dips; follow dryer manufacturer's instructions; total combined length of dueling not to exceed 14' wI1-9r1 elbows . FRAMING: Deck - Pressure-treated or of natural resistance to decay. VAPOR BARRIER 6 mil black poly ground cover (not required where area under home is concrete slab floor with a minimum thickness of 3-* inches) FINAL Public Works Sign-Off Electrical (L & I) Sign-Off House Number - minimum 5" numbers Plumbing Mechanical Fina1- Building No holes or gaps greater than ~" allowed in skirting. Crawl space ventilation per installation manual @ 1/150 (14 required), located clase to corners, on at least two opposing sides for cross ventilation. Crawl space access must provide access to all areas under home, minimum 18" x 24", covered with vinyl, pressure treated wood or metal. II I Oft (07/ Cf . Call 48 bopn before )'ou dig for utility line locates 1-800-424-5555 Page20f3 - . . . PennIt#BLDOZ-119 GENERAL CONDmONS 1. Contractors working on this project are required to have a Labor & Industries contractor's rel!istration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdoWDs, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Can 48 hours before you dig for ntility line locates 1-800-424-5555 Page 3 ofl .. . .