HomeMy WebLinkAboutBLD02-118 WatenDIIn &: Katz Building 181 Quincy Street,. Suite 301 Port Townsend, WA98368 Pbooe: (360) 379-3208 Fax; (360) 38:5-1675 . e CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD02-118 Issued: 07/07/02 Parcel Number: Treehouse PUD. Lot 1. Unit 7 Job Address: 1503 "W" Street Zoning: Treehouse PUD Type: V-N Occupancy: R-3 Total Occupant Load: .1 Nature of Work: Construct sinl!le-familv residence Owners: Madrona Villal!e LLC Contractor: OED Builders LLC - OEDBUI"0431Dl GENERAL CONDITIONS APPLY - SEE LAST PAGE . SEPARATE PERMITS REOUlRED: Electrical - <;:ontact Labor & Industries @ 360-417-2702 Any work with equipment within the 10' buffer adjacent to San Juan Estates requires prior written . approval from BCD Director. REOUIRED INSPECTIONS APPROVEDIDATE TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site GROUNDWORK PLUMBING Pressure Test Pipe Joints Exposed '7// z,/ () ~ (jJ Pipe Bedding . CaD 48 boun before you dig for utility line locates 1-800-424-5555 Page 1 of 4 RE UIRED INSPECTIONS SLAB Setbacks - see note at top of page re: buffer Forms Interior Footings Reinforcement - #3 @24" o.c. each way@sIab Insulation ( R-5 ) Engineered Holdowns Anchor Bolts - per engineered shear wall schedule UFER PorchIDeck Piers FLOOR FRAMING - engineered BCI plansha/l be on-site at time of inspection Joists Engineered Holdowns Engineered Beams & Headers Blocking Shield under Posts Positive Connections Treated Wood to Concrete PLUMBING: Rough-In (D-V-T & Clean outs) Water Supply Gas Supply Water Hammer Arrester @ clothes & dishwashers Hose Bibs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi Water Heater R-I0 under if electric Seismic Restraint - strap tank@ 1/3 points Pressure relief valve drain to exterior, terminate 6" - 24" above ground . NICAL o e ouse Fan @ F-2 bathroom KitchenlBathlLaundry Fans Environmental Air Exhaust ducting (wI backdraft dampers), insulation (R-4) and terminus (located 3' from openings) Pamit #BLD02-1 J8 f- ~ APPROVEDIDATE 7// r{07-- peuL S~ 7(2cf/oL ,.-- Pt-W ~W~ {o/tfdl I O{rr( (J2"et . Call 48 bours before you dig for utility Iioe locates 1-800-424-5555 Page 2 of4 Permit: It BlD02-118 . RE UIRED INSPECTIONS FRAMING - SUDP shall be issued & on-site at time of . inspection Walls Engineered Shear Walls Ceilings Posts, Beams & Headers Roof Blocking Rafter Positive Connection Roof V enting - eave and ridge vents Windows - escape Windows - safety glazing Windows U factor - .34 or better NFRC window sticker must be on windows & doors at inspection time Fresh Air Intake (Window Ports) Doors U-Factor - various; see attached W ATTSUN Air Seal Fire Blocking Weather Resistive Barrier APPROVEDIDATE UI?/V INSULATION Slab ( R-5 ) ails (R-19) Ceiling (R-30vaultIR-38 attic) Vapor Barrier: paint Baffles DRY WALL NAILING Walls Ceiling Enclosed Usable Space under Stairs It(JtOl/rp FINAL - No occupancy permitted prior to final plat Approval for Phase I Public Works Sign-Off Parking - J space required Landscaping - John McDonagh House Numbers - 5" minimum Plumbing MechanicallHeating Vapor Barrier Paint Certificate Insulation Certificate Smoke Detectors Final - Building P a. sku{ 2>/ C/O J yu- c 1:- pe- Co~ r;:~ f~~ f'ClSs.eal :d 2-f /0'3 re- Rt,b G- vav UJvvvrJer - g~ M f'cts0. Call 48 boun before you dig for utility line locates 1-800-424-5555 Page 3 of 4 PmmitIlBLlJ02..JIS . ~E1i~JW.,..CQml~ . 1. Contracton workin: on this project are required to have a Labor & Industries contractor's rel!istration number and a City business Hcense. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to be&inning construction; call 385-2294. Measures shall include installation of silt fencin: and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed durin: construction shall be temporarily stabilized with mulching, plastic sheeting, ete. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineerin: including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent sball review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Buildin: Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For PubHc Works inspection call 385-2294. A .=-- minimum of twenty-four houn notice is required. Public Works aonroval must be received nrior to schedulinl! the Buildint! Denartment's final insnection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non- residential project. \ 8. All building permits expire if no progress has been made within six mouths, or if no inspections are done by the Building Department within .one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval nrior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST TmS PERMIT ON-SITE WITH THE APPROVED PLANS. CaH48 boun before you dig for utility line locates 1-800-424-5555 Page .. of 4 ~