HomeMy WebLinkAboutBLD02-115
.
.
,
Waterman & Katz Building
181 Quin~ Street, Suite 301
Port Townsend. WA 98368
Phone: (360) 379~3208 Fax: (360)38S~7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD02-115 Issued: 06/28/02 Parcel Number: 957901104 & 105
Job Address: 2809 Hendricks Street Zoning: R-I1 Type: V-N Total Occupant Load: .1
Occupancy: R-3
Nature of Work: Construct Sinele familv residence with earaee
Owner: Paul & Barb Haeer
Contractor: Marbri Construction - MARBRI*ll1Nl
GENERAL CONDITIONS APPLY - SEE LAST PAGE
. SEPARATE PERMITS REOUIRED:
Electrical- Contact Labor & Industries @ 360-417-2702
APPROVED/DATE
RE UIRED INSPECTIONS
TEMP EROSION & SDM'T CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS
Setbacks
Footings
Forms
Reinforcement
Interior Footings
Porch Piers
Dec . ers
!1{A/
(/
7/50/ t1l-(fJ
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of4
RE UlRED INSPECTIONS
FOUNDATION
Stem Wall
Forms
Reinforcement
Anchor Bolts & Washers
Vents - J 7 required
Crawl Access
Alternate Braced Wall Panel Holdowns
FLOOR FRAMING
Foundation Cripple Wall
Hydronic Heat Tubing
Joists - BCI plan to be on-site at time of inspection
Treated Wood to Concrete
Positive Connections
PLUMBING:
Rough-In (D-V-T & Clean outs)
Gas Supply
Water Supply
Water Hammer Arrestor @ clothes and dishwasher
Hose Bibs (backflow protection required)
Pipe Insulation (R-3)
Pressure Reduction Valve if> 80 psi
Water HeaterlBoiler
Seismic Restraint - 2 places
Pressure relief valve drain to exterior, terminate
6" - 24" above ground
18" A. F. F.
instructions shall be on-site at
Who e ouse an - @ laundry
Source Specific Fans
Environmental Air Exhaust ducting (wI backdraft
dampers), insulation (R-4) and terminus (located 3' from
openings)
Permit flBLD02.1 IS
APPROVEDIDATE
.-
..
1/ 0( eJV~
H5AI -ruM>- lo(3{ OJ-.Cf
pwv ~IJJS [O{t~[~ef
/or/lH~ ~
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
~
RE UlRED INSPECTIONS
FRAMING: Street & Utility Development Permit on-
site at time offraming inspection
Walls
Alternate Braced Wall Panels
Headers & Beams
Treated Wood to Concrete
CeilingIRoof
Truss Positive Connection - engineered truss plan on-
site@ time of inspection
Roof Venting - @soffit
Windows - escape
Windows V-factor - .75 or better
NFRC window sticker must be on windows, skylights
and doors at inspection time
Skylights V-factor - .68 or better
Air Seal
Fresh Air Intake (Window Ports)
Doors V-factor - .40 or better
Fire Blocking
Weather Resistive Barrier
CHIMNEY
'ermination
INSULATION
Floor (R- 19 )
Walls - (R-19)
Ceiling - (R-30 )
Barnes
Vapor Barrier: paint
6 mil black poly in crawl space
DRY WALL NAILING
Walls
Ceiling
Inter Braced Wall Panels
GarageIHouse Separation
-
Permit # BLD02.llS
APPROVEDIDA TE
lqi(oz!!
/ojJ~t-,J/
/rfJ-f(oZ,@
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
Permil # BLDQ2.1 15
.
RE UIREDINSPECTIONS
APPROVED/DA TE
FINAL
Public Works Sign-Off
LPG
House Numbers - 5"minimum
Plumbing
Mechanical/Heating
Insulation Certificate
Vapor Barrier Paint Certificate
Smoke Detectors
Final - Building
1
e
oLe.
--t~
411~1~
GENERAl, CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's re2istration
number and a City business license. Failure to provide proof ofthis documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels .-
(ABWP) require inspection prior to cover.
4. Owner or owner's agenhhall review and oversee correction of any and all deficiencies noted by required
inspections. .
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twenty-four hours notice is required. -Public Works aooroval must be received prior to
schedulinl! the Buildinl! Deoartment's final insoection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 40f 4
~
- -