Loading...
HomeMy WebLinkAboutBLD02-115 . . , Waterman & Katz Building 181 Quin~ Street, Suite 301 Port Townsend. WA 98368 Phone: (360) 379~3208 Fax: (360)38S~7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD02-115 Issued: 06/28/02 Parcel Number: 957901104 & 105 Job Address: 2809 Hendricks Street Zoning: R-I1 Type: V-N Total Occupant Load: .1 Occupancy: R-3 Nature of Work: Construct Sinele familv residence with earaee Owner: Paul & Barb Haeer Contractor: Marbri Construction - MARBRI*ll1Nl GENERAL CONDITIONS APPLY - SEE LAST PAGE . SEPARATE PERMITS REOUIRED: Electrical- Contact Labor & Industries @ 360-417-2702 APPROVED/DATE RE UIRED INSPECTIONS TEMP EROSION & SDM'T CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS Setbacks Footings Forms Reinforcement Interior Footings Porch Piers Dec . ers !1{A/ (/ 7/50/ t1l-(fJ Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of4 RE UlRED INSPECTIONS FOUNDATION Stem Wall Forms Reinforcement Anchor Bolts & Washers Vents - J 7 required Crawl Access Alternate Braced Wall Panel Holdowns FLOOR FRAMING Foundation Cripple Wall Hydronic Heat Tubing Joists - BCI plan to be on-site at time of inspection Treated Wood to Concrete Positive Connections PLUMBING: Rough-In (D-V-T & Clean outs) Gas Supply Water Supply Water Hammer Arrestor @ clothes and dishwasher Hose Bibs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi Water HeaterlBoiler Seismic Restraint - 2 places Pressure relief valve drain to exterior, terminate 6" - 24" above ground 18" A. F. F. instructions shall be on-site at Who e ouse an - @ laundry Source Specific Fans Environmental Air Exhaust ducting (wI backdraft dampers), insulation (R-4) and terminus (located 3' from openings) Permit flBLD02.1 IS APPROVEDIDATE .- .. 1/ 0( eJV~ H5AI -ruM>- lo(3{ OJ-.Cf pwv ~IJJS [O{t~[~ef /or/lH~ ~ Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 ~ RE UlRED INSPECTIONS FRAMING: Street & Utility Development Permit on- site at time offraming inspection Walls Alternate Braced Wall Panels Headers & Beams Treated Wood to Concrete CeilingIRoof Truss Positive Connection - engineered truss plan on- site@ time of inspection Roof Venting - @soffit Windows - escape Windows V-factor - .75 or better NFRC window sticker must be on windows, skylights and doors at inspection time Skylights V-factor - .68 or better Air Seal Fresh Air Intake (Window Ports) Doors V-factor - .40 or better Fire Blocking Weather Resistive Barrier CHIMNEY 'ermination INSULATION Floor (R- 19 ) Walls - (R-19) Ceiling - (R-30 ) Barnes Vapor Barrier: paint 6 mil black poly in crawl space DRY WALL NAILING Walls Ceiling Inter Braced Wall Panels GarageIHouse Separation - Permit # BLD02.llS APPROVEDIDA TE lqi(oz!! /ojJ~t-,J/ /rfJ-f(oZ,@ Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 Permil # BLDQ2.1 15 . RE UIREDINSPECTIONS APPROVED/DA TE FINAL Public Works Sign-Off LPG House Numbers - 5"minimum Plumbing Mechanical/Heating Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors Final - Building 1 e oLe. --t~ 411~1~ GENERAl, CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's re2istration number and a City business license. Failure to provide proof ofthis documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels .- (ABWP) require inspection prior to cover. 4. Owner or owner's agenhhall review and oversee correction of any and all deficiencies noted by required inspections. . 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. -Public Works aooroval must be received prior to schedulinl! the Buildinl! Deoartment's final insoection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 40f 4 ~ - -