Loading...
HomeMy WebLinkAboutBLD02-094 W_&ICaIzBuilding 1'1 QuinGyStreet. Suite 301 PortT_ WA98368 Phone, (360) 3?9-3208 F.., (360) 385-7675 . CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE CaD 385-2294 for Inspection Permit Number: BLD02-094 Issued: 05/09/02 Parcel Number: 989705401 Job Address: Memorial Field. Washinl!tonlOuincv Streets Zoning: P/OS Occupancy Load: 660 Nature of Work: Temporary Tent used bv Centrum in the past for special events 10.000 souare feet for buffet dinner Mav 9. 2002 Property Owner: Jefferson County Business: Port Townsend Main Street NOTE: Refer to attached Fire Department memo dated 05/09/02 for conditions of approval GENERAL CONDmONS APPLY - SEE LAST PAGE ELECTRICAL - a separate electrical permit is required for any electrical work. Contact Labor and Industries at (360) 417-2700 if needed. RE UIRED INSPECTIONS AL - contact Tom Aumock, Pori Townsend Fire Department, @385-2626, for inspection and approval Fire Extinguishers Exiting/Signage/Dlurnination "No Smoking" Signs Setbacks - 20 foot setback to LPG Barbeque Flame Resistant Materials Occupancy Load Posted: 660 Final- Fire Department APPROVEDIDATE GENERAL CONDmONS 1. Contracton working on this projeet are required to have a Labor & Industries contractor's relristntion number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. . CaD 48 boun before you dig for utility line locates 1-800..424-5555 Page 1 of2 _'1Il.D02-<l94 2. Temporary erosion and sediment control (TESe) measures shall be installed OR-site and inspected prior . to beginninll CODStruction; call 385-2294. Measures shall include installation of silt l'entinll and graveled .. . construction entrance (see attached details). Adjacent rights-of-way sball be kept free of dirt debris. Soils exposed durinll constructioa shall be temporarily stabilized with mulcbinll, plastic sheetina, etc. Soils shall be permanently stabilized with seedinll, plantinp, sodding, ete. once cODStruction is complete. Applicant is responsible for protection of adjacent properties. 3. AD elements of en&ineerin& includinll nailinll, holdoWDs, sheatbinll, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's a&ent shall review and ovenee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Buildinll Department is UiIlIbIe to pass final inspection oa your project until Public Works requirements have been CODIpleted and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four boun notice is reauired. Public Works annroval must be received nrior to schedulin2 the Buildin2 Denartment's final insnection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non- reaidential project. 8. AD building permits expire if no progress bas been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your .~ buildinll permit active. 9. Revisions require review and approval R!im: to making changes in the field. Contact the Buildinll Department at 379-5086 prior to making chanlles to the approved plans. 10. POST THIS PERMIT ON-SITE W1m THE APPROVED PLANS. CaD 48 boun before you dig for utility line locates 1-800..424-5555 Page 2 of2 .