HomeMy WebLinkAboutBLD02-089
-
.
--
city oCPOIt T"",*,",
W........ & Katz Buildiog
181 Quincy Stn:eI, POItTownsend, WA98368
(360) 379-3208 Fax (360) 38S- 767S
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 38S-2294 for Inspection
Permit Number: BLD02-089
Issued: 06/19/02
Parcel Number: 988802105
Job Address: 1058 Quincv Street
Zoning: R-I1 Type: V-N Occupancy: R-3
Total Occupant Load: ~ Nature of Work: Residential Remodel of Kitchen
Owner: Tom Thurston Contractor: Paradise Bav Construction - PARABD141KW
Bill Irwin -731-4222
GENERALCONDflaONSAPPLY-SEELASTPAGE
SEPARATE PERMITS REOUIRED:
Electrical- Contact Labor & Industries @ 360-417-2702
REOUlRED INSPECTIONS APPROVEDIDATE
DEMOLflaON
Materials from demolition shall be deposited in areas off-
site meeting all requirements of state and local law
PLUMBING 1121D~
Rough-In (D-V-T & Clean Outs)
Water Supply
Gas Supply (if applicable)
Water Hammer Arrestor dishwasher
Pipe Insulation (R-3)
Pressure Reduction Valve if> 80 psi
MECHANICAL
Kitchen Fan
Dryer Ducting
Environmental Air Exhaust ducting (with backdraft
damper), insulation (R-4) and terminus (located 3'
from openings)
Call 48 bours before you dig for utility line locates
1-800-424-5555
Page 1 of3
,~
Bui1ding Penn~ #BLD02~89
,
,
REOUIRED INSPECTIONS APPROVEDIDA TE
FRAMING:
Air Seal
Fire Blocking
DRY WALL NAILING
Walls
Ceiling
FINAL
House Numbers - check for 5" numbers
Plumbing
Mechanical
Smoke Detectors throughout existing construction: one in
each sleeping room and in each area/hallway leading to l~~(()~ c(
sleeping rooms with a minimum of one on each floor
Final - Building
tt
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's .
rel!istration number and a City business license. Failure to provide proof of this documentation
prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294. Measures shall include installation of
silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way
shall be kept free of dirt debris. Soils exposed during construction shall be temporarily
stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with
seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for
protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall
panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294.
A minimum of twenty-four hours notice is renuired. Public Works aooroval must be received
orior to schedulinl! the Buildinl! Deoartment's final insoection.
Can 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of3
"
......--......-.-
__ -; _~_.... -0.- ~-"'__
-
7.
.
j
. 8.
Building Permit #BLOO2..{l89
Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a
non-residential project.
All building permits expire if no progress has been made within six months, or if no inspections
are done by the Building Department within one year. Call for at least one inspection per year
to keep your building permit active.
9. Revisions require review and approval by the Building Department. Contact them at 379-5086
prior to making changes in the field.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
.
.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 4 of3
-
.
-
~
_.."""~-;'-:"" :...",~....___ .~~__'.<'C
..
-.
.
.
.
._-- ----