HomeMy WebLinkAboutBLD02-088
.
.
.
Waterman & Katz
181 Quincy Street Suite 301
Port Townsend, W A 98368
Phone (360) 379.3208 Fax (360) 385~1675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD02-088
Parcel Number: 958502301
Issued: 6/14/02
Job Address: 2333 San Juan Avenue
Zoning: R-III Type: V-N
Occupancy: A-3
Total Occupant Load: No Chan!!e
Nature of Work: Remove interior. non-load bearin!! walls:
install new doors: floor over existin!! ODen SDace. etc.
Owner: OuimDer Unitarian Universalist FellowshiD
Contractor: Ravenswood CarDentrv
GENERAL CONDITIONS APPLY - SEE LAST PAGE
SEPARATE ELECTRICAL PERMIT REOUIRED: Contact Labor & Industries@ 360-417-2702
RE UIRED INSPECTIONS
DEMOLITION
Materials from demolition shall be disposed of in the
Jefferson County Landfill or other approved areas off-site in
accordance with all state and local laws
APPROVEDIDA TE
FRAMING - Barrier Free Design Required
Walls
Floor Joists
Window - Safety Glazing
Skylights - .58 U-factor or better
Thresholds - 1/," maximum
Doors - lever hardware
Approaches
fzflO&Of
DRYWALL
Walls
FINAL
Fire Department Final Approval
Final Electrical (contact L & I)
Building Numbers posted (min. 5")
Barrier Free Design
Building - Final
Call 48 hours before you dig utility line locates: 1-800-424-5555
Page I of2
Permit # BLD02-088
..--.
.
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's rel!istration
number and a City business license. Failure to provide proof ohhis documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works .
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
minimum of twenty-four hours notice is reauired. Public Works annroval must be received nrior to
schedulinl! the Buildinl! Denartment's final insnection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST TIllS PERMIT ON-SITE WITH THE APPROVED PLANS.
.
Ca1148 hours before you dig utility line locates: 1-800-424-5555
Page 2 of2