HomeMy WebLinkAboutBLD02-080w.tero.. & xa aueN.g
lai QoMn'stree+. saasNl
r.n rya, we 9a33s
Plana: 360.179J203 ru 36~J83-7673
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Cs11385-2294 for Inspection
Permk Number: BLDO2-O8O Issued:05/31/02 Parcel Number. 947-600-103
Job Address: 4208 Wilson Street Zoning: R-I Type: V_N Occupancy: R-3/(T-1
Total Occupant Load: 512 Nature of Work: New Sine le-family Dwelline with attached earaee
Owner: Edwin Underwood
RF.nTTiRF.TI iNSPE('TinNS
GENERAL CONDITIONS APPLY - SEE LAST PAGE
SEPARATE PERMTTS REOUIItED:
Electrical -Contact Labor & Industries Q 360-417-2702
NOTE: Any removal of significant trees 10 feet beyond the eacavsted footings area and driveway shall require
submittal and review of a Tree Removal permit.
Contractoe Hammer Head Custom Homes. Inc.
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition #2
Silt Fence as needed
Drive Off Mat per attached details
FOOTINGS
Setbacks
~ ! C~Tr
~ ~/~~!(
Footings
Forms
Reinforcement
Interior Footings
Porch Piers
UFER
FOUNDATION
Stem Wall
Forms
Reinforcemern
Anchor Bolts w/ 2" x 2" x 3/16" square washers
Vents -16 required
Crawl Access
Beam Pockets
Alternate braced wall anal ABWP hold downs
Ca1148 hours before you dig for utility line locates
1-800.424-5555
Page 1 of 4
~~
REQUIRED INSPECTIONS APPROVEDlDATE
SLAB -Non-Structural (a3 garage
ABWP hold down hardware
FLOOR FRAMING
Engineered BCI plan to be on~site @ time of ,^' ~~~
1~ z
inspection
Girders
Joists
Blocking
Shield under Posts
Positive Connection
Girder to Concrete
Beam Pockets
Treated Wood to Concrete
Anchor Bohs & Washers
PLUMBING:
Rough-In (D-V-T & Clean Outs) y ~+~~ M
Water Supply ~
/~6 `
f/
Water Hammer Arrestor Q clothes & J
dishwasher
Hose Bibs (backflow protection. required)
Pipe Insulation - R-3
Pressure Reduction Valve if> 80 psi
Water Heater
R-10 under
Seismic Restraint - 2 places
18" A.F.F.
Pressure relief valve drain to exterior
MECHANICAL
Electric Forced Air
Mamrfacturer's I»stallation Instructions to be
omsite (t~ brae of inspection ~
Duda & Dud Insulation - Supply/fresh air ~ ~~
/
7 ~. ~/ !/
ducts in coy i ' red ee: R-4; heating ducts in
boned space:
ouse 'lion
HVAC Integral Fresh Air
7" Smooth Dud minimum
Terminal Element - 8"
Clock timer on furnace fan
Other than motorized damper req ' letter
of certification for flow rates
eat a e
C oars before you dig fer utility line locates
1-800.424-5555
Psge 2 of 4
•
Build'mg Peamit #BLD02-080
•
1_J
RF.f1TTTRF.T) iN.CPF.CTTONS APPROVED/DATE
MECHANICAL continued
Source SpeciSc Fans
Environmental Air Exhaust ducting (with
backdraft damper), insulation (R-4) and terminus
(located 3' from opening)
FRAMING ~ j
Alternate Braced Wall Panels ~~~i~j/ ~~`/
Roof-Engineered truss plan to be on-site at /// f
time of inspection
Attic Venting -ridge & eave
Ceilings
Posts, beams & headers
Windows - egess
Windows -safety glazing
Windows Ufactor - .40 or better
NFRC window sucker must be on
~ndaws, skylights & doors at inspection time
Air Seal
Skylights - .58 or better
Doors Ufactor - .20 or better
Truss Positive Connection
Fire Blocking
Weather Resistive Barrier
INSULATION ~~
Floor (R-30) ,
~GGCJ~'~ ~~
Wall (R-19 )
Ceiling (R-38 )
Ba®es
Vapor Barrier: paint
Crawl space - 6 mil black poly
DRY WALL NAII.ING
Watls ~, / /~
~~~z / f/
Ceiling ((
Garage/House Occupancy Separation
Interior Braced Wall Panels
Call 48 hours before you dig for utility line locates
I-800.424-5555
Page 3 of 4
a~aa~r~asimz-oso
Public Works Sign-Off
House Number - 5" members
Plumbing
Mechanical -Ventilation Certification for
Integated System
Insulation Certificate
V. B. Paint Certificate
Smoke Detectors
Final -Building
g/ ~ ~~
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
reaistrstion number and a City business license. Fa~nre to provide proof of this documentation prior to
work may result in job shut down whde this is accomplished
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt
and debris. Soils exposed during eonatruction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently atab~7ized with seeding, Plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, 6oldowns, shesthmg, and alternate braced wall panel
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and aU deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department le unable to pass final inspection on your project until Public Works
requirement have been completed and inspected. For Public Works inspection call 385-2294; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits ezpire if no progress has been made within siz months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your bii~ding permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Bm7dmg
Department at 379-5086 urior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-8Q0-424-5555