HomeMy WebLinkAboutBLD02-079Wabrmm R Ktlz Building
181 Quinry SVxI, Seib 301
Pon Townsend, WA 98368
PMne: (360)379-3208 Fu: (360)383-7673
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDO2-O79 Issued: OS-22-02 Parcel Number: 001-023-016
Job Address: 800 Fir Street Zoning: RR=II Type: VV=N Occupancy: R-3/U-1
Total Occupant Load:2/2 Nature of Work: Detached Garase with upstairs ADU
Owner: Geor¢e P. Hill Contractor: TBD
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RE UIRED INSPECTIONS
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site -can use existing graveled driveway
FOOTINGS
Setbacks
~/Z~~P~
Footings
Forms
Reinforcement
ck Piers
~ ~ /~-~~
~'
FOUNDATION STEM WALL
Forms
Reinforcement
~~~~~ ~ ~~
Anchor Bolts
Holdown Hardware
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
Permit M HLpOS-0?9
REQUIRED INSPECTIONS APPROVED/DATE
FLOOR FRAMING
Joists - E»gineered BCI plan on-site at time of inspection
Blocking
Positive Connections
Treated Wood to Concrete
Anchor Bolts w/ 2" x 2"x 3/16" washers
Floor-to-Floor Holdowns w/ 5/8" threaded rod -per
engineering
PLUMBING:
Rough-In (D-V-T & Clean outs) p ~
CJ Y~C~9~,-S` q,~ G~1, Vin `
Water Supply ~
~J
~ ~ 9
~
~
~ ~'
Water Hammer Arrestor at dishwasher ~
j
j ~
~
Hose Bibs (backflow protection required)
Pipe Insulation (minimum R-3)
Pressure Reduction Valve if > 80 psi
Water Heater
Seismic Restraint - 2 places
R-10 under if electric
18" A. F. F.
Pressure relief valve drain to exterior, terminate
6" - 24" above ground
MECHAZITICAL
Whole House Fan -Bathroom
Kitchen Fan
Environmental Air Exhaust ducting (with backdraft dampers),
insulation (R-4) and termination (3' from openings into
building) .
FRAMING
Walls
Engineered Shear Walls
Ceilings
Roof -engineered truss plan to be on-site at time of
inspection
Truss Positive Connection
Blocking
Attic Venting - @ ridge & soffit
Windows -escape
Window safety glazing
Windows Ufactor - .36 or better
NFRC window sticker must be on windows and doors
at inspection time
Ca1148 hours before you dig for utility line locates
i-800-424-5555
Page 2 of 4
J
PamitMBLD02A79
RE UIRED INSPECTIONS APPROVED/DATE
FRAMING (continued)
Air Seal
Fresh Air Intake (Wall Ports)
Fire Blocking
Weather Resistive Barrier
INSULATION
Floor (R-30 required )
Walls (R-21)
Il/ )~i/~D7/
a
Ceiling (R=38) 111
Baffles
Vapor Barrier: Paint
DRY WALL NAILING
walls ~~/j9/BZ
Ceiling ( ( ;
Garage/House Occupancy Separation
FINAL
House Numbers-5"
Z~( ~~p3
~QS~
Plumbing
Mechanical/Heating 1~P~ ~ ~
9 - (~~~
Insulation Certificate
Smoke Detectors
Vapor Barrier Paint Certificate
Landing, Stairs, Handrails, Guardrails
Final -Building
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible far protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
Permit M BLD02-079
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Bu7ding Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspeMed. For Public Works inspection ca11385-2294. A
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval rior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
Ca1148 .hours before yon dig for utility line locates
1-800.424-5555
Page 4 of 4