CONSTRUCTION PERNIIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca0 385-2294 for Ins lion
Permit Number: I3LDU2-076 Issued: 06/07/02 Parcel Number: 947 600109
Job Address: 4153 Gise Street Zoning: R-I Type: V=N Occupancy: R-3/U-1
Total Occupant Load: 612 Nature of Work: Construct sinele-fsmiW residence with attached ¢ara2e
Owner: Johnathan Rvweck Contractor. Vern Garrison Construction
VEItNOGC062Q8
GENERAL CONDITIONS APPLY -SEE LAST PAGE -r L , ~ , ~ SS v ~'D 1~(D// 3/OL
SEPARATE PERMITS REOUIItED: ~"P7i~~ Z~/3/DL `^I
Electrical -Contact Labor & Industries (a3 360-417-2702
***ALL ELEMENTS OFENGINEERING REQUIRE INSPECTIONPRIOR TO COVER***
-~
RF.OTITRED TNSPE("TTONS
APPROVED/DATE
TEMP EROSION & SED]MENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive OffMat to restrict sediment from leaving
the site
FOOTINGS , /,/ ~~
'l
C
Setbacks ~
Footings
Forms
Porch/Deck Piers
Reinforcement
Footings
IJFE
.
~ ,
Call 48 hours before you dig for ut0ity line locates
' 1-800.424-5555
Page 1 of 4
re~maRSioozma
REQUIRED INSPECTIONS APPROVF.D/nATF.
FOUNDATION
Stem Wall
Forms /~~1 /~
~~ 2~ ® ~7 ,1 1~ /
Reinforcement ~1 ~ ~%f ~
Anchor Bolts - ~
Beam Pockets
Foundation Vents (9)
Crawl Access
Engineered Hold downs
Waterproofing
FLOOR FRAMING - BCI floor fro»ung plan to
be on-site at tine of inspection
~/j~ /
Joists ~
/ "~~'
l
Girder 1
L
Blocking
Shield under Posts
Positive Connections
Girder-to-concrete
Beam Pockets
Treated Wood to Concrete
Anchor Bolts w/ 2" x 2" x 3/16" washers
PLUMBING:
Rough-In (D-V-T & Clean outs) ~ ~ / ~~~ /~ /~
~ ~~'
Water Supply Zl
Gas Supply ''
Water Hammer Arrester (tD clothes & dishwashers
Hose Bibs (backfiow protection required)
Pipe Insulation (R-3)
Pressure Reduction Valve if> 80 psi
Water Heater
R-10 under if electric
Seismic Restraint -strap tank Q 1/3 points
Pressure relief valve drain to exterior, terminate
6" - 24" above ground
MECHANICAL - mamrfactrver's installation
11 be on-site of time of inspection
Propane Boiler _
o e bathroom
Source Specific Fans
Environmentai Arr Exhaust dulling (w/ backdraft dampers), ^/
n /J
insulation (R-4) and terminus (located 3' from opening) ~~
l~
J Q ~ /
~//
l
~
Ca1148 hours before you dig for utility line bcates
1-800.424-5555
Page Z of 4
`J
Pamir # BI.D03-076
REOUiRED INSPECTIONS
APPROVED/DATE
FRAMING
Walls ;~~ ~~~~
Engineered Shear Walls
Ceilings
Posts, Beams & Headers
Roof- engineered truss plan on-site at time of inspection
Truss Positive Connection
Roof Venting - save and continuous ridge vents
Windows -escape
windows -safety glazing
Windows Ufactor - .65 or better
NFRC window sticker must be on windows &
doors at inspection time
Fresh Air Intake Window Ports)
Doors U-Factor - .40 or better
Skylights - .40 or better
Air Seal
Fire Blocking
Weather Resistive Barrier
INSULATION
Slab (R=10 with thermal break ~a garage/house )
Walls (R-19 including house/garage wall) ~~~` a,~ b ~~~, Ge~~~ S
~
0)
a ( b ~.~-1 ti„b (y ~ • 13•
loor
R-14
( ~
Vapor Barrier: paint
Baffles
6 mil black poly
DRY WALL NAILING
Walls
Ceiling ~~~
1/
~ (
Enclosed Space under Stairs l
GarageiHouse Occupancy Separation
Interior Braced Wall Panels
FINAL
Public Works Sign-Off
LPG
~G ~ //~ /~ ~ ~~
~ d/
House Numbers - 5" minimum
Plumbing
r-
~
~ ~~
~
MechanicaVHeating ~
~ ~
O ~
Vapor Barrier Paint Certificate
Insulation Certifcate
Smoke Detectors
Final - Buildin
Call 48 hours before you dig for utility live locates
1-800-A24-5555
Page 3 of 4
rya x erom.o~e
1. Contractors working on this project are required to have a Labor Bt Industries contraMor's reeistration
n m r sad a City business Gcensa Fa0nre to provide proof of this docnmeatatioe prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment rnntrol (TESC) measures shah be instatkd oo-site and inspected prior
to begiming construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (ace attached details). Adjacent rights-of-way shall be kept frce of dirt debris. Soils
ezposed dnriog rnnstruction shat! be temporarily stabilzed with mulching, plastic sheeting, eta So~7s
shall be permanently stabilized with seeding, plantings, sodding, eta once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require insPcetion prior to cover.
4. Owner or owner's agent shall review anal oversce correction of any and all deficienciav noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed
6. The Building Departmwt is unable to pass final inspection on your project natil Public Works
requirements have bees completed and inspected For Public Works inspection call 385-2294. A
minimum ottweMv-four hours notice is reamred Public Works aonroval mnst be recaved prior to
7, Final Inspections are required prior to occupancy; A Certificate of Occnpancy is required for a noo-
residentid proje~k.
8. All building permits expire if no progress has been made within sin months, or if no inspections are done
by the Building Department within one year. Call for at kart one inspection per year to keep your
building permit actives
9. Revisions require submittfd and approval prior to makinE changes in the field Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.