Loading...
HomeMy WebLinkAboutBLD02-075Waterman & Katz Building 181 Quinry Street Suite 301 Pat Tovmseo4 WA98368 Phase (360) 379.3208 Fax (360) 383-7673 CITY OF PORT TOWNSEND -J CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11 3 85-22 94 for Inspection Permit Number: $LDO2-O75 Issued: 05/16/02 Parcel Number: 957-312-804 Job Address: 1712 Clav Street Zoning: RR=II Type: VV=N Occupancy: RR=3 Total Occupant Load: 1 Nature of Work: Remodel workshoo to ADU Owner: Sandi Bird Contractor: O'Brien Construction - OBRIEC*006ND John @ 531-2430 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMTTS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RF.f7TiTRF.T) TIVCPF,C"TTniVS APPROVET)/1)ATE DEMOLITION Construction debris shall be deposited in the Jefferson County Landf 11 or other approved areas off-site FOUNDATION/FLOORFBAMING Existing PLUMBING: Rough-In (D-V-T & Clean Outs) (~ Wf~~~~G (JIQ~7/Its & ~ S . Water Supply /1// ~ Gas Supply ~~~~ (~/ Hose Bibs (backflow protection. required) Pipe Insulation - R-3 Pressure Reduction Valve if> 80 psi Water Heater Seismic Restraint - 2 places Pressure relief valve drain to exterior 18" A. F. F. R-10 under Ca1148 hours before you dig Tor utility line locates 1-800-424-5555 Building Permit #02-075 - '1 REOUTRED INSPECTIONS APPROVED/DATE MECHANICAL LP Gas Stove Manufacturer's Installation Instructions to be on-site @ time of inspection Whole House Ventilation: @ bath /,,~2 5 Q~ Kitchen Fan I YY / Environmental Air Exhaust ducting (with backdraft dampers), insulation (R-4) and terminus (located 3' from opening) FRAMING: Walls Roof 2 S/(~'L Attic Venting Ceilings Posts, beams & headers Windows -escape provided @ door Windows Ufactor - .30 or better Glass Block @ .51 NFRC window sucker must be on windows at inspection time Air Seal Fresh Air: wall or window ports required Fireblocking Weather Resistive Barrier INSULATION -Slab (R-7.5) /,1 /) / Wall (R-19 (~ new walls/fill exposed existinggavities) ~~ ~(j ~ S / // Ceiling (R-38 attic ) ~ Baffles Vapor Barrier: faced bans DRY WALL NAILING Walls ~~Q/~ OL~ Ceiling ~~~---(((,,, Ca1148 hours before you dig for utility line locates 1-800-424-5555 Building Permit #02-075 • FINAL LPC7 House Number -check 5" numbers Plumbing Mechanical Insulation Certificate Smoke Detectors Final -Building /U/z~/Q~ GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc..Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year, Call for at least one inspeMion per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 LI ~.