HomeMy WebLinkAboutBLD02-074Watermen & x,~ Budding
161 Qufury Street, Soile 301
Port Teworend, WA 98368
Phone: 360J79-5086 Fu360J65-7675
•
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: $I,DOZ-074 Issued: 06/19/02 Parcel Number: 989714103
Job Address: 419 Lawrence Street Zoning: RR=II Type: V_N Occupancy: R_3
Total Occupant Load: NC Nature of Work: Remodel Single-family Dwelling
Owner: James Roberts
Contractor: O'Brien Construction. Inc.
GENERAL CONDITIONS APPLY: See Last Page
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
RF.niTiRF,I) iNSPF.CTiONS
APPROVED/DATE
DEMOLITION
Materials from demolition shall be taken to the Jefferson
County Landfill or other approved off-site location
meeting adl state and local codes
FOOTINGS
Setbacks ~~ ~
Footings
Forms
Reinforcement
Deck Piers
FOUNDATION
Stem Wall ~~~~~~
Forms
Reinforcement
Engineered Holdowrts
Anchor Bolts -per engineered shear walls
Vents
Crawl Access
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 4
Building Pnmil #02-fY14
RE UIRED INSPECTIONS
FLOOR FRAMING
Beam - DF#I or LVL
Joists
Blocking
Treated Wood to Concrete
Positive Connections -A 35
PLUMBING
Rough-In (D-V-T & Clean outs)
~j I~ / J,ray
Water Supply J l7~
`
/ G
Water Hammer Arrestors Q clothes and dishwasher `
l
Gas Supply
Pipe Insulation (R-3)
Pressure Reduction Valve if,> 80 psi
MECHANICAL
Bath & Kitchen Fans
Whole House Fan
LPG Fireplace (if not existing)
Environmental Air Exhaust ducting (with backdraft dampers),
insulation (R-4) and termination (3' from openings into
building)
FRAMING
Walls
Engineered Shear Walls
Engineered Beams & Posts
7~~Q f Q7j
Ceiling
Attic Venting
Window U-Factor - :40 or better
Windows -escape
Windows -safety glazing
Fresh Air -wall ports
Rafter Positive Connection
Air Seal
Fireblocking ~
~ ~~ VY
Weather Resistive Barrier f
INSULATION
Slab
(R-10) ~~
,g/~r%
Wails (R-19) ,
Ceiling (R-30)
Vapor Barrier required
Baffles
APPROVED/DATE
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
Building Permit #OZ-074
RE UIRED INSPECTIONS APPROV /DATE
i
DRYWALL NAILING
Walls
Ceilings ry/~~~~
Gd/
FINAL
LPG
House Numbers - 5" numbers
Deck
Plumbing
Mechanical/fleating
`~j6~ ~
Insulation Certificate if applicable
Vapor Barrier Paint Certificate if applicable
Smoke Detectors throughout
Final -building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; ca11 385-2 2 94. Measures shall include
installation of sift fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is required. Public Works aparoval
must be received prior to scheduling the Building DeuartmenYs Tinal inspection.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
Building Pamil #02A74
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
8. All building permits eapire if no progress has been made within sia months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval arior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4