CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD02-O69 Issued: 04/26/02 Parcel Number: 989 800 046
Job Address: 823 Commerce Loon Zoning: PTBP PUD Type: VV=N Occupancy: AA=3
Total Occupant Load: No Chance
Nature of Work: Install three walls, ceiline and door to create a space for voea and dance instruction.
Owner: Port Townsend Business Park LLC Tenant and Contractor: Valley Gymnastics -Paul Nelson
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REOUIIiED:
Electrical -Contact Labor & Indusbies Q 360-417-1702
RE UIRED INSPECTIONS
APPROVED/DATE
FRAMING -barrier free design required
Walls
Positive Connections
Ceiling
Fire Blocking
DRYWALL
Walls
Ceiling
FINAL
Property address posted -min. 5"numbers
Bamer Free Access
Thresholds -maximum'/:"
Door Clearances
Lever Hardware
Exit Signage & Illumination
Final -Building
GENERAL CONDITIONS
• Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page I of 2
GENERAL CONDITIONS
1. Contractors wonting on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-ot-way shall be kept free of dirt debris. So~7s
exposed during construction shall be temporarily stabilized witl- mulching, Plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, eta once construction is complete.
Applicant ~ responsible for protection of adjacent properties.
3. AU elements of engineering including nailing, holdowas, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pasa final inspection on your projeM until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
•
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active
9. Revisions require submittal 8t approval prior to making changes in the field. Contact the Binding
Department Q 379-320ti prior to making changes to the approved plans.
I0. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before yon dig for utility line locates
I-800.424-5555
Page 2 of 2