Loading...
HomeMy WebLinkAboutBLD02-068Waterman & Kate Building Iel QuMey StreN, Sufte 30t Port Sowneeod. WA 98366 Phone: 360J79-6686 Fas 3663817175 n U CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: $LDO2-O68 Issued: 05/07/02 Parcel Number: 968500027 Job Address: 4265 Jackman Street Zoning: Lynnesfield PUD Type: V-N Occupancy: R-3/U-1 Total Occupant Load: 6/2 Nature of Work: Construct Single-family Dwelling w/ attached garage Owner: Steve & Linda Lockwood Contractor: Steve Cooper Construction GENERAL CONDITIONS APPLY: See last page SEPARATE PERMITS REOUIItED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 REQUIRED INSPECTIONS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL See General Condition #2 Graveled construction entrance required to prevent dirt and sediment from leaving the site FOOTINGS Setbacks Footings Forms Reinforcement Interior Footings Porch Piers UFER CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page I of 5 auaa~Bra,~aaotoca REOUTRED TNSPF.CTTnNS APPR(1VF.7)/Il ATF FOUNDATION Stem Wall Forms Reinforcement Anchor Bolts & Washers Vents - 72 required Crawl Access Beam Pockets/Hangers Alternate Braced Wall Panel Holdowns Waterproofing SLAB ®garage Setbacks Forms Reinforcement Anchor Bolts ABWP Holdowns FLOOR FRAMING Girder Joists -engineered BCI plan shall be on-site at time of inspection Blocking Shield under Posts Positive Connection Girder to Concrete Treated Wood to Concrete Anchor Bolts & Washers PLUMBING Rough-In (D-V-T & Clean outs) Water Supply Gas Supply Water Hammer Arrestors Hose Bibbs - backflow protection required Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi Water Heater Seismic Restraint - 2 places Pressure Relief Valve drain to exterior ^'1 J Ca1148 hours before you dig Tor utility line locates I-800-424-5555 Page 2 of 5 Building Prnnit #02-06g • RF.(1TTTRF,n TNSPF,C.TTnNS APPROVED/DATE MECHANICAL LPG Fireplace Whole house Fan -Bedroom #1 bath Source Specific Exhaust Fans Q kitchen (100 cfm), baths and utility room (50 cfm) Environmental air exhaust ducting (with backdraft dampers), insulation (R-4) and terminus (3' from openings into building) FRAMING Walls Roof- engineered truss and BCI rafter p/an shall be on-site at time of inspection Positive connection Attic venting -ridge & eave Posts, beams and headers Windows -escape Windows -safety glazing Window U-factor - .65 or better NFRC sticker must be on windows and doors at time of inspection Air Seal Fireblocking Weather Resistive Barrier INSULATION Floor (R-19 required Walls (R-19 ) Ceiling (R-30) Battles Vapor Barrier -paint DRYWALL NAILING Walls Ceiling Enclosed Usable Space under Stairs (if applicable) Interior Braced Wall Panels • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 5 Building Permd iW;.*-06g FINAL Public Works Sign-off LPG House Numbers - 5" numbers. Plumbing Mechanical/Iieating Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors Final -building 1 ~) \" / ~~ .' `\ \~'' GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected • prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construMion entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, eta once construction is complete. Applicant is responsible for proteMion of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Warks inspection call 385-2294. A minimum of twenty-font hours notice is required. Public Works approval must be received prior to scheduline the Buildine Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 4 of 5 Building Permit #02-06g ' 8. All building permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval urior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 5 of 5