Loading...
HomeMy WebLinkAboutBLD02-067City of Port Towsend Waterman & Katz Building I81 Quinty Street Suite 301 Port Townsend, WA98368 Phone (360) 379-3208 Fax (360) 385-7675 • CITY OF PORT TOWNSEND CONSTRUCTION PERNIIT & INSPECTION RECORD TffiS CARD MUST BE POSTED AT CONSTRUCTION STTE Call 385-2294 for Inspection Permit Number: $LDO2-O67R-I Issued: 8(01/02 Parcel Number: 987600401 Job Address: 829 22nd Street Zoning: R-11 Type: V_N Occupancy: R-3/U-1 Total Occupant Losd: 5 Nature of Work: Revision #I: Move interior walls: move WH & boiler to ¢araee: add roof over sunroom Owner: Greaorv Kassow & Lianne Perron Koslow Contractor: Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS R.EOUHiED: Electrical -Contact Labor & Industries @ 360-417-2702 REQUIRED INSPECTIONS APPROVED/DATE See also original inspection record PLUMBING: Gas Supply Pipe Insulation - R-3 Pressure Reduction Valve if> 80 psi Water Heater/Boiler I S" A. F. F. Seismic Restraint - 2 places Pressure relief valve drain to exterior; 6" - 24" above ground FRAMING: Ceiling/Roof-add roof over sunroom Blocking Positive Connections Posts, Beams & Headers Ca1148 hours before you dig Tor utility line locates I-800-424-5555 Page 1 of 2 Building Pmnit llBLDD2-067R-1 Final.- Building GENERAL CONDTTIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Soils ezposed during construction shall be temporarily stabilized with mulching, plastiesheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted: required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building DepartmenPs final inspection. 7. Final Inspections and CertiTicate of Occnpancy are required PRIOR to occupancy. 8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for st least one inspection per year to keep your building permit active. 9. Revisions require review and approval Arior to making changes in the field. Contact the Building Department at 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 City of Port Towaend Waterman & Katz Building 181 Quvuy Street Suite 301 Porl Townsend, WA98368 Phone (360) 379-3208 Faz (360) 383-7675 CITY OF PORT TOWNSEND • CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION STI'E Call 385-2294 Tor Inspection Permit Number: BLDO2-O67 Issued: 5/06102 Parcel Number: 987600401 Job Address: 829 22°d Street Zoning: R-11 Type: VV=N Occupancy: R-3/U-1 Total Occupant Load: 5 Nature of Work: Construct Sincle-family Dwellin¢ with earaee Owner: Greeorv Kossow & Lianne Perron Kossow Contractor: Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RF,OiJiRED INSPECTIONS APPROVED/DATE TEMP EROSION & SDM'T CONTROL (See attached details, SUDP #02-009 and General Condition #2) Silt Fence Drive OffMaY FOOTINGS NOTE: Rastra work to be done by cerlifeed Rastra D~ ofAmerica contractors only l ~ Setbacks Footings -per engineering Forms / Reinforcement -per engineering SUrcJ ~~~ (f/Z 2 DZ l Interior Footings -per engineering Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 5 Building Permit #BLD02-067 REQUIRED INSPECTIONS APPROVED/DATE FOUNDATION/RASTRA WALLS R i f i i „ n ` / ~' J n orcement -per eng neer ng e Anchor Bolts S j/ ~I ®~ 1 ~ ' 1Y / Engineered Holdowns Waterproofing //J~ ~v,U ~"'`- C~i / L 3/071 SLAB/GROUNDWORK PLUMBING Radiant Heat Tubing ~Z,// '7` R-10 Under Pressure Test Pipe Joints Exposed Pipe Bedding FLOOR FRAMING Joists -Engineered BCI plan to be on-site at time oflnspection v_l~, Beams, Headers & Lintels Blocking ~'~ G Positive Connection -Engineered Holdawns Treated Wood to Concrete ~ j ~ j~ O 3 Anchor Bolts & Washers / PLUMBING: ~\Z> Hydronic Tubing ~~ G Rough-In (D-V-T & Clean Outs) 3 3 ter Su 1 6 ~ Gas Supply Hose Bibs (backflow protection required) Pipe Insulation - R-3 - Pressure Reduction Valve if> 80 psi Water Heater Seismic Restraint - 2 places Pressure relief valve drain to exterior, 6" - 24" above ground • Call 48 hours before you dig for utility line locates I-800.424-5555 Page 2 of 5 Building Permit gBLD02-067 REQUIRED INSPECTIONS APPROVED/DATE • U MECHANICAL Boiler -manufacturer's installation instructions shall be on-site at time of inspection Whole House Fan - F-1 bath Source Specific Fans Environmental Air Exhaust ducting (with backdraft dampers), insulation (R-4) and terminus (located 3' from opening) FRAMING: Walls Engineered Shear Walls ~~ Engineered Lintels ~ - Ceiling/Roof Blocking ~ ~ ~ ~,. Seismic Anchors -Simpson H6 @ 32 " o.c. ~ , Attic Venting -gable end & eave l Posts, beams & headers ~ ~ / j/ ° 3 Windows -egress Windows -safety glazing Windows Ufactor - .50 or better NFRC window sticker must be on windows at inspection time Door - .41 & .57 or better _ ff~~~ ~ _ Air Seal -- -- -- - - _ _ (D1f~lG3 , ~~_~. Fresh Air Intake (Window) Fire Blocking O k. ~~_ (z __ __-_._ G-1(~ v~ Weep Screed INSULATION Slab (R=10) Wall (R-22 Rastra/R-19) D Ceiling (R-30) , Baffles B i i .~I/ _2 ' Vapor arr er. Pa nt (a (v'7i DRYWALL/NAILING Walls '~' ~~~; `Ilf~ ~ ! [ 3 Ceiling Ca11 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 5 Building Permit HBI.D02.067 FINAL Restrictive Covernmt required prior to ftnal LPG Public Works Sign-Off House Number - 5" minimum Plumbing Mechanical Insulation Certificate Vapor Barrier Paint Certificate Landings Smoke Detectors Final -Building n L.l GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected • prior to beginning construction; call385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wail panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspeMed. For Public Works inspeMion ca11385-2294, press 3; a minimum of twenty-four hours notice is required Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. Ca1148 hours before you dig for utility line locates 1-800.424-5555 Page 4 of 5 Building Permit #BLD02-067 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your • building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • • Call 48 hours before you dig for utility tine locates 1-800.424-5555 Page 5 of 5