HomeMy WebLinkAboutBLD02-066w.wmeo t Kah ~s
181 Qetory Street, Suks78l
Pelt Tewmeed, wA 95368
PMoe: 360J79-5086 PL:361JB5-7675
CITY OF PORT TOWNSEND
~_~
CONSTRUCTION PERMIT & INSPECTION RECORD
TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD02-066 Issued: 05/02/02 Parcel Number: 992-300-051
Job Address: 4338 San Juan Avenue Zoning: RR=II Type: V_N Occupancy: RR=3
Total Occupant Load: NC Nature of Work: Addition to Sin¢le-family Dwellin¢
Owner: Alan & Laura Anderson Contractor: Greg Pelham/Greenstreet Construction
GREENC•981DR (301-3706)
GENERAL CONDITIONS APPLY: See Last Page
SEPARATE PERMTfS REOUIIZED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
REQUIRED INSPECTIONS
APPROVED/DATE
DEMOLITION
Materials from demolition sha11 be taken to the Jefferson
County Landfill or other approved off~stte location
SLAB /~
Setbacks ~/~~f~~ i
l /
~
Forms ~~j,~
t f.~L~
Reinforcement ~--
J// ~DL,
~
Anchor Bolts & Washers ~a ~„R1j ~~~ ~ -i~, ~~
Insulation - R-10 @ perimeter ~ ~~
FRAMING
Walls
Roof -engineered truss plan shall be on-site at time of
~
j
Inspection ~
~ p~
Truss positive Connections
Attic Venting -ridge and eave
Windows -escape
Window U-factor - .43 or better
NFRC sticker must be on windows
Air Seal
Fireblocking
Weather Resistive Barrier
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 3
Building Permit #01-066
REQUIRED INSPECTIONS
APPROVED/DATE
INSULATION
Walls (R-19)
Slab (R-10)
Ceiling (R-38)
Baffles
Vapor Barrier: paint
DRYWALL NAILING
Walls
Ceilings
FINAL
Landings
House Numbers - 5" numbers
Insulation Certificate
Vapor Barrier Paint Certificate
Smoke Detectors throughout
Final -building
GENERAL CONDITIONS
I. Contractors working on this project are required to have a Labor & Industries
contractor's registration number and a Gity business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294. Measures shall include
installation of silt fencing and graveled constrnction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
c
Call 48 hours before you dig for utility line locates
I-800-424-3555
Page 2 of 3
Building Pmnit N02A66
• 6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is required. Public Works aagroval
must be received prior to scheduling the Building Deaartment's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
8. All building permits expire if no progress has been made within sia months, or if no
inspections are done by the Building Department within one year. Ca11 for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval riot to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
i
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3