Loading...
HomeMy WebLinkAboutBLD02-062 r wrt«s..: x,a HuildNg ,8,~~,,~30, r«cx..o«.a, wa eases reoo.:asas~mssoe r~s6oassaws CITY OF PORT TOWNSEND • 1 CONSTRUCTION PERMIT & INSPECTION RECORD TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD02-062 Issued: 04/17/02 Parcel Number: 948 317 401 Job Address: 1501 Loa n Street Zouing: R_II Type: V N Occupancy: R-3/U-1 Tatal Occupant Load: 412 Nature of Work: New sin¢l e-family dwelline with attached ¢araee Owaer: Neil Cavette dba Seven Bridees Prooerties LLC Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUIItED: Electrical -Contact Labor & Industries @ 360-417-2702 RF.[liliRF.T) TIVCPF.("I'i[)NS APPRnVF,T)/DATE TEMP EROSION & SEDIlI4ENT CONTROL See General Condition #2 Silt Fence as needed Drive Off Mat per attached details FOOTINGS ,i/~9 Q~ ~/ Setbacks Footings Forms Reinforcement Interior Footings Piers ~~~ FOUNDATION Stem Wall ~~~ Forms Reinforcement Anchor Bolts w/ 2" x 2" x 3/16" square washers Vents -19 required Crawl Access Beam Pockets Ca1148 hours before you dig for utility line locates 1-80U-424-5355 Page 1 of 4 ri r~astnmosz -„ ` REQUIRED INSPECTIONS APPROVED/DATE FLOOR FRAMING Engineered BClplavt to be on~rrte @ trine of rnspectron Girders Joists Blocking Shield under Posts Positive Correction Girder to Concrete Beam Pockets Treated Wood to Concrete Anchor Bolts & Washers Foundation Vents -14 required ~/ ~ 1 /("~T`,"(~ (~ S ' a3 • u 2 PLUMBING: Rough-In (D-V-T & Clean Outs) Water Supply Water Hammer Arrestor (a3 clothes lit dishwasher Hose Bibs (bacldlow protection required) Pipe Insulation - R-3 Pressure Reduction Valve if > 80 psi Water Heater R-10 under Seismic Restraint - 2 places 18" AF.F. Pressure relief valve drain to exterior MECHANICAL Electric Heat Pump Manufacturer's I»stallatronlnstructions to be on-site @ time of inspection Ducts & Duct Insulation -Supply/fresh air ducts in conditioned space: R-4; heating ducts in unconditioned space: R-8 Whole House Ventr'lation HVAC Integrated Fresl- Av / „ ~-l T' Smooth Duct minimum ~~ o~ Y~ l/ ~D Terminal Element - 8" Clock tuner on fi~rnaax fan Other than motorized damper requires letter of certification for flow rates See neat a e Ca1148 hours before you dig ter utility line locates I-800-424-5555 Page 2 ot4 • • I I Bnildiog Permit #I3LD02-062 RF.niTiRF.D iNSPECTinNS APPROVED/DATE MECHANICAL continued Source Specific Fans Environmental Air Exhaust ducting (with backdraft damper), insulation (R-4) and terminus (located 3' from opening) FRAMING waus l~2 5~~ Roof - Engineered truss plan to be o»-site at - time of inspection Attic Venting -continuous ridge vent Ceilings Posts, beams & headers Windows -egress Windows -safety glazing Windows Ufactor - .75 or better NFRC window sticker must be on )Endows, skylights & doors at inspection time Air Seal Skylights - .68 or better Doors Ufactor - .40 or better Truss Positive Connection Fire Blocking Weather Resistive Barrier INSULATION Floor (R-30) Wall (R-21 ) ~~Z ~~~~ Ceiling (R-38 ) Ba81es Vapor Barrier: paint Crawl space - 6 mil black poly DRY WALL NAII.ING Walls ~ ~L° Ceiling / Garage/House Occupancy Separation ~~j l~ Interior Braced Wall Panels -y ~, y. ~ Call 48 hours before you dig for utility lice locates 1-800-424-5555 Page 3 of 4 t"' ems era aa~.noz-ocs ~' TTATT. FINAL Public Works Sign-Off House Number - S" mrmbers Plumbing Mechanical -Ventilation Certification for Integrated System Insulation Certificate V. B. Pairt Certificate Smoke Detectors Final - Bur7ding G ~ /'l~~i /j~ (/% GENERAL CONDITIONS 1. Contractors working en this project are required to Gave a Labor 8c Industries contraMor's reeistration mm~ber and a City business license. Fa~7ure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC7 measures shall be installed on-site and inspected prior to begiming eoastruction; caD 385-2294. Measures shall iudude installation of silt fencing and graveled construction entrance (see attached deta~7s). Adjacent rights-of way stall be kept free of dirt and debrss. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. So~7s shah be permanently stabilized with seeding, Plantings, sodding, eta once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall pane (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re•inspectlon is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294; a minimum of twenty-four boon noticeu required. Public Works approval must be received prior to scheduling the Building Department's 5na1 inspection 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All bu0ding permit eipire if no progress has been made within sa months, or if no inspections are done by the Budding Department within one year. Call for at keel one inspection per year to keep your building permit olive. R Revisions require review aed approval 'or to mating changes in the field. Contact the Buddmg Department at 379-5086 riot to malting changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca9 48 hours before you dig for utility line locates 1-800-4245553 Page 4 of 4