HomeMy WebLinkAboutBLD02-061Waterman & KmzBuilding
1 BI Qainry Sired, Suite 301
Port 7owruend, WA 98368
Phone: (360) 319-3zos Fa,<: (360) 365-~6-~s
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDO2-O61 Issued: 04/26/02 Parcel Number: 948-305-504
Job Address: 1308 Gise Street Zoning: R-II Type: VV=N Occupancy: U-1
Nature of Work: Construct 720 square foot Pole Garaee
Owner: Jeremv & Svmbalvn Hewitt Contractor: Same as Owner
379-8303
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RF.nTTTRF.n TNSPF,('TT(lNS APPROVF.T)/nATF.
TEMPORARY EROSION & SEDIMENT
CONTROL
See General Condition No 2, install on-site as needed
during construction -okay to use existing driveway as
'construction entrance
FOOTING
Setbacks
~/~ ~~)L
Post Footings - (10) 4' deep per engineered plans
Forms
SLAB -nonstructural
FRAMING
Girts //~~ /'~
~~/L / ~e
Z ~
/
Pudins `~
,
Trusses /
Posts - 6" x 6" P. T. per engineering
Blocking
Positive Connection -per engineered section detail
FINAL
Final -Building ~~~~0~ /~ /J
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
r~exainm.a~ :~
GENERAL CONDITIONS _
1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance. Adjacent rights-of--way shall be kept free of dirt & debris. Soils exposed during
construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is
responsible far protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing,-and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required for anon-
residential project.
8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2