Permit Number: BLD02-059 Issued: 04/11/02 Parcel Number: 984 601 204
Job Address: 1428 Monroe Street Zoning: RR=II Type: VV=N Occupancy: R-3
Tokal Occupant Load: No Chanee
Nature of Work: Construct deck under ezistine covered north roof• install concrete sidewalk and aatio
Owner Bruce Freeland
ContraMor: Paradise Bav Construction
(437-9344)
GENERAL CONDTITONS APPLY -SEE LAST PAGE
RE UIRED INSPECTIONS
APPROVED/DATE
FOOTINGS
Setbacks 7~Z~d 2-
Deck Footings
Reinforceme~
FLOOR FRAMING
Girders
Joists
Blocking
Shield under Posts
Positive Connections
Treated Wood to Concrete
FRAMING / J j
NOTE: All framing members exposed to weather to be ~j/~j~~
pressure treated wood or of natural resistance to decay 111
Posts & Beams
Ledger
Rafters
Hangers
Positive Connections
Blocking
Roof Surface
Safety Glazing
Guardrails
NAL
House Numbers posted (min. 5'~ ~ ~~
~J J` L
Smoke Detectors throughout existing construction per 1997 UBC;
battery powered okay
Deck -Final
Call 48 hairs before you dig for utility line locates:
1-800-424-5555
Page 1 of 2
Puvtit K BLL1Q7.059
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor lit Industries contractor's re¢istration
number and a amity business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is acwmplished.
2. Temporary erosion and sediment control (TESL) measure shall be installed on-site and inspected prior
to beginning construction; cs11385-2294. Measures shall include installation of silt fencing and gravek:d
construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils
ezposed during construction shall be temporarily stab~7ned with mulching, plastic sheeting,
etc. So~7s shall be permanently stabilized with seeding, Plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties
3. All elements of engineering including nailing, hoidowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
S. Re-inspection is required after inspection report corrections are completed.
6. The Building Department u unable: to pass final inspection on your project until Public Works "r
requirements Gave been completed and inspected. Fer Public Works inspection call385-2294. A
:..:~..Y ..e a....._a.. r_.._ L_..-_ __.:__ :_ r._..:__~ O..L~:_ lL_J._ __~__.._~ ~___a L....__.._J _~!_~ a.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a noo-
residential project.
8. All building permits expire if no progress has been made within siz months, or if no inspections are done
by the Building Department within osu year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal 8c approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
~a
Ca1148 hoary before you dig for utility line locates:
1-800-424553