CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD02-057 Issued: 3/29102 Parcel Number: 948 301003
Job Address: Port of Port Townsend 2790 Washington Street. Yard Saace ii223 Zoning: M-IIA
Type: V_N Occupancy: U-1 Nature of Work: Build Temuorarv Structure - 525 square foot boat shed.
Property Owner: Port of Port Townsend Contractor/Owner: Ben Hemel
NOTE: This permit expires 3/29/03. One extension may be granted for a period not to exceed one year
from the Port of Port Townserul The permit extension fee is $47.00,• contact the Building and Community
Development Department at 379-3208 to request the extension.
lyF,NF,RAL CONDTTIONS APPLY -SEE LAST PAGE
ELECTRICAL - a separate electrical permit is required for any electrical work Contact Labor
and Industries at (360) 417-2700 if needed.
Framing Inspection maybe done at Final
Inspection if all elements of framing aze
visible.
Storage is unheated.
Positive connection to ground per plans.
Storage of flammable products not allowed.
On-site quantities and storage of
flammable products must be in approved
Liquid Storage Cabinets per Uniform Fire
Code provisions. Contact Tom Aumock,
Fire Department at 385-2626 for more
information.
F'mal -Fire Department
2-A:10-B;C minimum rated fire
extinguisher required.
Final -Building Department
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
r®a,rn~,nozos~
GENERAL CONDITIONS
1. Contractors working on this projeM are required to have a Labor & Industries contractor's re¢istration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
ezpoxd during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized wkh seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels-
(ABWP) require inspection prior to cover.
4. Owner or owner's age~rt shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass fmal inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
schedulin¢ the Building Department's final insoeMion.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits ezpire if no progress has been made within sia mo~rths, or if no inspections are done
by tbe Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Bm7ding
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.