Loading...
HomeMy WebLinkAboutBLD02-056Waterman & PatzBirildi~ 181 Quinry Sbeel, Strite 301 Port Toutuend, WA 98368 lfione: (360)379-3208 Fax: (360)385-7675 CITY OF PORT TOWNSEND . CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOZ-OSC) Issued: 03/28/02 Parcel Number: 988801201 Job Address: 806 Tvler Street Zoning: RR=II Type: VV=N Occupancy: U-1 Nature of Work: Construct new foundation under Qaraee Owner: Susan Webb Contractor: Eastside Remodeline GENERAL CONDITIONS APPLY -SEE LAST PAGE RRnTTTRF.D TNSPF.CTTONS I" L_ Occupant Load• NC APPROVED/DATE TEMPORARY EROSION & SEDIMENT CONTROL See General Condition No. 2 -install on-site as needed during construction to prevent sediment from leaving and site and to eliminate tracking of soil onto the street. DEMOLITION Materials from demolition shall be deposited in the Jefferson County Landfill or other areas off-site that meet all state and local laws FOOTINGS Setbacks - NC / p //z 6~~L Footings 111 Forms Reinforcement UFER FOUNDATION Stem Wall (~j~/d~ Forms ~l / Reinforcement Anchor Bolts w/2" x 2" x 3116" square washers Vents Crawl space access Positive Connections Treated Wood to Concrete 6 mil black poly Call 48 hours before you dig for utility line locates I-800-424-5555 Page I of 2 will ~~ ~ ~-Du Pmtil # BI,DOZ-056 REQUIRED INSPECTIONS APPROVED/DATE FLOOR FRAMING Replace Joists -see notes on plans , FINAL House number -check for 5" numbers Final -building ~ h C B ~ ~,~ ~ GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance. Adjacent rights-of--way shall be kept free of dirt & debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspeMions. 5. Re-inspection is required afrer inspection report corrections are completed. 6. The Building Department is unable to pass final inspeMion on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Deaartment's final inspection. 7. Final InspeMions are required prior to occupancy. A Certificate of Occupancy is required for anon- residential project. 8. All building permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit aMive. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility tine locates 1-800.424-5555 Page 2 of 2