HomeMy WebLinkAboutBLD02-056Waterman & PatzBirildi~
181 Quinry Sbeel, Strite 301
Port Toutuend, WA 98368
lfione: (360)379-3208 Fax: (360)385-7675
CITY OF PORT TOWNSEND
. CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOZ-OSC) Issued: 03/28/02 Parcel Number: 988801201
Job Address: 806 Tvler Street Zoning: RR=II Type: VV=N Occupancy: U-1
Nature of Work: Construct new foundation under Qaraee
Owner: Susan Webb Contractor: Eastside Remodeline
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RRnTTTRF.D TNSPF.CTTONS
I"
L_
Occupant Load• NC
APPROVED/DATE
TEMPORARY EROSION & SEDIMENT CONTROL
See General Condition No. 2 -install on-site as needed during
construction to prevent sediment from leaving and site and to
eliminate tracking of soil onto the street.
DEMOLITION
Materials from demolition shall be deposited in the Jefferson
County Landfill or other areas off-site that meet all state and local
laws
FOOTINGS
Setbacks - NC / p
//z 6~~L
Footings 111
Forms
Reinforcement
UFER
FOUNDATION
Stem Wall
(~j~/d~
Forms ~l /
Reinforcement
Anchor Bolts w/2" x 2" x 3116" square washers
Vents
Crawl space access
Positive Connections
Treated Wood to Concrete
6 mil black poly
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page I of 2
will ~~ ~ ~-Du
Pmtil # BI,DOZ-056
REQUIRED INSPECTIONS
APPROVED/DATE
FLOOR FRAMING
Replace Joists -see notes on plans ,
FINAL
House number -check for 5" numbers
Final -building
~ h C B
~ ~,~
~
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance. Adjacent rights-of--way shall be kept free of dirt & debris. Soils exposed during
construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is
responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspeMions.
5. Re-inspection is required afrer inspection report corrections are completed.
6. The Building Department is unable to pass final inspeMion on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Deaartment's final inspection.
7. Final InspeMions are required prior to occupancy. A Certificate of Occupancy is required for anon-
residential project.
8. All building permits expire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit aMive.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility tine locates
1-800.424-5555
Page 2 of 2