HomeMy WebLinkAboutBLD02-054Wazemun&KatzBuildiog
161 QuincyStree4 Suite 301
PortTOwnaend, WA 98368
Phone: (360)379-3208 Fax: (360)3857675
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD02-O54R-1 Issued: 08/29/02 Parcel Number: 955 900 056
Job Address: 2505 Richland Looo Zoning: Hamilton Heiehts PUD Type: VV=N
Total Occupant Load: 512 Occupancy: R-3/U-1
Nature of Work: Chance location of foundation holdowns
Owner: Hamilton Heiehts LLC
****All elements of engineering including holdowns, reinforcing steel, anchor bolts and
connections require inspection prior to cover****
GENERAL CONDITIONS APPLY -SEE LAST PAGE
• SEPARATE PERMTI'S REOUIItED:
Electrical -Contact Labor & Industries @ 360-417-2702
See original permit BLD02-054 for other inspections.
Ertgfneered Holdrnvns -Revise Holdawn locations
Contractor: Same as Owner
~l~~oz-
CITY OF PORT TOWNSEND
• Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
~.~_~
1. Contractors working on this project are required to Gave a Labor & Industries contractor's registration
n m r and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
Z. Temporary erosion and sediment control (1'ESC) measures s6s11 be installed on-site and inspected prior
to begiming construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of-way shall be kept tree of dirt debris. Soils
ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabfiized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon- •
residential project.
8. All building permits eapire if no progress has been made within sia months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. CORtaet the Building
Department (379-3208) prior to making changes to We approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800.424-5555
Page 2 of 2
Wslama&ICatzB~ld'xg
I81 Q®cy 9Vee1, Suite 301
Pmt Towmeo4 WA96366
Phone: (360)3793208 Fax: (360)379-6923
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDO2-O54 Issued: 4/17/02 Parcel Number: 947 600101
Job Address: 2505 Hi261and Looo Zoning: PUD Type: VV=N Total Occupant Load: 512
Occupancy: R 3 !U-1 Nature of Work: Construct Sinele family residence with attached aaraQe
Owner: Hamilton Heiebts LLC
Contractor: Same as Owner
****All elements of engineering includingholdowns,,framing, nailing, sheathing and
other engineered connections require inspection prior to cover****
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMTTS REOUIIiED:
Electrical -Contact Labor & Industries @ 360-417-2702
~REOUIIZED INSPECTIONS
APPROVED/DATE
TEMP EROSION & SDM'T CONTROL
See General Condition No. 2 andMIP02-025
FOOTINGS
Setbacks _ / /O~
C
s/h/
Footings l
Forms
Reinforcement
Interior Footings
Porch Piers
UFER
Cal! 48 hours before you dig for utility tine locates
1-800.424-5555
Page 1 of S
~~~8~-~,
REQUIRED INSPECTIONS APPROVED/DATE
FOUNDATION
Stem Wall
Forms
Reinforcement
Anchor Bolts & Washers
Engineered Holdowns
Vents -17 required
Crawl Access ~L~
Post-to-Foundation Wall Positive Connection/BeamPnckets
~/t)/O.~ n~
t/ D l`;}l'
~~ / I D 7
l l/ L/
FLOOR FRAMING
NOTE: Engineered BCI floor joist plan shall be on-site at time of /
/~ I Z) ('~ 7
inspection / I v C/
7
Girder l
Joists
Blocking
Shield under Posts
Post-to-Foundation Wall Positive Connection/BeamPnckets
Treated Wood to Concrete
Anchor Bolts and Washers
PLUMBING:
Rough-In (D-V-T & Clean outs)
~ I/JV ~ IA)S ~l/3/oZ -
_
Water Supply [
/
(
Water Hammer Arrestor @ clothes and dishwasher
Hose Bibs (backflow protection required)
Pipe Insulation (R-3)
Pressure Reduction Valve if > 80 psi
Water Heater
Seismic Restraint - 2 places
Pressure relief valve drain to exterior, terminate
6" - 24" above ground
.J
M
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page2of5
Pmuil # HLD02-054
REQUIRED INSPECTIONS APPROVED/DATE
MECHANICAL
Eledtric Forced Air -manufacturer's installation instructions
r shall be on-site at time of inspection
Ducts & Duct Insulation -supply/fresh air ducts in conditioned
space: R-4; heating ducts in unconditioned space: R-8
Whole House Ventilation
HVAC Integrated Fresh Air
7" minimum smooth duct
8" terminal element
Clock timer on furnace fan
Other than motorized damper requires letter of certification for
flow rates
Source Specific Fans
Environmental Air Exhaust ducting (w/ backdraft
dampers), insulation (R-4) and terminus (located 3'
from opening)
FRAMING:
ll
W
a
s
Engineered shear walls
~~~j/~~
Posts.& Beams other than 4": DF #1 /(~
Ceiling
Roof -engineered truss plan to be on-site at time of inspection
Truss Positive Connection
'Roof Venting -ridge & eave
Windows -escape
Windows -safety glazing
Windows U-factor - .39 or better
Door U-factor - .20 or better
Skylights - .40 U-factor or better
NFRC window sticker must be on windows, skylights and doors
at inspection time
Fresh Air -integrated
Air Seat
Fire Blocking
Weather Resistive Barrier
INSULATION
Floor (R=30) ~~ ~/ „ ~
L`
~/~i
Walls (R_21 ) `
Ceiling (R_38)
Baffles
Vapor Barrier. paint & 4 mil poly
6 mil black poly
Call 48 hours before you dig for utility line locates
- I-800-424-5555
Page 3 of 5
«8~~,
REQUIRED INSPECTIONS APPROVF.nmATiR
DRY WALL NAII.ING _- _ --- -- ---
Walls
Ceiling
CmragelHouse Occupancy Separation
q/,~ o~
FINAL
Pubh'c Works Sign-Off
House Numbers - S" minimum
Plumbing
Mechanics!
Insulation Certificate
Vapor Barrier Paint Certificate
Fresh Av Certification
Smoke Detectors
Final -Building
C Z / ~( ~~
/
1. Contractors wonting on this project are requved to 6sve a Labor & Indu 'es contractor's registration
number and a City business Gca~se Failure to provide proof of this documentation prior to work m^y
result io job shut dawn wh7e this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294. Measures shalt include installation of silt fencing and graveled
construction entrance (see attached details), Adjacent rights-of-way shall be kept free of dirt debris. Soils
eipoaed during construction shall be temporarily stabilized with mulching, Plastic sheeting, eta Soils
shall be permanently stabilzded with seeding, plantings, sodding, eta once rnnstruction is complete
Applicant ss responsibk for protection of adjacent properties.
3. All elements of engineering including nailing, 6oldowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent sha8 review and oversee correction of any and all deficiencses noted by required
inspections.
5. Rc-inspection ss required aRer inspection report corrections are completed.
6. The Building Department k uaabk to pass 5nsl inspection on your project until Public Works
requirements have been compkted and suspected. For Public Works inspeMion call 385-2294. ~
CaH 48 hours before you dig for utility line locates
1-800-424-5555
Page4of5
Permit N HLDOI-054
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-
. residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
U
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 5 of 5
~i
•
`_