Loading...
HomeMy WebLinkAboutBLD02-054Wazemun&KatzBuildiog 161 QuincyStree4 Suite 301 PortTOwnaend, WA 98368 Phone: (360)379-3208 Fax: (360)3857675 CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD02-O54R-1 Issued: 08/29/02 Parcel Number: 955 900 056 Job Address: 2505 Richland Looo Zoning: Hamilton Heiehts PUD Type: VV=N Total Occupant Load: 512 Occupancy: R-3/U-1 Nature of Work: Chance location of foundation holdowns Owner: Hamilton Heiehts LLC ****All elements of engineering including holdowns, reinforcing steel, anchor bolts and connections require inspection prior to cover**** GENERAL CONDITIONS APPLY -SEE LAST PAGE • SEPARATE PERMTI'S REOUIItED: Electrical -Contact Labor & Industries @ 360-417-2702 See original permit BLD02-054 for other inspections. Ertgfneered Holdrnvns -Revise Holdawn locations Contractor: Same as Owner ~l~~oz- CITY OF PORT TOWNSEND • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 ~.~_~ 1. Contractors working on this project are required to Gave a Labor & Industries contractor's registration n m r and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. Z. Temporary erosion and sediment control (1'ESC) measures s6s11 be installed on-site and inspected prior to begiming construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept tree of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabfiized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon- • residential project. 8. All building permits eapire if no progress has been made within sia months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. CORtaet the Building Department (379-3208) prior to making changes to We approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800.424-5555 Page 2 of 2 Wslama&ICatzB~ld'xg I81 Q®cy 9Vee1, Suite 301 Pmt Towmeo4 WA96366 Phone: (360)3793208 Fax: (360)379-6923 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDO2-O54 Issued: 4/17/02 Parcel Number: 947 600101 Job Address: 2505 Hi261and Looo Zoning: PUD Type: VV=N Total Occupant Load: 512 Occupancy: R 3 !U-1 Nature of Work: Construct Sinele family residence with attached aaraQe Owner: Hamilton Heiebts LLC Contractor: Same as Owner ****All elements of engineering includingholdowns,,framing, nailing, sheathing and other engineered connections require inspection prior to cover**** GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMTTS REOUIIiED: Electrical -Contact Labor & Industries @ 360-417-2702 ~REOUIIZED INSPECTIONS APPROVED/DATE TEMP EROSION & SDM'T CONTROL See General Condition No. 2 andMIP02-025 FOOTINGS Setbacks _ / /O~ C s/h/ Footings l Forms Reinforcement Interior Footings Porch Piers UFER Cal! 48 hours before you dig for utility tine locates 1-800.424-5555 Page 1 of S ~~~8~-~, REQUIRED INSPECTIONS APPROVED/DATE FOUNDATION Stem Wall Forms Reinforcement Anchor Bolts & Washers Engineered Holdowns Vents -17 required Crawl Access ~L~ Post-to-Foundation Wall Positive Connection/BeamPnckets ~/t)/O.~ n~ t/ D l`;}l' ~~ / I D 7 l l/ L/ FLOOR FRAMING NOTE: Engineered BCI floor joist plan shall be on-site at time of / /~ I Z) ('~ 7 inspection / I v C/ 7 Girder l Joists Blocking Shield under Posts Post-to-Foundation Wall Positive Connection/BeamPnckets Treated Wood to Concrete Anchor Bolts and Washers PLUMBING: Rough-In (D-V-T & Clean outs) ~ I/JV ~ IA)S ~l/3/oZ - _ Water Supply [ / ( Water Hammer Arrestor @ clothes and dishwasher Hose Bibs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve if > 80 psi Water Heater Seismic Restraint - 2 places Pressure relief valve drain to exterior, terminate 6" - 24" above ground .J M Ca1148 hours before you dig for utility line locates I-800-424-5555 Page2of5 Pmuil # HLD02-054 REQUIRED INSPECTIONS APPROVED/DATE MECHANICAL Eledtric Forced Air -manufacturer's installation instructions r shall be on-site at time of inspection Ducts & Duct Insulation -supply/fresh air ducts in conditioned space: R-4; heating ducts in unconditioned space: R-8 Whole House Ventilation HVAC Integrated Fresh Air 7" minimum smooth duct 8" terminal element Clock timer on furnace fan Other than motorized damper requires letter of certification for flow rates Source Specific Fans Environmental Air Exhaust ducting (w/ backdraft dampers), insulation (R-4) and terminus (located 3' from opening) FRAMING: ll W a s Engineered shear walls ~~~j/~~ Posts.& Beams other than 4": DF #1 /(~ Ceiling Roof -engineered truss plan to be on-site at time of inspection Truss Positive Connection 'Roof Venting -ridge & eave Windows -escape Windows -safety glazing Windows U-factor - .39 or better Door U-factor - .20 or better Skylights - .40 U-factor or better NFRC window sticker must be on windows, skylights and doors at inspection time Fresh Air -integrated Air Seat Fire Blocking Weather Resistive Barrier INSULATION Floor (R=30) ~~ ~/ „ ~ L` ~/~i Walls (R_21 ) ` Ceiling (R_38) Baffles Vapor Barrier. paint & 4 mil poly 6 mil black poly Call 48 hours before you dig for utility line locates - I-800-424-5555 Page 3 of 5 «8~~, REQUIRED INSPECTIONS APPROVF.nmATiR DRY WALL NAII.ING _- _ --- -- --- Walls Ceiling CmragelHouse Occupancy Separation q/,~ o~ FINAL Pubh'c Works Sign-Off House Numbers - S" minimum Plumbing Mechanics! Insulation Certificate Vapor Barrier Paint Certificate Fresh Av Certification Smoke Detectors Final -Building C Z / ~( ~~ / 1. Contractors wonting on this project are requved to 6sve a Labor & Indu 'es contractor's registration number and a City business Gca~se Failure to provide proof of this documentation prior to work m^y result io job shut dawn wh7e this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shalt include installation of silt fencing and graveled construction entrance (see attached details), Adjacent rights-of-way shall be kept free of dirt debris. Soils eipoaed during construction shall be temporarily stabilized with mulching, Plastic sheeting, eta Soils shall be permanently stabilzded with seeding, plantings, sodding, eta once rnnstruction is complete Applicant ss responsibk for protection of adjacent properties. 3. All elements of engineering including nailing, 6oldowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent sha8 review and oversee correction of any and all deficiencses noted by required inspections. 5. Rc-inspection ss required aRer inspection report corrections are completed. 6. The Building Department k uaabk to pass 5nsl inspection on your project until Public Works requirements have been compkted and suspected. For Public Works inspeMion call 385-2294. ~ CaH 48 hours before you dig for utility line locates 1-800-424-5555 Page4of5 Permit N HLDOI-054 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon- . residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. U Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 5 of 5 ~i • `_