Loading...
HomeMy WebLinkAboutBLD02-053Wetnmm$KNZBuilding 181 Qunry Sheet, Suit 301 Pmt Towmmd, WA 98368 Phcne: (360) 3793208 Fac (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD02-053 Issued: 03-21-02 Parcel Number: 948 309104 Job Address: 110618 Street Zoning: RR=II Type: VV=N Occupancy: RR=3 Nature of Work: Replace 9 windows with double-sane windows, same size in existing rou¢h openings. Owner: Harrv & Anne Marie Fountain (385-1048) Contractor: Groves & Co. Inc. GENERAL CONDITIONS APPLY -SEE LAST PAGE REOUiRED INSPECTIONS APPROVED/DATE • FRAMING/FINAL: Windows -safety glazing where applicable per attached details. Escape Windows - applicable in bedrooms if enlarging existing window sizes Window Ufactor - .65 or better (other fuels heat) NFRC window sticker must be on windows at inspection time Air Seal FINAL Smoke Detectors throughout house per 1997 Uniform Building Code; battery powered smoke detectors adequate in existing constroction House Numbers -check for 5" high Final -Building Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 GENERAL CONDTITON5 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may resuk in job shut down wh~7e-this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site sad inspected prior to beginning construction; ca11385-2294. Measures shall include installation of sik fencing and graveled constrnctioa entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Sw7s esposed during construction shall be temporardy stabilized with mulching, plastic sheeting, etc. Sods shall be permanently stabilized with sceding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. ~ 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required for anon- residential project. 8. All building permib expire if no progress bas been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal 8c approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before yon dig for aU7ity line locates 1-800-424-5555 Page 2 of 2