HomeMy WebLinkAboutBLD02-049
Waternm Q. Katr BuYdInB
181 Quh~ry Strn4 Suae 701
Porl7ownaend. WA 98368
Phone: 360379-320H Fsa 760385-7675
CITY OF PORT TOWNSEND
•
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION S]TE
Ca11385-2294 for Inspection
Permit Number: BLDO2-O49R-1 Issued: 4/23102 Parcel Number: 933-301-714
Job Address: 4556 McNeil Street Zoning: RR=II Type: V-N Occupancy: U_1
Total Occupant Load: 2 Nature of Work: Detached Garaee
Owner: Timothy M. Durner Contractor; Same as Owner
385-6997
~~, ~ol~~/ov ~
GENERAL CONDITIONS APPLY: See last pose
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
RF,fITTTRF.T> TNSPF.f'TTON~
APPROVED/DATE
TEMPORARY EROSION & SEDIMENT CONTROL
Contractor/permit holder shall ensure that dirt and
sediment are not tracked onto City rights-of--way
FOOTINGS
Setbacks
Forms
Footings
Reinforcement
FOUNDATION
CMU Stem Wall
Reinforcement
Anchor Bolts
SLAB
Non-structural
CALL 48 hours before you dig for Utility Tine locates
1-500-424-5555
Page 1 of 3
Building Pcmit #02-049R-1
REQUIRED INSPECTIONS APPROVED/DATE
FRAMING
Walls
Treated Wood to Concrete
Anchor Bolts & Washers
Roof
Rafter Positive Connection
Attic Venting - eave and roof
Safety Glazing
Skylights
Doors
Fire Blocking
Weather Resistive Barrier
INSULATION
Unheated space
FINAL
Final -building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
reeistration number and a City business license. Failure to provide proof of this documentation
prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected
prior to beginning construction; ca1138S2294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be
kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with
mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings,
sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent
properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall
panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
Ca1148 hours before you dig for utility line locates-
I-800-424-5555
Page 2 of 3
Waterman & Kali BW WIa~
181 Qulory Street, SWIe 301
PM Towatend, WA 983W
Phone: 360379J200 Fax 360J85-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION STtE
Ca11385-2294 for Inspection
Permit Number: BLDO2-O49 Issued: 4/23/02 Parcel Number: 933-301-714
Job Address: 4556 McNeil Street Zoning: RR=II Type: VV=N Occupancy: RR_3
Total Occupant Load: N/C Nature of Work: Residential Sunroom; replace windows in house
Owner: Timothy M. Durner
385-6997
GENERAL CONDITIONS APPLY: See last page
Contractor: Same as Owner
SEPARATE PERMITS REQUHiED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
RFOTTTRF.TI TNQPF.f TTl1NC
APPR(1VF1)/I~ATF.
TEMPORARY EROSION & SEDIMENT CONTROL
Contractor/permit holder shall ensure that dirt and
sediment are not tracked onto City rights-of--way
FOOTINGS
Setbacks
Forms
Footings
Reinforcement
FOUNDATION
CMU Stem Wall
Reinforcement
Anchor Bolts
SLAB
Non-structural
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page I of 3
r
Building Pumit #02-049R-1
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected For Public Works inspection call 385-2294,
press 3. A minimum of twenty-four hours notice is required. Public Works approval must be
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a
non-residential project.
8. All building permits expire if no progress has been made within siz months, or if no inspections
are done by the Building Department within one year. Call for at least one inspeMion per year to
.keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3
Building Pemut #02-049
RE UIRED INSPECTIONS APPROVED/DATE
FRAMING -Manufacturer's engineering by WA
licensed engineer for sunroom shall be on-site at
time of inspection
Walls
Treated Wood to Concrete
Anchor Bolts & Washers
Engineered Shear Walls
Roof- engineered sheathing
Rafter Positive Connection
Attic Venting - eave and roof
Window U-factor (existing house):.60 or better
NFRC sticker shall be on windows, skylights & doors at
time of inspection
Safety Glazing
Skylights - .58 or better
Doors - .40 or better
Fire Blocking
Weather Resistive Barrier
INSULATION
Unheated space
FINAL
House Numbers - check for 5" numbers
Smoke Detectors throughout existing house -battery
powered okay in existing construction
Final -building
GENERAL CONDITIONS
1. Contractors working on this project are required to have s Labor & Industries contractor's
r_pistration number and a City business license. Failure to provide proof of this documentation
prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be
kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 2 of 3
.. -.
Building Permit #02-049
mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings,
sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent
properties.
3. All elements of engineering. jnctuding nailing, holdowns, sheathing, and alternate braced wall
panels (ABWP) require inspection. prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final.inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294,
press 3. A minimum of twenty-foam hours notice is required. Public Works approval must be
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a
non-residential project.
8. All building permits expire if no progress has been made within siz months, or if no inspections
are done by the Building Department within one year. Call for at least one inspection per year to
keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
L0. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3