Loading...
HomeMy WebLinkAboutBLD02-049 Waternm Q. Katr BuYdInB 181 Quh~ry Strn4 Suae 701 Porl7ownaend. WA 98368 Phone: 360379-320H Fsa 760385-7675 CITY OF PORT TOWNSEND • CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION S]TE Ca11385-2294 for Inspection Permit Number: BLDO2-O49R-1 Issued: 4/23102 Parcel Number: 933-301-714 Job Address: 4556 McNeil Street Zoning: RR=II Type: V-N Occupancy: U_1 Total Occupant Load: 2 Nature of Work: Detached Garaee Owner: Timothy M. Durner Contractor; Same as Owner 385-6997 ~~, ~ol~~/ov ~ GENERAL CONDITIONS APPLY: See last pose SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 RF,fITTTRF.T> TNSPF.f'TTON~ APPROVED/DATE TEMPORARY EROSION & SEDIMENT CONTROL Contractor/permit holder shall ensure that dirt and sediment are not tracked onto City rights-of--way FOOTINGS Setbacks Forms Footings Reinforcement FOUNDATION CMU Stem Wall Reinforcement Anchor Bolts SLAB Non-structural CALL 48 hours before you dig for Utility Tine locates 1-500-424-5555 Page 1 of 3 Building Pcmit #02-049R-1 REQUIRED INSPECTIONS APPROVED/DATE FRAMING Walls Treated Wood to Concrete Anchor Bolts & Washers Roof Rafter Positive Connection Attic Venting - eave and roof Safety Glazing Skylights Doors Fire Blocking Weather Resistive Barrier INSULATION Unheated space FINAL Final -building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; ca1138S2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. Ca1148 hours before you dig for utility line locates- I-800-424-5555 Page 2 of 3 Waterman & Kali BW WIa~ 181 Qulory Street, SWIe 301 PM Towatend, WA 983W Phone: 360379J200 Fax 360J85-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION STtE Ca11385-2294 for Inspection Permit Number: BLDO2-O49 Issued: 4/23/02 Parcel Number: 933-301-714 Job Address: 4556 McNeil Street Zoning: RR=II Type: VV=N Occupancy: RR_3 Total Occupant Load: N/C Nature of Work: Residential Sunroom; replace windows in house Owner: Timothy M. Durner 385-6997 GENERAL CONDITIONS APPLY: See last page Contractor: Same as Owner SEPARATE PERMITS REQUHiED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 RFOTTTRF.TI TNQPF.f TTl1NC APPR(1VF1)/I~ATF. TEMPORARY EROSION & SEDIMENT CONTROL Contractor/permit holder shall ensure that dirt and sediment are not tracked onto City rights-of--way FOOTINGS Setbacks Forms Footings Reinforcement FOUNDATION CMU Stem Wall Reinforcement Anchor Bolts SLAB Non-structural CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page I of 3 r Building Pumit #02-049R-1 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected For Public Works inspection call 385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works approval must be 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. 8. All building permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspeMion per year to .keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3 Building Pemut #02-049 RE UIRED INSPECTIONS APPROVED/DATE FRAMING -Manufacturer's engineering by WA licensed engineer for sunroom shall be on-site at time of inspection Walls Treated Wood to Concrete Anchor Bolts & Washers Engineered Shear Walls Roof- engineered sheathing Rafter Positive Connection Attic Venting - eave and roof Window U-factor (existing house):.60 or better NFRC sticker shall be on windows, skylights & doors at time of inspection Safety Glazing Skylights - .58 or better Doors - .40 or better Fire Blocking Weather Resistive Barrier INSULATION Unheated space FINAL House Numbers - check for 5" numbers Smoke Detectors throughout existing house -battery powered okay in existing construction Final -building GENERAL CONDITIONS 1. Contractors working on this project are required to have s Labor & Industries contractor's r_pistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with Call 48 hours before you dig for utility line locates I-800-424-5555 Page 2 of 3 .. -. Building Permit #02-049 mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering. jnctuding nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection. prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final.inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A minimum of twenty-foam hours notice is required. Public Works approval must be 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. 8. All building permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. L0. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3