Loading...
HomeMy WebLinkAboutCity Projects Legenda Road Projects A. San Juan & 49`x` St. Improvements B. Discovery Rd. Sidewalks C. Water St. at NWMC D. Water St. -Monroe to Madison E. Madison St. to Memorial Stadium Tourism Infrastructure Projects J. Pope Marine Park & Building Up-grades K. Waterfront Esplanade L. Wave Gallery Relocation M. Visitor Plaza Conversion (Cotton Bldg.) Q Economic Strategy Infrastructure ~ Waterfront Partnership Investment F. Discovery Rd. & Howard St. Intersection N. Public Access Improvements G. Upper Sims Roundabout & Howard St. Extension H. Upper Sims - C1iffSt. to Thomas St. O Facility Improvements I. Upper Sims -Crosswalk at Hendricks St. O. Police Station Relocation & Fit-up Page 1 of 4 City Projects Legend Est. Costs Local $ Grant $ Roads and Streets (fill $ in Millions) (~-LID-ITB) (~~~ Fed} A. San Juan & 49th Street Improvements $ 1.70 $ - $ 0.09 Up-gade sprinklers, new roof; refwt»sh exterior, new windows. B. Discovery Road Sidewalks $ 0.45 $ - $ 0.15 Boardwalk, streetsrape and mill & o~~erlay street QiritxY to Madison C. Water Street at NWMC $ 1.13 $ - $ 0.61 Underground power, phone & cable for C, D & E. Nets SVJM system rrhain gardens, concrete roadway & paver streetscape w/twtb-outs D. Water Street - Monroe to Madison $ 0.50 $ - $ - New SWM w/rain garclens; streetscape wPoulb-outs, grind & pave E. Madison Street to Memorial Stadium $ 0.35 $ - $ - Retaining wall, curb inlets, strcxtsrape wlbtilbouts, overlay street TOTALS $ 4.13 $ - $ 0.85 Balance to Bond -- $ 3.28 Page 2 of 4 Est. Costs Local $ Grant $ Economic Strate Infrastructure (.All S in Millions) CIF LID TIB W'SDOT Federal F. Discovery Rd. & Howard St. Intersection $ 4.00 $ 0.40 $ 3.60 * $ - $ - $ - Roundabout and median strip, new roadway G. Upper Sims Circle & Howard St. Extension $ 3.20 $ 0.30 $ 2.60 * $ - $ - $ 0.30 Roundabout and median strip, new roadway H. Upper Sims -Cliff St. to Thomas St. $ 2.80 $ 0.30 $ - $ 2.00 $ - $ 0.50 Roundabout and median strip, new roadway I. Upper Sims - Crosswalk at Hendricks St. $ 0.10 $ - $ - $ - $ 0.10 $ - Signaliud crosswalk with median strip TOTALS $ 10.10 $ I.00 $ 6.20 $ 2.00 $ 0.10 $ 0.80 Balance to Bond --- ~ (0.00) *NOte: Additional WSDOT or Federal Economic Stimulus Funds, if wanted, will reduce the LID share Page 3 of 6 ~varEa srrt~er ~~ ,~ Fst. Costs Local $ Grant $ Tourism Infrastructure (All $ in Millions} (CIF LII}T1B) (WSDOT-Fed) G. Pope Marine Park & Building Up-grades $ 0.30 $ - $ - U~grade sgnnklers, uew'roo~ refurbish exterior, new windows. FI. Waterfront Esplanade $ 1.50 $ - $ - Boardwatk, stteetscape and null & overlay suet Quincy to Madison I. Wave Gallery Relocation $ 0.75 $ - $ 0.29 Relocate inland on footings & new piling J. Visitor Plaza Conversion (Cotton Bldg} $ 0.75 $ - $ 0.39 Seismic retrofit & renoti~ate TQTALS $ 3.30 $ - $ 0.68 Balance to Bond v $ 2.62 Page 4 of 6 ,_ _ ._: Waterfront Partnership Investment Est. Costs Local ~ Grant ~ (Al] $ in Millions) (CIF-LID-TIB) (WSDOT-Fed) N. Public Access Improvements $ 5.04 $ - $ - Pedestrian/ADAaccess to and including NWN1C Plaza 'i TQTALS ~ t.0o ~ - ~ Balance to Bond -- ~ 1.00 Page 5 of 6 Facility Improvements Est. Costs Local $ Grant $ (All $ in Millions) (CIF-LID-TIB) (WSDOT-Fed) O. Police Station Relocation $ 0.35 $ - $ - Fit up, grade existing bldg. fot Police Operations TOTALS $ o.3s $ - $ - Balance to Bond --- ~ 0.35 City Projects Slunmary Est. Costs IAII~in'_viill;ans, Local $ cC~.LI~T~B) GrAot $ ~,~~T-F~, Balance to Bona Road and Streets $ 4.13 $ - $ o.ss $ 3.2a Economic Stategy Infrastructure $ lo.lo $ 6.60 $ 3.so $ - Tourism Infrastructure $ 3.30 $ - $ o.6a $ 2.~0 Waterfront Partnership Investment $ l.oo $ - ~ - $ l.oo Facility Improvements ~ a.~s $ - $ - ~ 0.35 TOTALS $ 18.88 $ 6.60 $ 4.95 $ 7.33 Balance to Bond -- $ ~ 7.33 _ Page 6 of 6