Loading...
HomeMy WebLinkAboutBLD02-046.-' .k^- CITY OF PORT TOWNSEND Wetumen & Katz Building I n Quincy SuM, Suite 301 Pan Townsend, WA 98368 Plwne: (360)379-3206 Fu: (360)3814675 CONSTRUCTION PERMIT & INSPECTION RECORD I THIS CARD MUST BE POSTED AT CONSTRUCTION STTE Call 385-2294 for Inspection Permit Number: BLD02-0,46 Issued: 03-27-02 Parcel Number: 988 801 505 o!C p v¢Pt Job Address: 530 c Street Zoning: RR=1I Type: VV=N Occupancy: R_3 Nature of Work: Replace windows: build front deck Owner: Don Pendereast Contractor: L. D. Richert 301-0543 GENERAL CONDITIONS APPLY -SEE LAST PAGE RF.OiJiRF,D INSPECTIONS s APPROVED/DATE Wal1RAs LING ~ /907-~itt°S Z Deck -all members to be pressure treated or of t' 6 wood of natural resistance to decay Joists Posts & Beams C~~ ~~ ~~~ Q~~- //"//// Positive Connections 1 ~~ Steps Handrails Guardrails Landings Windows -safety glazing where applicable per attached details. Escape Windows -applicable in bedrooms if enlarging existing window sizes Window Ufactor - .65 or better NFRC window sticker must be on windows at inspection time Air Seal INSULATION Fill new wall cavit ~/ / `~ l ~ ©~ ~- f I ~~ ~~a~ ° y 7 DRYWALL NAILING Wall Ca1148 hours before you dig Tor utility line locates 1-800-424-5555 Page 1 of 2 ran «acnox-o5e- -,. _, K FINAL Smoke Detectors throughout house per 1997 • II Uniform Building Code; battery powered ~clSb-e.Ot x/24/ ©3 smoke detectors adequate in existing ~~ ~~ construction House Numbers -check for 5" high Deck St,.) Final -Building GENERAL CONDITIONS i 1. Contractors working on this project are required to have s Labor & Industries contractor's registration number and a Ciri business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspeMed prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during rnnstruction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced .wall panels (ABWP) require inspection prior to cover. 4: Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspeMion is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works anoroval must be received prior to scheduling the Building Department's final insuection. 7. Final InspeMions are required prior to occupancy; a Certificate of Occupancy is required for anon- residentialproject. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your bu~7ding permit active. 9. Revisions require submittal & approval prior to making changes in the field. ContaM the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 ~-