Loading...
HomeMy WebLinkAboutBLD02-045City of Port Toawend - Waterman 8c Katz)3uilding 181 Quinry Stred Suite 301 Pmt Townamd, WA98368 Phone (360) 379-3208 Fax (360) 383.7673 i • CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDO2-O45 Issued: 03/08/02 Parcel Number: 989 704 301 Job Address: WATER & MADISON Zoning: C-III Type: V_N Occupancy: B Nature of Work: Does AFoot-Lean-To / Temnorarv Structure Owner• John Sheehan 385-1708 ContraMor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMTTS REOUIItED° Electrical -Contact Labor & Industries @ 360-417-2702 REQUIRED INSPF.cTInNC A PDi2 n«n m ,- m>c ------- - w~1JY/LAlL' FRAMING FINAL Final Fire Department /// ~,/l~/~ 7 G C' Final Health Department . ` Finai-Building Department Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Permit #B1.D02-045 GENERAL CONDTTIONS 1. Contractors working on this project are required to Gave a Labor 8c Industries comractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (ace attached details). Adjacent rights-of-way shall be kept free of dirt debris. Sm7a exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Sos7s shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and akernate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. b. The Building Departmem is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works aonroval must be received prior to scheduline the Buitdin¢ Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non• residential project. 8, All building permits expire if no progress has been made within six momhs, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit. active. 9. Revisions require submittal and approval prior to making changes in tbe 5eld. Contact the Building Department (379-3208) prior to mating changes to the approved plans. 10. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS. Call 48 hours before yon dig for uts7ity line locates 1-800-424-5555 Page 2 of 2