CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD I
THIS CARD MUST BE POSTED AT CONSTRUCTION STTE
Call 385-2294 for Inspection
Permit Number: BLDOZ-044 Issued: 03/26/02 Parcel Number: 9321 400 001
Job Address: 830 Parkside Drive Zoning: RR=II Type: VV=N Occupancy: R-3
Total Occupant Load: add 1 Nature of Work: Convert attached saraee to heated living space fret room)
Owner: Robert Koenig Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
REQUIRED INSPECTIONS
APPROVED/D"9,TE
FLOOR FRAMING
Joists
SleepersBlocking
Shield under Joists
'Positive Connections
Treated Wood to Concrete
Vents ~~~ _)~~ j r
~J
PLUMBING
Rough-In (DWV & Clean outs) ~ //~~
~~~J/Q~ /~
Water Supply ~ 1.
Water Hammer Arrestor at washer
Pipe Insulation
Pressure Reduction Valve if > 80 psi
Water Heater
Seismic Straps
Pressure Relief Valve Drain to exterior
MECHANICAL
Heat Pump Ducting & Insulation
`)/~~~~
Bath Fan `
Utility Room Fan
Environmental Air Exhaust ducting (w/backdraft
damper), insulation (R-4) and termination (3 feet
from openings into building)
1
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 3
f
PamitMBI.DOt•W4
REQUIRED INSPECTIONS APPROVED/DATE
FRAMING:
Walls
Ceilings
~ ~,'~~~
Roof
Attic Venting - Q l/ISO if not existing
Window U-factor - .60 or better
NFRC sticker shall be on windows at time of
Inspection
Air Seal
Fireblocking
Weather Resistive Barrier
INSULATION
Floor (R-] 9)
Q /i
7~~~
Exterior Walls (R-19 )
Ceiling (R-~
Baffles
Vapor Barrier -faced Batts
DRY WALLNAII.ING /
7 /
Walls ~
/
~ j
/
/ /i
Ceiling (
FINAL
House Numbers -check for 5" numbers
Insulation Certificate
Smoke Detector throughout existing construction
PIumbing
Mechanical
Final -Building
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspeMed prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, eta Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is compkta
Applicant is responsible for protection of adjacent properties.
Call 48 hours before you dig for utility line locates
1-800-424-5555
1?age 2 of 3
Pmnil # BLD02-044
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit aMive.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
• Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3
_~
CITY OF PORT TOWNSEND
Watuman R KYZ Building
181 Quinry Suit, Suite 30I
Port TawtueoQ WA 98366
Plwtre: (360)379-3208 Fax: (36D)3795973
CONSTRUCTION PERMIT & INSPECTION RECORD I
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: $LDO2-O44R-1 Issued: 03/26/02 Parcel Number: 9321-400-001
Job Address: 830 Parkside Drive Zoning: RlII Type: VV=N Occupancy: U-1
Nature of Work: Construct 1200 so. ft. Garase/Shoo
Owner: Robert Koenie
Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RF.f1TTTRF.T) TNSPF.f'TTnNS
APPRnVED/DATE
TEMPORARY EROSION & SEDIMENT CONTROL
See General Condition No 2
FOOTING
Setbacks
~~/~~
Footings ~
Forms
Reinforcement
UFER
FOUNDATION
Stem Wall /~
~~~~OZ-- ~1~~
Forms ~
/
Reinforcement (
Anchor bolts w 2"x 2" x 3/16" washers
FRAMING
Engineered truss plan to be on-site at time of inspection
~~u~~~
~j
'
Walls ~
j/
Treated Wood to Concrete ~
(
Ceiling/Roof
Attic Venting ~y ~ ~~vS~i~ZT/~l
Blockin
~~ ~~~~ ~ f~~L S
g
Truss Positive Connection
~
~(~ 2i
Fireblocking ~`
Weather Resistive Barrier
Call 48 hours before you dig for utility line locates
- 1-800-424-5555
Page 1 of 2
.ti
Fkrmil8BU703.P0.8t-t
REQUIRED INSPECTIONS APPROVED/DATE
DRYWALL/NAILING (if applicable) i
Walls
Ceiling ~
'l//r~jry _
~" `-~
FINAL
Final -Building
GENERAL CONDITIONS
1. Contractors working on this project are regnired to have a Labor 8t Industries contractor's re¢istration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance. Adjacent rights-of-way shall be kept free of dirt & debris. Soils ezposed during
construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is
responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover. ,,
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required.
inspections.
5. Re-inspection is required after inspection report correMions are completed
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Pu61ic Works inspection ca11385-2294.
scheduling the Buildin¢ Department's final inspection.
7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to kcep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555