Permit Number: BLDO2-O38 Issued: 04/11/02 Parcel Number: 985-202-401
Job Address: 1614 Rosewood Street Zoning: RR=II Type: VV=N Occupancy: R-3
Total Occupant Load: 2 Nature of Work: Construct detached ADU
Owner: Christopher Africa Contractor: Same as Owner
GENERAL CONDTTIONS APPLY -SEE LAST PAGE
SEPARATE PERMTI'S REOUIItED:
Electrical -Contact Labor & Industries @ 360-417-2702
REOiTiRED INSPECTinNS
APPRnVF.D/1nATF.
TEMPORARY EROSION & SEDIMENT CONTROL
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS
Setbacks s~j~OZ
Footings
Forms
Reinforcement
Interior Footings
Po Piers
FOUNDATION
Stem Wail ~ / /}~
~~G/ d7i LJ/
Forms ( ((
Reinforcement
Anchor Bolts w/ 2" x 2" x 3/16" washers
Vents - 4 required
Crawl Access
Positive Connection Post-to-foundation wall
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 d' 4
&ulddgPamit N03-038 '
RE UIRED INSPECTIONS APPROVED/DATE
FLOOR FRAII~NG
Girder
Joists
Hydronic Tubing
Blocking
Positive Connection
Shield under Posts
Treated Wood to Concrete
Anchor Bolts & Washers
~~~ ~~rJ l/
l(( "`--~~~,,,
PLUMBING:
Rough-In (D-V-T & Clean outs) r
j~ ~~ ! ~ ~S' ~ L~ ,,.~„ry
vv
~ V /iC
Water Supply /
d
Water Hammer Arrestor at clothes and dishwasher G
~ [J
Gas Supply
Hose Bibs (bacldlow protection required)
Pipe Insulation (minimum R-3)
Pressure Reduction Valve if> 80 psi
Water Heater
Seismic Restraint - 2 places
Pressure relief valve drain to exterior, terminate I
6" - 24" above ground
LPG Boiler - mairufacturer's installation instructions sha
- 'te at time of inspection
Who a House Fan - - a m
Source SpeciSc Fans -Kitchen, Laundry, F-1 Bath
Environmental Air Exhaust ducting (w/ backdraft
dampers), insulation (R-4) and terminus (located 3'from
l
opening) G
~j~,-~ n//
C
Ca1148 boors before you dig for utility line locates
1-800-424-5555
Page 2 of 4
H~a~r~aozo3s
i
REQUIRED INSPECTIONS APPROVED/DATE
FRAMING
Walls /
~~`~ ~/
Ceilings
LC~
~~ ~D
Roof
Rafter Positive Connection
Attic Venting - @ ridge & eave
Windows -escape
Window safety glazing
Windows Ufactor - .65 or better
NFRC window sticker must be on windows and doors
at inspection time
Air Seal
Fresh Air -wall ports
Fire Blocking
Weather Resistive Barrier
INSULATION
Floor (R_19)
Walls (R-19)
~ !/
Ceiling (R_30) ;'
Baffles
Vapor Bamer: Face stapled backed Batts
DRY WALL NAILING
Walls
~~/s~o Z
Ceiling l
Enclosed Usable Space under Stairs
FINAL
LPG 1 ~ ~ 1
,L
(
House Numbers - 5" minimum ~
F
\
~l ~~
Plumbing
Mechanical/Heating
^
Insulation Certificate ~
~
Smoke Detectors
B
ildi
i J
~ a (~
ng
F
nal -
u r ~ 2
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
Build'ugramit #03-038
(~F.NERA_L. CONDITIONS
1. Contractors working on this project are required to Gave a Labor 8t Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result io job shut down while this is accomplished.
Z. Temporary erosion and sediment control (TESCj meuures shalt be installed on-site and inspected prior
to beginning construction; ca1138S2294. Meuures shall indude iostallstion of sik fencing and graveled
construction entrance (see attadu~ details). Adjacent rights-of-way shall be kept free of dirt debris. Soils
exposed during construction shall be temporan7y stabilized with mulching, plutic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering induding os~ling, holdowns, sheathing, and alternate braced wall panda
(ABWP) require inspection prior to rover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pus final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
7. F5na1 Inspections are required prior to occupancy; A Certificate o[ Occupancy is required for anon- •
residential project.
8. All building permits expire if no progress hu been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at lent one inspection per year to keep your
building permit active.
9. Revisions regwre submittal and approval urior to making changes in the field. Contact the Bm7ding
Department (379-3208) prior to mating changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line bcates
1-800.424-5555