Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BLD02-037
walam.a a Ktlz3)uildiog I81 Quincy StleA, Su3e 301 Pat Tawnamd, WA 98363 Phaoe: (360) 3793208 Fax: (360) 3657675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Neember: BLDO2-037R-1 Issued: 05/28/02 Parcel Number: 989 704109 Job Address: 825 Washington Street Zoning: C=III Type: VV=N Total Occupant Load: N/C Occupancy: R_1 Nature of Work: Revision #1: Install 2 beams to support oversoan roof rafters; remove beat pumps. Owners: Amell Family Limited Partnership Contractor- Owner **All elements of engineering require inspection prior to cover** GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUIIiED: Electrical -Contact Labor &.Industries Q 360-417-2702 See original permit BLD02-037 for other inspections. 'RE UIRED INSPECTIONS APPROVED/DATE FRAMING: Beams - 2 (two) 3-1/8 x 15 GLB -see attached ~~~~~~ engineering • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 ~.,~, 1. Contractors working on this project are required to have a Labor 8c Industries contractor's registration number and a City business license. Fadure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC~ measures shall be installed on-site and inspected prior to beginning construction; ca1138S2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached detasTs). Adjacent rigbts-of-way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and akernate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is amble to pass final inspection on your project until Public Works requirements Gave been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works aooroval must be received nrior to scheduling tbe Building DeoartmenYs final inscection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon- • residential project. 8. All building permits ezpire if no progress has bece made within sin months, or if no iaspectiom are done by the Building Department within one year. Call for at least o~ inspection per year to keep your building perroit active. 9. Revisions require submittal and approval urior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. ~I Ca1148 house before you dig for utility line locates 1-800-.424-5555 Page 2 of 2 City arPoR Townsend Weinman 8c Kah Building ' 181 Quincy Strati, PMTowmend, WA98368 ° (360)3'79-3208 Fez (360) 38i-7671 CITY OF PORT TOWNSEND i CONSTRUCTION PERMIT & INSPECTION RECORD TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD02-037 Issued: 03/18/02 Parcel Number: 989704109 Job Address: 825 Washin on Street Zoning: C-III .Type: VV=N Occupancy: RR=1 Total Occupant Load: NC Nature of Work: Remodel Hotel Units Owner: Amell Family Limited Partnershio Contractor: Same as Owner GENERAL CONDTfIONS APPLY -SEE LAST PAGE SEPARATE PERMTTS REOUIItED: Electrical -Contact Labor & Industries @ 360-417-2702 RE UIRED INSPECTIONS APPROVED/DATE DEMOLTTION All materials shall be deposited in the Jefferson County Landfill or in other areas off-site in accordance with all state and local laws PLUMBING Rough-In (D-V-T & Clean Outs) ~ ~, / ~//~~Z /} J V l~ C/J/ Water Supply Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi Water Heater Seismic Straps Pressure Reducing Valve Drain to exterior MECHANICAL Heat Pump - HSPF/COP D~rw/~'~ t^ `~ Ducts & Duct Insulation (supply and return air ducts R-8; ce R-4) ed s l i diti d t / L pa y n con on supp uc s G~ ©~~~~i(JAL E Bathroom Fans Environmental Air Exhaust ducting (with backdraft damper), insulation (R-4) and terminus (located 3' from openings) Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 S~ w BuBding Permit #BLDOYfn7 RE UIRED INSPECTIONS APPROVED/DATE FRAMING: Walls 9 Ceilings ~ /~i Headers ` Windows - no changes Air Seal Fire Blocking Weather Resistive Barrier INSULATION Wall (fill exposed exterior wall cavities) ~j/j,~~ Vapor Barrier required @ new exterior walls DRY WALL NAII.ING Walla ~/ ~10~ Ceiling FINAL Building Numbers -check for 5" numbers Plumbing Mechanical V. B. Paint Certificate (if applicable) Smoke Detectors throughout existing construction: one in each sleeping room and in each area/hallway leading to sleeping rooms with p minimum of one on eachloor Fins! -Building `/ Z Dv GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall 6e installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construMion entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. Ca1148 hours before you dig for utility line locates •~ 1-800-424-5555 Page 3 of 3 BuilBing Permit NBLD02-037 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspeMion is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspeMed. For Public Works inspection ca11385-2294_ 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. n LJ • Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 3 ,.; . s •