HomeMy WebLinkAboutBLD02-036waam®tXrLB~oWv~q
181 Qumry Strta, Suioe 301
Pat Towmmd, WA 98368
Phom: (360) 3793T08 Fmc (360) 385-7675
CITY OF PORT TOWNSEND
1 CONSTRUCTION PERMIT & INSPECTION RECORD I
I TffiS-CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for L-spectiou
Permit Number: BLD02-036 Issued: 03-08-02 Parcel Number: 988 801505
Job Address: 923 Ouincv Street Zoning: RR=II Type: V N Occupancy: R 3
Nature of Work: Replace all windows with Low-E windows. same size in eaistin¢ rough ooeninQS.
Owner: Mathew Caoriotti
385-1246
Contractor: Groves & Co. Inc.
GENERAL COND1'1'IONS APPLY -SEE LAST PAGE
REQUIRED INSPECTIONS APPROVED/DATE
•
•
FRANIING/FINAL:
Windows -safety glazing where applicable per ~ /0 ^ „
3 ~/ Jam-- `/
l~/
attached details. ~
Escape Windows -applicable in bedrooms if
enlarging existing window sizes
Window Ufactor - .40 or better (electric heat)
NFRC window sticker must bean
windows at inspection time
Air Seal
FINAL
Smoke Detectors throughout house per 1997 ~//~?i-
Uniform Building Code; battery powered
smoke detectors adequate in existing
construction
House Numbers -check for 5" high
Final -Building
Call 48 hours before you dig for utility line locates
1-800.424-5555
Page 1 of 2
GENERAL CONDITIONS
1. Co~ractors working on this project are required to have a Labor & Industries,contractor's re0stration •
n m and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; calf 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. 3oiis
ezposed daring construction shs0 be temporarily stabilized with mulching, plastic sheeting eta Soils
shall be permanently stabilaed with seeding, plantings, sodding, eta once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and elteroate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and.oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed
6. The Building Department is unable to,pass final inspection on your project until Public Works
requirements Gave been completed and inspeMed For Public Works inspection call 385-2294. A
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required for anon- •
residential project.
8. All building permits aspire if no progress has been made within sin months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active
9. Revisions require submittal & approval prior to making changes in the field. ContaM the Building
Department ~ 379-3208 prior to malting changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates •
1-800-424-5555
Page 2 of 2