Loading...
HomeMy WebLinkAboutBLD02-034Wntermnn & Kale BuBdi~ l81 Quinq Slreel, Sake 301 Porl7'ownwnd, WA 98369 PMonr. 368379-5086 Ba:366J89-7675 CITY OF PORT TOWNSEND • • CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD02-034R-3 Issued: 07/23/02 Parcel Number: 984901806 Job Address: 1175 Maple Street Zoning: RR=II Type: V_N Occupancy: RR=3 Total Occupant Load: 5 Nature of Work: Revision #3: Revised enaineerine for 10-12' Foundation stem wall Owner: Jens Coaaenrath Contractor: Same as Owner GENERAL CONDITIONS APPLY: See last uaee SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 REQUIRED INSPECTIONS APPROVED/DATE FOOTING/FOUNDATION Footing Reinforcement ~/~ Shear Key Engineered Stem Wall ~ Drain Rock Horizontal Reinforcement Vertical Reinforcement Waterproofing Anchor Bolts FINAL -see also original inspection record Final -building CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 2 Building Permit #02-034R-3 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is reauired. Public Works aouroval must be received prior to scheduling the Building Deaartment's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates • 1-800-424-5555 Page 2 of 2 Waterman & KNx Bu3ding 181 Qui^eY Street, Suite 331 Porl7ownaeod, WA 93363 Phone: 360379-5036 Pas 360J36-7675 CITY OF PORT TOWNSEND • CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD02-034R-2 Issued: 06/03/02 Parcel Number: 984901806 Job Address: 1175 Maole Street Zoning: R_H Type: VV=N Occupancy: RR=3 Total Occupant Load: 5 Nature of Work: Revision #2: Change heat source to aropane hvdronic floor heat Owner: Jens Copaenrath Contractor: Same as Owner GENERAL CONDITIONS APPLY: See last aaee SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 RF.f1TiTRF,11 TNSPT.(:TTONS APPROVED/DATE GROUNDWORK PLUMBING Pressure Test ~/y(~ /D~ Pipe Joints Exposed /l Pipe Bedding SLAB -see also original inspection record . R-10 under slab ~ ~~ ~~~-, ~ `~ Hydronic Tubing ` /// ~~~ FLOOR FRAMING -see also original inspection record Hydronic Tubing 1~7~Q1~ MECHANICAL -see also original inspection record Boiler -installation instructions shall be on-site at time of inspection CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 3 Building Permit #02-034R-2 REQUIRED INSPECTIONS APPROVED/DATE FRAMING -see also original inspection record Window U-factor - .45 or better NFRC sticker must be on windows at time of inspection INSULATION -see also original inspection record Slab (R 10 ) Walls (R-19 ) Ceiling (R-30 ) Baffles Vapor Barrier -paint FINAL -see also original inspection record Final -building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and -• inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall 6e kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 383-2294. A minimum of twenty-four hours notice is required. Public Works auoroval must be received nrior to schedulins the Building Deaartment's final insueMion. Ca1148 hours before you dig for utility line locates • 1-800-424-5555 Page 2 of 3 - Building Permit#02-034R-2 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits expire if no progress has been made within sia months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the .Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-4245555 Page 3 of 3 C~ W~twma tKa~ rPdldiq 181 QaLaey Slruy SuXe 38l Pul Tsnoend, WA 98368 Pl~~s: 36BJ79-5886 F~:360.385-~6'/5 r c CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THLS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD02-034R-1 Issued: 06/26/02 Parcel Number: 984901806 Job Address: 1175 Maale Street Zoning: RR=II Type: VV=N Occupancy: RR_3 Total Occupant Load: 5 Nature of Work: Revision #1: Revised engineered retaining wall Owner. Jens Conoenrath Contractor: Same as Owner GENERAL CONDITIONS APPLY: See last Wage SEPARATE PERMITS REOUII2ED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 lYQTE: Special lnspectton required for 3, 000 psi concrete per IIBC Section 1701. S Item 1. Special Inspector shall be a Washington licensed engineer or ICBO certified inspector. ICBO certified inspector to either be listed in the current edition of WABO ~ency and Inspector Register or present credentials to the Building Department prior to performing inspections. Required Special Inspection Reports shall indicate complia»ce with the plans and specifications and shall be copied to the Building Department in a timely manner. Permit Holder or Permit Holder's Agent shall review and oversee correction of any and all deficiencies noted by required special inspections. RF.OiiiRF.D iNFPF.CTiONS APPROVED/DATE FOOTINGS -per attached engineering Setbacks Footings -7~ // p/~ Forms / Reinforcement FOUNDATION -all elements of engineering require inspection prior to cover Stem Wall Forms Reinforcement CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 2 Building Permit NOZ-034R-1 GENERAL CONDITIONS i. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review. and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certit-icate of Occupancy is required for anon-residential project. 8. All building permits expire if no progress has been made within si: months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMTT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800=424-5555 Page 2 of 2 Waterman & Kam Huihlfng 181 Qufoq Stnet, Soke 301 Port Towuverd~ WA 98368 Phon<: 360-3795086 Fa:360J85-7676 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE CaI1385-2294 for Inspection Permit Number: BLDOZ-O34 Issued: 05/30/02 Parcel Number: 984901806 Job Address: 1175 Maule Street Zoning: RR=II Type: VV=N Occupancy: RR=3 Total Occupant Load: 5 Nature of Work: Construct Single-family Dwelling Owner: Jens Copaenrath Contractor: Same as Owner GENERAL CONDITIONS APPLY: See last Wage SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 RF.nTTTRFI) TNCPF.('TT(lNC APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL Per attached details. Inspection required. Graveled construction entrance required to prevent dirt and sediment from leaving the site FOOTINGS Setbacks Footings Forms Reinforcement Porch Piers LIFER FOUNDATION -all elements of engineering require inspection prior to cover Stem Wall Forms Reinforcement Anchor Bolts & Washers -per engineering Engineered Holdowns . CALL 48 hours before you dig Tor Utility line locates 1-800-424-5555 Page 1 of 4 Building Permit JIO'1-034 RF.niiiRF,n iNSPF,CTit7NS APPROVED/DATE SLAB - -- -- - - Turned Down Footing -per engineering Reinforcement Interior Footings Insulation Anchor Bolts -per engineering Engineered Holdowns FLOOR FRAMING lan on rite and in d BCI loor NOTE E ~ f p : ng eere available to the Inspector at inspection time l4~"'f J~ Joists Blocking Loft Floor Framing - DF #1 Engineered Floor Straps -MSTC 52 Positive Connections Concealed Connector, CJT3, to loft edge beam Treated Wood to Concrete Anchor Bolts & Washers PLUMBING Rough-In (D-V-T & Clean outs) / ~~d2o ~~~~ ~/~GG 0 ~ Water Supply Water Hammer Arrestor ~ ~ ~ ~ , I '~ 1 Q~~~Q,~ lM~ Gas Supply Hose Bibbs - backflow protection required Pipe Insulation (R-3) Pressure Reduction Valve if > 80 psi Water Heater R-10 under if electric Seismic Restraint - 2 places Pressure Relief Valve drain to exterior, terminate 6" -24" above ground MECHANICAL LPG Stove - provide specs on-site Whole house fan -Laundry room Source Specific Exhaust Fans @ bathrooms (SOcfm), kitchen (100 cfm) Environmental air exhaust ducting (with backdraft dampers), insulation (R-4) and terminus (3' from openings into building) i Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 V. • RE UIRED INSPECTIONS Building Prone il02-034 APPROVED/DATE FRAMING Walls Engineered shear walls (~ ~~j ~ /~ / /~ ~/ Shear Panel Blocking r Engineered Knee Braces -structural per engineered detail dated 4/18/02 Roof Rafter positive connection Attic venting -ridge & eave Posts, beams and headers Windows -escape Windows -safety glazing Window U-factor - .32 or better NFRC sticker must be on windows at time of inspection Air Seal Fresh Air Intake -window ports Fireblocking f~„ `~~ ( // Weather Resistive Barrier INSULATION ,~/O avCA/3 P/~o,L Floor (R-30 ) Walls (R-24 ) Ceiling (R-30) ~ ~7/~ (~ Baffles Vapor Barrier -paint DRYWALL NAILING walls l'O/~~9/B7~- Ceiling FINAL Public Works Sign-off LPG " L~6. ` numbers House Numbers - 5 Plumbing Mechanical Insulation Certificate `l//~~ ~ Z Vapor Barrier Paint Certificate ` /// Smoke Detectors Final -building • Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 3 of 4 y~ Buitding Permit N02-034 ~_ GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries ~v contractor's registration number and a City business .license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass Tinal inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works anaroval must be received arior to scheduline the Buildin¢ Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential .project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval grior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4