HomeMy WebLinkAboutBLD02-034Wntermnn & Kale BuBdi~
l81 Quinq Slreel, Sake 301
Porl7'ownwnd, WA 98369
PMonr. 368379-5086 Ba:366J89-7675
CITY OF PORT TOWNSEND
•
•
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD02-034R-3 Issued: 07/23/02 Parcel Number: 984901806
Job Address: 1175 Maple Street Zoning: RR=II Type: V_N Occupancy: RR=3
Total Occupant Load: 5 Nature of Work: Revision #3: Revised enaineerine for 10-12'
Foundation stem wall
Owner: Jens Coaaenrath Contractor: Same as Owner
GENERAL CONDITIONS APPLY: See last uaee
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
REQUIRED INSPECTIONS
APPROVED/DATE
FOOTING/FOUNDATION
Footing
Reinforcement ~/~
Shear Key
Engineered Stem Wall ~
Drain Rock
Horizontal Reinforcement
Vertical Reinforcement
Waterproofing
Anchor Bolts
FINAL -see also original inspection record
Final -building
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 2
Building Permit #02-034R-3
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is reauired. Public Works aouroval
must be received prior to scheduling the Building Deaartment's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates •
1-800-424-5555
Page 2 of 2
Waterman & KNx Bu3ding
181 Qui^eY Street, Suite 331
Porl7ownaeod, WA 93363
Phone: 360379-5036 Pas 360J36-7675
CITY OF PORT TOWNSEND
•
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD02-034R-2 Issued: 06/03/02 Parcel Number: 984901806
Job Address: 1175 Maole Street Zoning: R_H Type: VV=N Occupancy: RR=3
Total Occupant Load: 5 Nature of Work: Revision #2: Change heat source to aropane
hvdronic floor heat
Owner: Jens Copaenrath
Contractor: Same as Owner
GENERAL CONDITIONS APPLY: See last aaee
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
RF.f1TiTRF,11 TNSPT.(:TTONS
APPROVED/DATE
GROUNDWORK PLUMBING
Pressure Test ~/y(~ /D~
Pipe Joints Exposed /l
Pipe Bedding
SLAB -see also original inspection record .
R-10 under slab ~
~~ ~~~-,
~ `~
Hydronic Tubing `
/// ~~~
FLOOR FRAMING -see also original inspection record
Hydronic Tubing 1~7~Q1~
MECHANICAL -see also original inspection record
Boiler -installation instructions shall be on-site at
time of inspection
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 3
Building Permit #02-034R-2
REQUIRED INSPECTIONS
APPROVED/DATE
FRAMING -see also original inspection record
Window U-factor - .45 or better
NFRC sticker must be on windows at time of inspection
INSULATION -see also original inspection record
Slab (R 10 )
Walls (R-19 )
Ceiling (R-30 )
Baffles
Vapor Barrier -paint
FINAL -see also original inspection record
Final -building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries
contractor's re¢istration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and -•
inspected prior to beginning construction; ca11385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall 6e kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
383-2294. A minimum of twenty-four hours notice is required. Public Works auoroval
must be received nrior to schedulins the Building Deaartment's final insueMion.
Ca1148 hours before you dig for utility line locates •
1-800-424-5555
Page 2 of 3
- Building Permit#02-034R-2
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
8. All building permits expire if no progress has been made within sia months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the
.Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-4245555
Page 3 of 3
C~
W~twma tKa~ rPdldiq
181 QaLaey Slruy SuXe 38l
Pul Tsnoend, WA 98368
Pl~~s: 36BJ79-5886 F~:360.385-~6'/5
r
c
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THLS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD02-034R-1 Issued: 06/26/02 Parcel Number: 984901806
Job Address: 1175 Maale Street Zoning: RR=II Type: VV=N Occupancy: RR_3
Total Occupant Load: 5 Nature of Work: Revision #1: Revised engineered retaining wall
Owner. Jens Conoenrath Contractor: Same as Owner
GENERAL CONDITIONS APPLY: See last Wage
SEPARATE PERMITS REOUII2ED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
lYQTE: Special lnspectton required for 3, 000 psi concrete per IIBC Section 1701. S Item 1. Special
Inspector shall be a Washington licensed engineer or ICBO certified inspector. ICBO certified
inspector to either be listed in the current edition of WABO ~ency and Inspector Register or
present credentials to the Building Department prior to performing inspections. Required Special
Inspection Reports shall indicate complia»ce with the plans and specifications and shall be copied
to the Building Department in a timely manner. Permit Holder or Permit Holder's Agent shall
review and oversee correction of any and all deficiencies noted by required special inspections.
RF.OiiiRF.D iNFPF.CTiONS
APPROVED/DATE
FOOTINGS -per attached engineering
Setbacks
Footings -7~
// p/~
Forms /
Reinforcement
FOUNDATION -all elements of engineering
require inspection prior to cover
Stem Wall
Forms
Reinforcement
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 2
Building Permit NOZ-034R-1
GENERAL CONDITIONS
i. Contractors working on this project are required to have a Labor & Industries
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; ca11385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review. and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is required. Public Works approval
must be received prior to scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certit-icate of Occupancy is required
for anon-residential project.
8. All building permits expire if no progress has been made within si: months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMTT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800=424-5555
Page 2 of 2
Waterman & Kam Huihlfng
181 Qufoq Stnet, Soke 301
Port Towuverd~ WA 98368
Phon<: 360-3795086 Fa:360J85-7676
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
CaI1385-2294 for Inspection
Permit Number: BLDOZ-O34 Issued: 05/30/02 Parcel Number: 984901806
Job Address: 1175 Maule Street Zoning: RR=II Type: VV=N Occupancy: RR=3
Total Occupant Load: 5 Nature of Work: Construct Single-family Dwelling
Owner: Jens Copaenrath
Contractor: Same as Owner
GENERAL CONDITIONS APPLY: See last Wage
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
RF.nTTTRFI) TNCPF.('TT(lNC
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
Per attached details. Inspection required.
Graveled construction entrance required to prevent
dirt and sediment from leaving the site
FOOTINGS
Setbacks
Footings
Forms
Reinforcement
Porch Piers
LIFER
FOUNDATION -all elements of engineering
require inspection prior to cover
Stem Wall
Forms
Reinforcement
Anchor Bolts & Washers -per engineering
Engineered Holdowns
. CALL 48 hours before you dig Tor Utility line locates
1-800-424-5555
Page 1 of 4
Building Permit JIO'1-034
RF.niiiRF,n iNSPF,CTit7NS APPROVED/DATE
SLAB - -- -- - -
Turned Down Footing -per engineering
Reinforcement
Interior Footings
Insulation
Anchor Bolts -per engineering
Engineered Holdowns
FLOOR FRAMING
lan on
rite and
in
d BCI
loor
NOTE
E
~
f
p
:
ng
eere
available to the Inspector at inspection time l4~"'f J~
Joists
Blocking
Loft Floor Framing - DF #1
Engineered Floor Straps -MSTC 52
Positive Connections
Concealed Connector, CJT3, to loft edge beam
Treated Wood to Concrete
Anchor Bolts & Washers
PLUMBING
Rough-In (D-V-T & Clean outs) /
~~d2o ~~~~ ~/~GG 0 ~
Water Supply
Water Hammer Arrestor ~ ~ ~ ~ , I '~ 1 Q~~~Q,~
lM~
Gas Supply
Hose Bibbs - backflow protection required
Pipe Insulation (R-3)
Pressure Reduction Valve if > 80 psi
Water Heater
R-10 under if electric
Seismic Restraint - 2 places
Pressure Relief Valve drain to exterior, terminate
6" -24" above ground
MECHANICAL
LPG Stove - provide specs on-site
Whole house fan -Laundry room
Source Specific Exhaust Fans @ bathrooms (SOcfm),
kitchen (100 cfm)
Environmental air exhaust ducting (with backdraft
dampers), insulation (R-4) and terminus (3' from
openings into building)
i
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
V.
•
RE UIRED INSPECTIONS
Building Prone il02-034
APPROVED/DATE
FRAMING
Walls
Engineered shear walls
(~ ~~j ~ /~
/ /~
~/
Shear Panel Blocking r
Engineered Knee Braces -structural per engineered detail
dated 4/18/02
Roof
Rafter positive connection
Attic venting -ridge & eave
Posts, beams and headers
Windows -escape
Windows -safety glazing
Window U-factor - .32 or better
NFRC sticker must be on windows at time of inspection
Air Seal
Fresh Air Intake -window ports
Fireblocking
f~„ `~~
( //
Weather Resistive Barrier
INSULATION ,~/O avCA/3 P/~o,L
Floor (R-30 )
Walls (R-24 )
Ceiling (R-30)
~ ~7/~ (~
Baffles
Vapor Barrier -paint
DRYWALL NAILING
walls
l'O/~~9/B7~-
Ceiling
FINAL
Public Works Sign-off
LPG
" L~6. `
numbers
House Numbers - 5
Plumbing
Mechanical
Insulation Certificate `l//~~ ~ Z
Vapor Barrier Paint Certificate ` ///
Smoke Detectors
Final -building
• Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 3 of 4
y~
Buitding Permit N02-034 ~_
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries ~v
contractor's registration number and a City business .license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; ca11385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass Tinal inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is required. Public Works anaroval
must be received arior to scheduline the Buildin¢ Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential .project.
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval grior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4