Loading...
HomeMy WebLinkAboutBLD02-029Wate'mm & ICffiz B~tildmg 181 Quinry Stma, Suita301 Pat Taummd, WA 98368 Phata: (360379-3N16 Fax: (360)3857675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION STI'E Ca11 3 8 5-22 94 for Inspection Permit Number: BLD02-029 Issued: 03/04/02 Parcel Number: 948 327 605 Job Address: 1233 Sims Wav Zoning: CC=II Type: VV=N Occupancy: B Nature of Work: Build handicaooed accessible ramp at Grant Street/Sims Wav side of buildine. Owner: James Tavernakis Tenant: Geoffrey S. Masci. DC Contractor: MD Construction GENERAL CONDITIONS APPLY -SEE LAST PAGE RF.OiTiRF.D INSPECTIONS APPROVED/DATE LANDINGS - barrier free required Minimum 48" wide by 60" long. Changes in elevation not greater than''/2" Ramp not to have more than'/." per foot slope ACCESSIBLE ROUTE OF TRAVEL All ramps to meet i7BC Section 1108.5 Handrails FINAL Property address number Barrier Free (BF) Access One Barrier Free parking spaces required (Van Accessible) Final -Building Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Pawn #BLD02-029 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistratioy n r and a City business license. Faslure to provide proof of this documentation prior to work may resuh in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils ezposed daring construction shalt be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant ss responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. S. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and suspected. For Public Works inspection call 385-2294. Al minimum of twenty-four hours notice ss required. Public Works aooroval must be received nrior to • e..1.e.1..1:.... 11.s 11..:t.i:.... Tu..e.A...eM~e fnel :nenenk:nr 7. Final Inspections are requsred prior to ocnpancy; A Certsficate of Occupancy is required fora aon- residential project. 8. All building permits expire if no progress has been made within ssz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your budding permit actsve. 9. Revisions require submittal . & approval prior to malting changes in the field. Contact the Building Department Q 379-3208 prior to malting changes to the approved plans. 10. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS. Call 48 hours before you dig for nta7ity line locates 1-800.424-5555 Page 2 of 2