Loading...
HomeMy WebLinkAboutBLD02-026w.tamm ~ x~aw~ 161 Quiory 9hee4 S~tite 301 Pat Towmmd, WA 98368 Pnaw: (360) 3~9az0s Pax (360) 3es-76~s CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD02-026 Job Address: 41219 Street Issued: 2/27/02 Zoning: R-II Type: V=N Occupancy: RR=3 Nature of Work: Realace all windows with same size double-Dane vinyl windows. Recoof-aure bathroom ulumbina to chance tub to tub/shower unit. Owner: Bret Sukert Contractor: Owner (360)379-3103 GENERAL CONDITIONS APPLY -SEE LAST PAGE REQUIRED INSPECTIONS C~ APPROVED/DATE PLUMBING-Bathroom //fin ~ ~// Rough-In ~L r7 (~ ~(' Water Supply Pipe Insulation - R-3 Pressure Reduction Valve Required if> 80 psi Fireblocking FRAMING: Windows -safety glazing where applicable per /~~ ~ ~`',/'~!A'( ,~ -c~g~,~- attached details. Escape Windows -applicable in bedrooms if enlarging existing window sizes Window Ufactor - .40 or better (electric heat) NFRC window sticker must be on windows at inspection time Air Seal DRYWALL/NAII.ING Walls FINAL Smoke Detectors throughout; battery powered ~ 7 ~~~ Smoke Detectors adequate in existing ~ ~ construction / House Numbers -min. 5" high Final -Building Call 48 hours before you dig for utility Gne locates 1-800-424-5555 Page 1 of 2 Parcel Number: 948 302 402 C~~ 1. Contractors working on this project are required to have a Labor $ Industries co~rador's reeistrstion number and s City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of sik fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils ezposed daring construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, Plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of ~giueerkug including nailing, holdowns, sheathing, and aHernate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required alter inspection report corrections are completed. 6. The Buildwg Department is unable to pass final inspection on your project uffi7 Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A Final Inspections are required prior to occupancy; a Certificate of Occupancy is required for anon- residential project 8. All building permits ezpire if no progress has been made within siz months, or if no inspections arc done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to mating dumges in the field. Coated the Building Department (a3 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2