Loading...
HomeMy WebLinkAboutBLD02-023City 'Port Towneead Watamen & Katz Building 181 Quiocy.StreN, PaYfavncedl, WA98368 (360) 379-3208 Fu (360) 385-7673 CITY OF PORT TOWNSEND • CONSTRUCTION PERMIT & INSPECTION RECORD TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD02-023 Job Address: 1411 Willow Street Total Occupant Load: add 1/1 Owner: Hilda & Barrv Anderson Issued: 03/06/02 Parcel Number: 984903401 Zoning: RR=II Type: V_N Occupancy: R-3/U-1 Nature of Work: Residential Addition: ¢ara¢e & studio Contractor: Crai¢ Johnson 379-8594 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMTTS REOUIItED: Electrical -Contact Labor & Industries @ 360-417-2702 RE UIRED INSPECTIONS APPROVED/DATE EROSION CONTROL Sweeping of paved surfaces may be required to eliminate the tracking of dirt and debris onto City rights-of-way F gOTIN gS/SLAB- ~~ ~~ en neerin 3/l ~OZ Setbacks Footings Forms Reinforcement -per engineering Deck Footings LIFER FOUNDATION Stem Wall Forms Reinforcement -per engineering Anchor Bolts Engineered Holdowns Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 Building i'amit #BI.D04-0Yi « REOiJIRED iN~PEC'Ti[)NC eprunvF.Dtne~. FLOOR FRAMING - - - - -- - --- -- ---- BCI joist plan shall be on-site at time of inspeciion Joists Straps per engineering Blocking Shield under Posts Positive Connection Post-to-Beam (deck) Positive Connection Post-to-Pier (deck) Treated Wood to Concrete Anchor Bolts & Washers FRA119ING: Walls Engineered Shear Walls Engineered Floor Straps -MST 27 !~) "/ Attic Venting -ridge & eave -~ Ceilings Roof- Seismic Anchors, H-1 Posts, Beams and Headers Skylights Ufactor - .43 or better Windows Ufactor - .50 or better per talcs NFRC window sticker must be on windows, skylights & doors at inspection time Air Seal Door UFactor - .34 or better r / „ n Truss Positive Connection ~ ~~ t L / r // Fire Blocking 7 [ te/ Weather Resistive Barrier INSULATION ll R W 21/R 11 i i h , • ,~ LU ( - a - ng ex st ouse) Floor(R-'i0 ~/~~/~v (~J Ceiling (R-30) Ba®es Vapor Barrier: palm DRY WALL NAII.ING Walls ~~ / ~ /O 2 n / l / %/ Ceiling l ` ~ Garage House Occupancy Separation Call d8 hours before yon dig for utility line locates 1-800-424-5555 Page 2 of 3 ~J ~_ Buildmg Permit #BLD02-023 FINAL House Numbers -check for 5" numbers Smoke Detectors throughout existing construction: one in each sleeping room and in each area/hallway leading to sleeping rooms with a minimum of one ox each floor Final -Hooding ~/`2./J/~ GENERAL CONDITIONS 1. Contractors working on this project are required to Gave a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seed'wg, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your projeM until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. 7. Fumal Inspections are requved prior to occupancy; A Certificate of Occupancy is regwred for a non-residential project. 8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to malting changes in the field. Contact the Building Departmeut (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3