Loading...
HomeMy WebLinkAboutBLD02-019,. • WNamm a3CafzBuiiding I83 Quiay Shta, Suite 301 Pact Toaeaeod, WA 98368 pltana: (360) 3793108 Fix: (360) 385.7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDO2-O19 Issued: 02/28/02 Parcel Number: 972 600 701 Job Address: 1775 31st Street Zoning: RR=II Type: VV=N Total Occupant Load: 3 Occupancy: R-3 Nature of Work: Construct Single family residence Owner: John Needham CootraMor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMTI'S REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RF,OTTTRF,D INSPECTIONS • APPROVED/DATE TEMP EROSION & SDM'T CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site GROUNDWORK PLUMBING Pressure Test ~1~~/Oy Pipe joints Exposed Pipe Bedding Trap Seal Protection FooTINGS Setbacks 3/~~~ Footings Forms Reinforcement Porch Piers UFER Ca1148 hours before you dig for utility line locates I-800.424-5555 Page 1 of 4 Ps®IMBLDOL019 REQUIRED INSPECTIONS APPROVED/DATE F ATION R-10 Insulauo -- __ n n 3/~/D Z (~ _` Foans Reinforcement Anchor Bohs & Washers Alternate Braced Wall Panel Holdowns SLAB R-l0 Insulation ~I ~ /o ~l ~8 Radiant Heat Tubing Z ~,~/ Forms ?/~ -r~ ~/ Reinforcement / ~/ ~b Anchor Bolts PLUMBING: Rough-In (D-V-T & Clean outs) ~~/ ~ /~ n „ / / %/ Gas Supply ` 1 // '7 Water Supply Water Hammer Arrestor @ clothes and dishwasher Hose Bibs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve if > 80 psi Water Heater Seismic Restraint - 2 places Pressure relief valve drain to exterior, terminate 6" - 24" above ground MECHANICAL Boiler -installation instructions shall be on-site at , / /~~~ ` f ~/ time ojinspection l l LPG Fireplace Insert Whole House Fan Source Specific Fans Environmental Ait Exhaust ductutg (w/ backdnift dampers), insulation (R-4) and terminus (located 3' from opening) C CaA 48 hours before you dig for utility Gne locates I-800.424-5555 Page 2 of 4 ~~ ,1- RF.C1iTiRF.T1 iNCPF.f'TTnN5 1 APPROVED/DATE Permit#BLD02-019 --- G.--- -- - - - - - - JJa1Ss Alternate Braced Wall Panel ~~~~~ Headers Treated Wood to Concrete Ceiling/Roof Truss Positive Connection Roof Venting -ridge & eave Windows -escape Windows U-factor - .75 or better NFRC window sticker must be on windows and doors at inspection time Air Seal Fresh Air Intake (Window Ports) Doora U-factor - .40 or better Rire Blocking Weather Resistive Barrier CHIMNEY Termination SULATION /L o~ ails-(R=19) 7 ~/ ~y Ceiling - (R=30 ) Baffies Vapor Barrier: paint DRY WALL NAILING Walls (/,z~DZ- 2'~~ Ceiling FINAL L~ U.• rANa $ .~~ ~ 1 OZ Public Works Sign-Off House Numbers - 5"minimum Plumbing MechanicaUHeating Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors Final -Building ~ U~~/n~i , • Call 48 hours before you dig for utility liue locates 1-800-424-5555 Page 3 of 4 P®itMHLD02-019 ~; 1. Contractors working on this project are required to have a Labor Bc Industries contractor's registration num r and a City business fieense. Failure to provide proof of this documentation prior to work may result in job shut down wltile this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of s~7t fencing and graveled construction entrance (see attached details). Adjacent rights-o~way shall be kept free of dirt debris. Soils erposed daring construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stsbfiized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required suer inspection report corrections are completed. 6. The Bu~7diag Department is unable to pass final inspection on your project until Public Works requirements have been completcd and inspected. For Public Works inspection call 385-2294. A 7. Final Inspections are required prior to ocnpancy; A Certificate of Occupancy is required for anon- residential project. 8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before yon dig for utility line locates 1-800.424-5555 Page 4 of 4