Loading...
HomeMy WebLinkAboutBLD02-018IBI Qutnry StruA. Huth 381 PoA 1'owncecd, WA 98368 Phw~e: 360J793208F[[360JBi7673 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 far Inspection Permit Number: BLDO2-O18 Issued: 02/15/02 Parcel Number: 985-209-602 Job Address: 1633 Walnut Street Zoning: RR=II Type: VV=N Occupancy: RR=3 Total Occupant Load: add 1 Nature of Work: Sinele-family Residential Addition Owner: Stan Rubin/Judith Kitchen Contractor: Discovery Bav Construction GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUH2ED: Electrical -Contact Labor & Industries @ 360-417-2702 RF.CITTiRF.T1 TNSPF.C'Ti(1NS APPR(IVF;D/DATE TEMP EROSION & SEDIMENT CONTROL See General Condition #2 Silt Fence as needed Drive Off Mat as needed to prevent dirt and debris from being tracked onto City rights-of--way DEMOLITION Materials from demolition shall be deposited in areas off- site in accordance with all state and local codes FooTINGS jr~,d 3j~G~ Setbacks Footings Forms Reinforcement Interior Footings Porch Piers UFER Call 48 hours before you dig for utility line locates 1 1-800-424-5555 Page 1 of 4 PmMI #BiD02-0IS REQUIRED INSPECTIONS APPROVED/DATE FOUNDATION Stem Wall Forms Reinforcement Anchor Bolts w/ 2"~x 2" x 3/16" square washers Vents - IS required Crawl Access Beam Pockets Alternate braced wall panel (ABWP) holdowns @ garage door FLOOR FRAMING Girders Joists ~I V Blocking l Shield under Posts Positive Connection Girder to Concrete Beam Pockets Treated Wood to Concrete Anchor Bolts & Washers Foundation Vents - 3 required MECHAHICAL Electric Forced Air {~~'), 2l ~ Ducts & Duct Insulation -heating ducts in unconditioned , JI V-1 space: R-8 U • Ca1148 hours before you dig for utility line locates • I-800-424-5555 Page 2 of 4 Permil NBLD02-018 • RF.t7iTiRF.1) iNRPF.CTinNS APPROVED/DATE FRAMING Walls Roof -Engineered truss plan to be on-site at q ~~G ~a~ time of inspection Attic Venting -gable end & eave Ceilings Posts, beams & headers Windows Windows Ufactor - .33 & .42 or better per attached WATTSUN NFRC window sticker must be on Windows, skylights & doors at inspection time Air Seal Fresh Air Intake - (window; not required Skylights - .40 or better Doors Ufactor -.20 or better Truss/Rafter Positive Connection Fire Blocking Weather Resistive Barrier INSULATION Floor (R-30) ~~~U ~~~ Wall (R-15 & R-28 der attached WATTSUN) Ceiling (R-30 & R-49 per attached WATTSUN ) Bafltes Vapor Barrier: paint Crawl space - 6 mil black poly DRY WALL NAILING Walls qq ~~G~UZ- Ceiling FINAL House Number - 5"numbers ~j~ Plumbing ~ Insulation Certificate V. B. Paint Certificate Smoke Detectors throughout Final -Building /" • CaII 48 hours before you dig for utility line locates I-800-424-5555 Page 3 of 4 rya xacnsa-ois GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's I recistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; ea11 385-2 2 94. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt and debris. Soils eaposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. • 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH TIIE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4