Loading...
HomeMy WebLinkAboutBLD02-017w~tx,tzauatioq 3ai Amy st.en, sw~ 3ot Pat Towmeed, WA 98368 Phom:(360)379-37A8 Fex: (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD I TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD02-017 Issued: 2/13/02 Parcel Number: 989 710 006 Job Address: 504 Monroe Street Zoning: R II Type: V=N Occupancy: R 3 Nature of Work: Replace 2 windows and add 2 windows in livin¢ room. Owners: Sheila Christensen and Jerrv Mingo Contractor: Same as Owner 385-7509 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUIItED: Electrical -Contact Labor & Industries @ 360-417-2702 RE UIRED INSPECTIONS APPROVED/DATE FRAMING ` // /yJ Electrical inspection required prior to framing ~ J/ ! ~ ~fZ/ Walls r Windows Window Ufactor - .40 or better (electric heat) NFRC window sticker must be on windows at inspection time Air Seal Window Safety Glazsng .INSULATION .Fill Wall Cavities _ /~_ ~ l DRYWALL NAILING ~/~.~/~ Walls // FINAL Smoke Detectors throughout house per 1997 d if B ildi C d b U attery powere n orm u ng o e; smoke detectors adequate in existing / /1~~ ~~ C/ construction House Numbers -check for 5" high Final -Building Cali 48 hours before you dig for utility tine locates 1-800-424-5555 Page 1 of 2 Pa®t ABLDOY017 GENERAL CONDTfIONS 1. Contractors working on this project are required to 6sve a Labor elk Industries contractor's registration nwaber and a City business license. Fa~7ure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (ace attached details). Adjacent rights-of-way shsU be kept frce of dirt debris. Soils ezpoaed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering includwg nailing, 6oldowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shalt review and oversce correction of any and all deficienties noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final mspeMion on your project until Public Works requirements have been completed and inspected. For Public Works inspection cs11385-2294. ~ minimum of twenty-four hours notice is reauired. Public Works annroval must be received prior to scheduling the Building Department's final insuection. 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non- residential project. 8. All bw7ding permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least oae inspection per year to keep your building permit active. 9. Revisions require submittal 8c approval prior to malting changes in the field. Contact the Building Department [~ 379-3208 prior to making changes to the approved phms. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before yon dig for utility line locates 1-800.424-5555 Page 2 of 2