Loading...
HomeMy WebLinkAboutBLD02-016 CiTy of Port Towmarnd/BCD Waterman & Katz Building -- 181 Quincy Sueet Suite 301 Port Townsend, WA 98368 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO2-O16 Issued: 04/22/02 Parcel Number: 931402902 Job Address: 650 B Street Zoning: R-11 Type: VV=N Occupancy: R-3/U-1 Total Occupant Load: 5/2 Nature of Work: New SFR with attached earage Owner: Kit Kna /Kna Famil Trust Robert L. Kna Contractor: L. D. Richert (301-0543) GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RFnTTTRF.TI TNCPF.(`TT(1NC APPRnVF'T)/nATF. TEMPORARY EROSION & SEDIMENT CONTROL See SDPOI-064 and General Condition #2 FOOTINGS Setbacks ~2/d~ Footings Forms Reinforcement Porch Footings LIFER FOUNDATION Stem Wall 5 j © Forms ~ ~ ~ l Reinforcement Anchor Bolts - 5/8" w/ 2" x 2" x 3/16" square washer Engineered Holdowns Vents Crawl Access SLAB @ garage Reinforcement - #3 bar @ 12" o.c. grid R-10 interior to stem wall . Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 Pmnil # BI.I)02-016 REQUIRED INSPECTIONS .-- - APPROVED/DATE FLOOR FRAMING Joists - engineered joist plan shall be on-site at time of inspection Cripple Walls Blocking Shield under Posts ((a~ posts) Positive Connections r Treated Wood to Concrete ,1'/zQIQL Anchor Bolts & Washers ~ PLUMBING Rough-In (D-V-T & Clean Outs) Water Suppty pwU ~ w S ~ZO~©z , Hydronic Tubing Gas Supply Hose Bibs Pipe Insulation (R-3) Pressure Reduction Valve if pressure > 80psi Water Heater Seismic Restraint Pressure Relief Valve Drain to exterior, 6" -24" above grade AL Boiler -Marmfacturer's Installation Inst bons on-site Q time of inspection PG F`irepFase-_ Source pecllc ans Whole House Fan Environmental Air Exhaust ducting, insulation g ~/~ ~ and terminus FRAMING: Walls Engineered Shear Walls ~q ~OL n Sheathing Q Cripple Walls `~7 ~/ Roof- engineered truss plan shall be on-site at time of inspection Truss Positive Connection Blocking Attic Venting - soffit & ridge Ceilings Posts, beams & headers Windows -escape Windows -safety glazing C Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 Permit # BLD02-016 RF,OTTTRF.11 TNSPF.CTIONS APPROVED/DATE FRAMING (continued) Windows Ufactor - .45 or better NFRC window sticker must be on Door U-factor - .40 Air Seal Fresh Air (wall ports) Fire Blocking Weather Resistive Barrier INSULATION Floor (R-25) ~~ 3/~Z (~~ Wall (R-19) Cr "// Ceiling (R-30) ! ; Baffles Vapor Barrier: paint 6 mil black poly in crawl space DRY WALL NAILING Walls n/~DL r(/ Ceiling Garage/House Occupancy Sepazation FINAL House Number -check for 5" numbers at final [Jr~ T/Iti/~-- ~ f /,t~GT ~G p~O LPG / Plumbing Mechanical Insulation Certificate p ~j~ I Vapor Barrier Paint Certificate ~, ~ I ~ I C~ Smoke Detectors throughout 4 ~, L Final -Building rD GENERAL CONDITIONS I. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 Pamil # BI.D02-016 r 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall pa11e)s (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3; a minimum of twenty-four hours notice is required Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits ezpire if no progress has been made within sia months, or if no inspeMions are done by the Building Department within one year. Call for at least one inspection per year to keep your bµilding permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. U Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4