Permit Number:: BLDO2-O15 Issued: 02/12/02 Parcel Number: 948316501
Job Address: 1704 Discovery Road Zoning: RR=II Type: VV=N Occupancy: AA=3
Occupant Load: NC Nature of Work: Construct community meeting hall: foundation work
Owner: San Juan Bautist Church
Contractor: Clearwater Construction
(301-1577)
GENERAL CONDTTIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
REQUIRED INSPECTIONS
APPROVED/DATE
DEMOLITION
Materials from demolition shall be disposed of in the
Jefferson County Landfill or other approved areas
off-site
FOOTINGS
Pier Footings
~~~~ ~~/
~~"7 ~L /,J/~
(%'
Treated Posts
Positive Connection Pier to Post
Positive Connection Post to Beam
WFRAmmvG: ~~.•-r~~~. i,~~cz. (~ Z,~~~f~"~
Ceilings
Posts, beams & headers
Doors
~~~_
/~~~~/OZ
c ~
~Q
f
Thresholds -'h"Barrier Free Design
Direction of Swing
Panic Hardware
Lever Hardware
Approach
P®itlFBi.D07-015
REOIJIRED INSPECTIONS APPR(1VF.n/nATF.
DRY WALL NAILING - - - 1lOJf~i IQO~^^' 3 /rOZ --
Walls
Ceiling I
lI
~g~/~ '~lI ZrOL
I
FINAL
Fire Department sign-off
Electrical (L&I) sign-off
Property address
Barrier Free Access
Final -Building / // / /~~
~Z Jam/ ~ ~ / //
GENERAL CONDITIONS
1. Contractor working an this project are required to have a Labor & Industries contractor's registration number
and a L'itY business license. Failure to provide proof of this documentation prior to work may result in job shut
down while this is accompiis6ed.
2. Temporary erosion and sediment control (1'ESC) measures shall be installed oo-site and inspected prior to
beginning construction; call 385-2294. Measnrea shall include installation of silt fencing and graveled construction
entrance (see attached details). Adjacent rights-of-way shall be kept fm of dirt debris Soils exposed during
construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently
stabilized with seeding, plantings, sodding, etc. once construction is complcte. Applicant is responsible for
protection of adjacent properties
3. All elements of engineering including nailing, holdowas, sheathing, and akeroate braced wall panels (ABWP)
require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted 6y required
inspections
S. Re-iuapectfon is required after inspectlon report corrections are completed.
6. The Building Department is unable to pass final inspection on your projeM until Public Works requirements have
bees completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-font 6onra notk
7. Ffasl Inspections are required prior to occupancy; A Certificate of Occupancyu required for anon-residential
Pr'oje~
8. All building permits expire if no progress has been made within siz months, or if no inspections are done by the
Building Department within one year. CaD for at kart one inspection per year to keep your building permit active,
9. Revisions require submittal & approval prior to making changes in the field. ComaM the Building Department ~
379-3208 prior to making changes to the approved plena