HomeMy WebLinkAboutBLD02-010W ataman ~ Katz 73~rildivg
181 Quio% Steat, Suite 301
Yart Towmend WA 98368
Phone: (360) 379-3208 Fac (360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD02-010 Issued: 01/15/02 Parcel Number: 985 209 802
Job Address: 219 O Street Zoning: RR=II Type: VV=N Occupancy: RR^3
Nature of Work: Remove existing cedar roofing on house. install sheeting. felt and comaosition
shingles. and urovide adequate ventilation.
Owner: Townsend Bav Property Management
GENERAL CONDTI'IONS APPLY -SEE LAST PAGE
Contractor: Houe Roofing
(385-5653)
RE UIRED INSPECTIONS
APPROVED/DATE
DEMOLITION
All construction debris to be deposited in Jefferson
County Landfill or other location in accordance with
all local, state and federal laws.
SHEATHING
Nailing requires 8d @ 6" o.c. edges & 12" o.c. field or
13/4" staples @ 6" o.c. edges and field.
ROOF VENTING
Midge Vents
Net free ventilation azea shall not be less than 1 squaze
foot per 150 squaze feet of the area of the space
ventilated, unless 50% of the required vent opening
area is provided in the upper portion of the roof and
therefore the rate may be reduced to 1 squaze foot of
venting to 300 square feet of area vented. Openings
shall be covered with corrosion resistant'/." mesh.
ROOFING
Install all roofing material per manufacturer's
specifications and UBC Chapter I5.
~~ Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
r~,auaLVOS-ono
FINAL
Smoke detectors required per 1997 UBC (battery
powered OK)
House Numbers - 5" numbers of contrasting color
posted near main entrance of house and visible from
street per City Ordinance
Final -Building
1. Contractors working on this project are required to have a Labor Industries contractor's res!istration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. If temporary erosion and sediment control (TESC) measures are required, they shall be installed on-site
and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt
fencing and graveled construction entrance {see attached details). Adjacent rights-of-way shall be kept
free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection. of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass fmal inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twenty-four hours notice is required. Public Works aonroval must be received prior to
scheduling the Buildine Department's final inscection.
I5ns1 Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non-
residential projeM.
8. All building permits expire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal 8c approval prior to making changes in the field. Contact the Building
Department Q 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800.424-5555
Page 2 of 2