Loading...
HomeMy WebLinkAboutBLD02-007Watemm~ d KatzBuiiding 187 Quiory Sheet, 3uib 301 Pat Taxmmd, WA 98368 Phone: (360) 379-3208 Pex: (360j 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERNIIT & INSPECTION RECORD TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE CsJ1385-2294 for Inspection Permit Number: BLD02-007R-1 Issued: 04/17/02 Parcel Number: 952 700 012 Job Address: 12 Kanu Drive 2,oning: RR=II Type: VV=N Occupancy: R-3 Nature of Work: Revision #1: Apartment section to be slab -chanced from crawl space. Occupant Load: NA Owners: Richard and Carla Sloat Contractor: Cranston Construction (301-2390). GENERAL CONDITIONS APPLY -SEE LAST PAGE See Original Permit BLD02-007 for other inspections. RF.niTiRF.TI iNCPF,(:TinN~ APPROVED/DATE SLAB - noo-structural R-10 Insulation ®perimeter GROUNDWORK PLUMBING Pressure Test ~zZ~~7Z Pipe Joints Exposed Pipe Bedding Trap Seal Protection (if applicable) • GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; caR 3852294. Measures shall include installation of silt fencing and graveled construction entrance. Adjacent rights-ot-way shall be kept free of dirt 8c debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, eta Soils shall be permanently stabilized with seeding, plantings, sodding, eta once construction is complete. Applicant is responsible for protection of sdjsceut properties. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 ~.8~~., 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. • 6. The Bnildwg Department is unable to pau final inspection on your project until Public Works requirements Gave been completed and inspected. For Public Works inspection call 3852294. ~ 7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required for a noo- residential project. 8. All building permits ezpire if no progress 6aa been made within siz months, or if no inspections are done by the Building Department within oa year. Call for at least one inspection per year to keep your bu~7ding permit active. 9. Revisions require review and approval prior to making changes in the field Contact the Building Department at 379-320ti prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Ca1148 hours before you dig for utility line locates i-800.424-5555 Page 2 of 2 CITY OF PORT TOWNSEND _~~,,~, CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE CaI1385-2294 for Inspection Permit Number: BLDO2-OO7 Issued: 2/11/02 Parcel Number: 952700012 Job Address: 12 Kanu Drive Zoning: RR=II Type: VV^N Occupancy: R-3 Total Occupant Load: 8 Nature of Work: Construct sinele-family residence & ADU with attached gara¢e Owner: Richard & Carla Sloat Contractor: Cranston Construction (732-7208) GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUIItED: Electrical -Contact Labor & Industries @ 360-417-2702 ~RE UIRED INSPECTIONS ~~~;,~r ~ro -eSS Yu ~~~ w~rom a xrzaetm~ iai ~ seuc sera 3m Fat Tawmmq wn 9s36s Fhone: (3b0) 3793206 Fm[ (360) 385-7673 ~ ~Ue~ ~ '.G /~~G~ ~~Z~l ~ r/l)'~P C-~~ ~-~2-763 ~ ~ L I~ ca7~~l~; APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL See General Condition No. Z Silt Fence Drive Off Mat to restrict sediment from leaving the site FOOTINGS Setbacks ~~ ~ 0y Footings Forms Reinforcement Interior Footings Porch Piers ~~ . Ca1148 hours before you dig for utility line locates _ 1-800-424-5555 Page 1 of 4 Pal%BYJD1.W1 ~ REQUIRED INSPECTIONS APPROVED/DATE FOUNDATION Stem Wall Forms ~~~ 7/ ~ j/ Reinforcement "~~~~ Beare Pockets Mchor Bolts w/ 2" x 2" x 3/16" washers EngineeredHoldowru Foundation Vents -19 required Crawl Space Access FLOOR FRA110NG Girders Joists -engineered BCI floor joist plan to be on site at /)n ~/ ~~ / ~ Z L,f / time of inspection. Blocking Shield under Posts Positive Connection Girder to Concrete Beam Pockets Treated Wood to Concrete Mchor Bolts w/ 2" x 2"x 3/16" washers Crawl Space Access PLUMBING: Rough-In (D-V-T & Clean outs) Water Supply ~~~ /I ~ T/ / ~j n 1j~~1Z/(ry~ ~"f/ Y' l Water Hammer Arrestor @ clothes and dishwasher Hose Bibs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi Water Heater R-10 pad @ garage Seismic Restraint - 2 places Pressure relief valve drain to exterior, terminate 6" - 24" above ground od F'>replace o e use an -Bathrooms Source Specific Fans in laundry, kitchens, baths Environmental Arr Exhaust ducting (w/ backdraft ), insulation (R-4) and terminus (located 3'from . am d 7 /~ /~ ~ p e ng) ~~! Call 48 6ooro before you dig for utility line locates 1-800-424-5555 Page 2 of 4 ~~.~~, RE UIRED INSPECTIONS APPROVED/DATE FRANIING -1-hour construction between dwellixg units alls Engineered Shear Walls ~~l Ceilings U ~y Roof - E»gi»eered Roof Sheathing Truss Positive Connection Attic Verning -ridge & eave Windows -escape Window safety glazing Windows Ufactor - .43 or better. NFRC window sticker must be on windows, doors (.20 or better) & skylights at inspection time Air Seal Fresh AirIntake (Window Ports) Doors U-Factor - .20 or better Fire Blocking Weather Resistive Barrier Damproo8ng f~~ C,~' ((( CHIlI4NEY Termination Spark Arrestor Walls (R=19) Ceiling (R-30/R-38 @ scissor truss Baffies Vapor Barrier: paint ~ Crawl space - 6 mil black poly / f 7~~ l/ DRY WALL NAII.ING Walls ~ ~ Ceiling ~ ~~ Garage/House Occupancy Separation 1-hour construction between dwelling units Engineered Interior Braced R'all Panels L Cal148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 r~~m, FINAL Public Works Sign-Off House Numbers Plumbing Mechanical/Heating Insulation Certificate Vapor Barrier Paint. Certificate Smoke Detectors Final -Building 1. Contractors workiag on this project are required to have a Labor & Industries contractor's registration num a and a City business Ucense. FaUure to provide proof of this documentation prior to work may resuh in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to begiming construction; call 3852294. Measures shall inclade installation of silt fencing and graveled construction entrance (see attached dets~7s). Adjacent rights-of-way shall be kept frce of dirt debris. Soils ezposed during construction stall be temporarily stabUized with mulching, plastic sheeting, etc. Sous shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. AU elements of engineering including na~7ing, 6oldowns, sheathing, and shegaate braced wall panels. (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by regaired inspections. 5. Re-inspection is required after inspection ceport corrections are completed. 6. The Building Department is unable to pass final inspection on your project mtil Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. ~ minimum of twenty-four hours notice is required Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections arc required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. , 8. AU buUding permits erpire if no progress has been made within sa months, or if no inspections are done by the Bw7ding Department within o~ year. Call for at lost one inspection per year to keep your buildwg permit active. 9. Revisions require submittal and approval prior to mskipg changes in the field. Contact the Building Departmwt (379-32~) prior to making changes to the approved plans. 10. POST THIS PERMIT ON SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 , Page 4 of 4 Public works sign-off ~. _ ~ ~~'i? ~O 3 House Numbers ; Plumbing Mechanical/fleating Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors Final -Building ~«, 1. Contractors working on this projeM are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shat down while this is accomplished. 2. Temporary erosion and sediment co~rol (TESL} measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details}. Adjacent rights-of--way shall be kept free.of dirt debris. Soils exposed during construction shall be temporar~7y stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any sod all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Bu~7ding Department is enable to pass final inspection on your projeM until Public Works requirements have been completed and inspected. For Public Works inspection cst1385-2294. A 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fors non- residential project. 8. All bw7ding permits expire if no progress has been made within siz months, or if no inspections are done by the Bu~7ding Department within one year. Calf for at least one inspection per year to keep your 6m7ding permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Bu>Zding Department (399-3208) prior to making changes to the approved plans. 10. POST TffiS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before yon dig for utility line locates 1-800-424-5555 Page 4 of 4 u