CITY OF PORT 'TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 Tor Inspection
Wefaman & KsKH~rild~
1 BI Quimy Street, Suite 301
Pat 7owmmd, WA 98366
Phone: (360) 3793208 Faz: (360) 386.7675
Permit Number: BL,DOZ-0~6 Issued: 1/31/02 Parcel Number: 933200027
Job Address: 1226 Garfield Street Zoning: RR-H Type: VV=N Occupancy: R-3
Total Occupant Load: 6 Nature of Work: Construct sinele-family residence
Owner: Ian Keith Contractor: Same as Owner
NOTE: Rastra work to be done by certified
RASTRA of AMERICA contractors
GENERAL CONDTTIONS APPLY -SEE LAST PAGE
SEPARATE PERMTI'S REOUH2ED:
Electrical -Contact Labor & Industries @ 360-417-2702
•
REQUIRED INSPECTIONS
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS
Setbacks ~/f
~~~ZI~L(~
Footings ((
Forms
Reinforcement
Interior Footings
Porch Piers
UFER
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
.'°_ _ °_
«B~m~
RE UIRED INSPECTIONS APPROVED/DATE
FOUNDATION - RASTRA WALLS
Stem Wall
Forms „ j
~,J ~, ~ ,
Reinforcement -per engineering #4 @ 15" o.c. horiz; #5 f;~
l
~°
8 j
@ 15" o.c. vertical (
/
Anchor Bolts w/ 2" x 2" x 3/16" washers
Engineered Holdowns
SLAB
Reinforcement
Interior Footing
7~Z ~~~ ~
r%
Engineered Holdown @ interior footing
FLOOR FRAMING
Floor Girders
Joists - engineered BCI floor joist plan to be on site at
~ -~ ,
time of inspection.
Blocking
Positive Connection
-~jb
Treated Wood to Concrete
Anchor Bolts w/ 2" x 2"x 3/16" washers ~ \ G~ _ (-~-~
1 Ll
PLUMBING:
Roug i- n - - Ctean outs)
Water Supply /~
~~ , 'Rpb ~ ,
Water Hammer Arrestor @ clothes and dishwasher
~ - ` ~ - ~ Z
ose Bibs (backflow protection required}
PipeInsulation (R-3)
Pressure Reduction Valve if> 80 psi
Water Heater
Seismic Restraint - 2 places
Pressure relief valve drain to exterior, terminate
6" - 24" above ground
R-10 under
MECHANICAL
Whole House Fan -Bathroom
Source Specific Fans in laundry azea and kitchen
Em+ironmental Air Exhaust ducting (w/ backdraft
dampers), insulation (R-4) and terminus (located 3'from
opening)
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
Permit N BLD02-006
REQUIRED INSPECTIONS APPROVED/DATE
FRAMING
walls
Ceilings
Roof- engineered truss & BCI rafter plans must be
on-site at time of inspection
Truss/Rafter Positive Connections
Attic Venting -ridge & eave
Windows -escape
Window safety glazing
Windows Ufactor - .39 or better.
NFRC window sticker must be on windows
at inspection time
Air Seal
Fresh Air Intake (Window Ports)
Doors U-Factor - .20 or better
Fire Blocking
Weather Resistive Bamer
INSULATION
Floor (NA -basement is heated)
~Q//,{~/~
Walls (R=21)
Ceiling (R=30 vault )
Baffles
Vapor Bamer: paint
Crawl space - 6 mil black poly
DRY WALL NAILING
Walls /~Ll~~
Ceiling
Encloo,saed Usable Space under Stairs --
~
r
~
'er . - --
~
~'
.
~~,.. ~
'~'
~, r, ~-" ..e ~
_ ~
~
FINAL D
(~~G ~q/~ ~6 ~~ IZ~Z ~UL
Public Works Sign-Off /
House Numbers - 5" minimum
Plumbing
Mechanical/Heating
Insulation Certificate
Vapor Barrier Paint Certificate
Smoke Detectors
Final -Building
Ca1148 hours before you dig for utility line locates
I-800.424-5555
Page 3 of 4
Permit # HLD02-006
f3F.NFRAi. C'ONDTITONS
1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca1138S2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils
exposed during construMion shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construMion is complete.
Applicant is responsible for protection of adjscentproperties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 382294. A
minimum of twenty-four hours notice is required. Public Works aoaroval must be received prior to
scheduline the Buildin¢ DeuartmenPs final insoection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-
residential project.
8. All building permits expire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval rior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST TffiS PERMTT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555