HomeMy WebLinkAboutBLD02-004walem,an ~ xaa Puiiaio8
181 Quincy St, Suite 301
PortTowreend, WA98368
Plwne (360) 379.3208 Fax: (360) 385-7675
•
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD02-004 Issued: 01/23/02 Parcel Number: 999 300 005
Job Address: 5005 Hendricks Street Zoning: RR=II Type: N/C Occupancy: N/C
Total Occupant Load: No Change Nature of Work: Replace rafters and roof of storage building
Owner: Dean Lebens
Contractor: Same as owner
GENERAL CONDTTIONS APPLY -SEE LAST PAGE
REQUIRED INSPECTIONS
APPROVED/DATE
DEMOLITION
All construction debris to be deposited in 7efferson
County Landfill per plans or other location in
accordance with all local, state and federal laws.
ROOF VENTING (Applicable if enclosed attic space)
Net free ventilating area shall not be less than 1 square
foot per 150 square feet of the azea of the space
ventilated, unless 50% of the required vent opening area
is provided in the upper portion of the roof and therefore
the rate may be reduced to 1 squaze foot of venting to
300 square feet of area vented. Openings shall be
covered with corrosion resistant'/." mesh.
ROOFING
Install all roofing materials per manufacturer's
specifications and UBC Chapter 15.
Calf 48 hours before you dig for utility line locates
I-800-424-5555
Page 1 of 2
Pamil #BLD01-W4
FRAMING/FINAL
Rafters
Rafter Ties
Blocking
Positive Connection
Sheathing
Check for 5" House Numbers
Final -Building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
r~istration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294. Measures shag include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall pane
(ABWP) require inspection prior to cover.
4. Owner or owner's agem shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspeMion report corrections are completed.
6. The Building Department is unable to pass final inspection on your project untilPubGcWorks
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-
residential project.
8. All building permits expire if no progress has been made within siz months, or N no inspections are
done by the Building Departmeut within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department Q 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800.424-5555
Page 2 of 2