Loading...
HomeMy WebLinkAboutBLD02-002~'"." wnterman & xtr aollding ese Qway sere, snn.3se Port Towwend, WA 98368 Phone: 360J79J208 Faa360385-7678 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: $LDUZ-U~2 Issued: 01/22/02 Parcel Number: 948 310105 Job Address: 1114 Grant Street Zoning: R-II Type: VV=N Occupancy: R_3 Total Occupant Load: 4 Nature of Work: Remove current manufactured home snd set new manufactured home: add deck Owner: Scott Junlrin Contractor: Kozeliskv's Home Service WAINS#0626 ****Installer: See Attached Installer Tag**** GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUl1tED: Electrical -Contact Labor & Industries @ 360-417-2702 NOTE: Set-up manual shall be on-site at time of inspection. RF,(li TiRF.TI IN~PF,('TiONS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL See general condition #2 Silt Fence as needed Drive Off Matto prevent sediment from leaving the site FOOTINGS/SLAB Setbacks ~ 0 Forms / Reinforcement FLOOR FRAMING (prior to skirting) Anchors ~L/~4~ 7 Steel Support Piers -Load-stamped and installed per manufacturer's installation mameal,• clearance ofd 8"min. from lowest point of I-beam and the ground or footing for min. of 75% of area under home w/ 12 "mire. elsewhere unless installation manual species; otherwise area around home ceded to rovide runo aw om home. Call 48 hours before you dig for utility line locates ,~, I-800-424-5555 ~~ Yage ~ of 3 ++~ PpmH «BLD02-00: REQUIRED INSPECTIONS APPROVED/DATE PLUMBING: Water Supply -Main shut-off valve (port or ball valve) installed in water supply piping prior to connection to home, min. '/. "diameter, same as supply pipe Pressure Reduction Valve if > 80 psi Hose Bibs (backflow protection required) Pipe Insulation -Outside & in crawl space Pressure Test -100 p.s.i. for IS mirmtes Pressure relief valve drain - to exterior of skirting, exhaust dowmvard between 6"and 24" above ground Drainage Piping -sloped min. '/. "per foot MECHAHICAL Ducts & Duct Insulation Dryer Exhaust -vented to outside. Extension into crawl space requires venting through skirting with no dips; follow dryer manufacturer's instructions; total combined length of ducting not to exceed 14' w/ 2-90° elbows FRAMING: Entry Porch/Deck - Pressure-treated or of natural resistance to decay VAPOR BARRIER 6 mil black poly ground cover (not required where area under home is concrete slab floor with a minimum thickness of 3-% inches) FINAL ~ ~~ Public Works Sign-Off 3 ~! a ~ i (~ Electr cal (L & I) Sign-Off House Number -minimum 5" numbers Plumbing Mechanical v Final -Building ~ ~ E No holes or gaps greater tham %."allowed in skirting. Crawl space ventilation per installation mamial @ minimum twelve (12) 6" x 16"vents located close to corners, on at least two opposing sides for cross ventilation. Crawl space access must provide access to all areas under home, minimum 18 " x 24 ", covered with virryl, pressure treated wood or metal. Call 48 hours before you dig for utility line locates - _ - I-soo-a2a-ssss ~ Page 2 of 3 ~~ ~ ~.._ -~ ~...- _--_~„t -.:_ .. • Perna #BLD02A02 GENERAL CONDITIONS I. Contractors working on this project are required to Gave a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing end graveled construction entrance (see attached details). Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass fmal inspection on your project until Public Works requirements have been completed and inspected. For Public Works. inspection call 385-2294; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Csll for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval .prior to making changes in the field. Contact the Building Department at 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates - 1-800-424-5555 Page 3 of 3 -~. P~