HomeMy WebLinkAboutBLD96-196City of Port Townsend 540 Water Street
Port Townsend, WA 98368
Building and Community Development
BUILDER'S PERMIT AND INSPECTION RECORD
'~ THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-2294 For Inspection
Site Address: WASH90 RK CWASHINGTON STAT Issued: 1130/97
Parcel No: 101341004 Lot: Block:
0196
PERMIT #
Protect: BLD96-0
ONTRACTOR/OWNE OWNE
WASHINGTON STATE PARKS & WASHINGTON STATE PARKS &
RECREATION COMMISSION RECREATION COMMISSION
7150 CLEANWATER LN KY-11 7150 CLEANWATER LN KY-11
PROJECT DESCRIPTIO
Commercial -Interior Remodel of Marine Interpretive Center. Electrical demo. Renovate office w/ new ceiling, flooring
and base horz. slider and FRP ceiling finish at exhibit and corridor area. New electrical, light fixtures, etc.
City Goofed: Construction Type/Occ Use/Occ Load
Type of work: ALT Construction Occupancy
Type or use: PUB Type 1: SN Group 1: A3 Load 1: 140
Census Category: Type 2: Group 2: B Load 2: 6
Estlrnated Value: 339.750.00 Type 3: Group 3: Load 3:
- Zoning: PU8
Tye 4:
Group 4: Load 4:
SI Code:
SPECIAL CONDITIONS/RESTRICTIONS APPLY
'~'~ ~ ~'`~ ~~~~~"~~~~ ~ ~7 REQUIRED INSPECTIONS
~~.~~~7
-SEE LAST PAGE
Inspection
',DEMOLITION Date Inspector Inspection
FINAL Date
•Z~j 1 Inspector
~S
MECHANICAL 2,Z~, cj1 ~ 5 Final-Building
FRAMING Final-MechanicaVHeating
-Ceiling Final-Vapor Banier Cert.
-Window U Value ~~~~ t, Final-Fire Dept. Sign-Off ~
-Air Seal % --~
INSULATION / (gyp
~~
-Wall (R-19) ~~(~ ~ ' Ztt "7 f
'-Wall (R-11)
-Ceiling (R-38) 2 ZZ
-Fill Exposed Cavities
VAPOR BARRIER . 2~f • 'f
~ITING •2~J• S
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
~~
City of Port Townsend PortVTownsend,wAaasaa
Building and Community Development
BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-2294 For Inspection
Site Address: WASH90 RK CWASHINGTON STAT Issued: 1/30197
Parcel No: 101341004
Project:
GENERAL CONDITIONS
PE~IUIIT # Block:
BLD96-00196
1. A separate electrical permH is required for any electrical work.
2. Reinspections are required after any corrections are complete.
3. Final Inspections and approvals are required prior to occupancy.
4. All building permits expire if no progress has been made within six months, or if no inspections have
been made by the Building Department within one year. Call for at least one inspection per year to
keep your building permit active.
5. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2