HomeMy WebLinkAboutBLD96-192City of Port Townsend 640 Water Street
Port Townsend, WA 98966
Building and Community Development
BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD 8 APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-2294 For Inspection
j 1l G~
Site Address: ~JACKMAN ST Issued: 12/17196
Parcel No: 948303608 Lot: Block:
Project: BLD96-00192
-CONTRACTOR/OWNE WNE
KEVIN BOWEN HUNT MANOR PARTNERSHIP
1110 JACKMAN AVE C/O MARY PARKER
PORT TOWNSEND, WA 98368 1110 JACKMAN ST
Residential -Convert Garage space to conditioned living space-
City Contact:
Type of work: ALT
Type of use: SF
Census Category:
Estimated Value: $15.000.00
Zoning: R1
51 Code:
Construction TypelOcc UselOcc Load
Construction r? Occupancy
Type 1'. Group 1: y - ; Load t:
Type 2: Group 2: t- load 2:
Type 3:
Type 4:
Group 3: Load 3:
Group 4: Load 4:
SPECIAL CONDITIONS/RESTRICTIONS APPLY -SEE LAST PAGE
REQUIRED INSPECTIONS
-- ---
Inspection 'I Date Inspector - _ -
~-- -- Inspection , Date n
GROUNDWORK PLUMBING ~. ;-~~" ~~ -Window U Value 'i
PLUMBING ~^ /L S II
_ 7 - f
-Rough-In -Fresh Air Intake (Wall Ports)
-Pipe Insulation !- -Firestopping ~! /~ l/ ]'; ~ 5
-Water Heater ' INSULATION 2 C /~ S
-t 8" A.F.F. I Insp-See Special Conditions '
MECHANICAL VAPOR BARRIER
-Whole House Fan -Paint
_
ifi Fan
ce S ec c
Sour
p
i DRYWALL NAILING ~
3
Z
-Vents A -Walls
FRAMING
Its I
'`
~
~ -Ceiling ~i q
FINAL '11' f ~~
~
~Is -
Final-Building .
"~
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 or 2
City of Port Townsend
Building and Community Development
640 Water Street
Port Townsend, WA 88368
BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-2294 For Inspection
Site Address: 1100 JACKMAN ST
Parcel No: 948303808
Project:
Inspection Date I pector
Final-Plumbing
Fi n a I-Mechanical/Heating
Fina{-Insulation Certificate
Final-Vapor Barrier Cert.
!Final-Smoke Det. Througout
SPECIAL CONDITIONS /RESTRICTIONS
Issued: 72!17198
Lot:
~ mo'o' c~
~~,~~ ~~
~ ~5~~
f ~"~
1 . See Wattsun and approved plans for various R-values for wall insulation.
GENERAL CONDITIONS
1. A separate electrical permit is required for any electrical work.
2. Reinspections are required after any corrections are complete.
3. Final Inspections and approvals are required prior to occupancy.
4. All building permits expire if no progress has been made within six months, or if no inspections have
been made by the Building Department within one year. Call for at least one inspection per year to
keep your building permit active.
5. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
u
•
Call 48 hours before you dig for utility line locates
1-800-424-5555
Block:
BLD96-00192
Page 2 of 2